← Back
Walk-up apt, over six families with stores
1083 CORTELYOU ROAD
BROOKLYN · BIN 3118904
💬 Discuss this project
1910Year Built
4Stories
C7Building Class
C4-4AZoning
10,528 sfGross Floor Area
13Units
Rent Stabilized48 Open Violations ▸FDNY Report ↗
Walk-up apt, over six families with stores · Owner of record: 2129 CORTELYOU RD LLC · 3,000 sf lot · 3.51 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof3p · 1 filing · 12 docs
Floor 14p · 1 filing · 12 docs
1 job · most recent 09/10/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/10/2024Permit IssuedJJS MANAGEMENT INCVentilation Systems
Ventilation
Floaire BDU 24 6,400 CFM · Exhaust Fan ×1
1 job · most recent 09/10/2024
Gas Water/Sanitary
FiledStatusContractorScope
09/10/2024Permit IssuedCAPE PLUMBING INCGas, Water/Sanitary
2 jobs · most recent 05/01/2024
General Wiring
FiledStatusContractorScope
05/01/2024CompleteDELTEX ELECTRICAL CONT. I—
09/05/2023Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
Building Lifecycle
All (83)Filed (3)Permit Issued (3)Violation (60)Inspection (6)Special Inspection (11)
05/04/2026
Violation issued (HPD, open)
A
01/27/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/29/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/18/2025
Violation issued (FDNY_NOV, closed)
02/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/14/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/09/2024
Permit issued — Plumbing
B00908077-S1-PL
09/10/2024
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND EQUIPMENT, NEW FLOOR TILE, NEW KITCHEN HOOD AND ANSUL SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00908077-P1
11/16/2023
Violation issued (HPD, open)
C
11/16/2023
Violation issued (HPD, open)
A
11/16/2023
Violation issued (HPD, open)
B
10/22/2023
Violation issued (HPD, open)
B
10/22/2023
Violation issued (HPD, open)
B
10/12/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/28/2023
Permit issued — Mechanical Systems
B00908077-I1-GC-CX
08/18/2023
Permit issued — Plumbing
B00908077-S1-PL
07/31/2023
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND EQUIPMENT, NEW FLOOR TILE, NEW KITCHEN HOOD AND ANSUL SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00908077-S1
07/31/2023
Filed — Alteration
JOB FILED INTERIOR RENOVATION OF COMMERCIAL STORE INCLUDING NEW COUNTER AND EQUIPMENT, NEW FLOOR TILE, NEW KITCHEN HOOD AND ANSUL SYSTEM AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00908077-I1
07/24/2023
Special inspection requirement — Shutoff dampers
Kevin McCray
07/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
07/24/2023
Special inspection requirement — Tenant Protection Plan Compliance
Alexander Bomstein
07/24/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Kevin McCray
07/24/2023
Special inspection requirement — Maintenance information
Kevin McCray
07/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Kevin McCray
07/24/2023
Special inspection requirement — HVAC-R and service water heating equipment
Kevin McCray
07/24/2023
Special inspection requirement — Interior lighting power
Kevin McCray
07/24/2023
Special inspection requirement — HVAC-R and service water heating system controls
Kevin McCray
07/21/2023
Special inspection requirement — Final
Kevin McCray
07/21/2023
Special inspection requirement — Mechanical Systems
Alexander Bomstein
05/01/2023
Violation issued (HPD, closed)
B
05/01/2023
Violation issued (HPD, open)
A
05/01/2023
Violation issued (HPD, open)
A
05/01/2023
Violation issued (HPD, closed)
B
05/01/2023
Violation issued (HPD, closed)
C
05/01/2023
Violation issued (HPD, open)
A
05/01/2023
Violation issued (HPD, closed)
B
05/01/2023
Violation issued (HPD, closed)
B
04/26/2023
Violation issued (HPD, open)
B
04/26/2023
Violation issued (HPD, open)
B
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/23/2023
Violation issued (FDNY_NOV, closed)
12/07/2022
Violation issued (HPD, open)
C
08/24/2021
Violation issued (HPD, closed)
A
08/24/2021
Violation issued (HPD, open)
B
08/24/2021
Violation issued (HPD, open)
C
08/24/2021
Violation issued (HPD, closed)
A
08/24/2021
Violation issued (HPD, closed)
A
08/24/2021
Violation issued (HPD, closed)
A
08/24/2021
Violation issued (HPD, closed)
A
09/01/2020
Violation issued (FDNY_NOV, closed)
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/22/2017
Violation issued (HPD, closed)
B
11/04/2016
Violation issued (HPD, closed)
I
05/07/2016
Violation issued (HPD, closed)
C
04/18/2016
Violation issued (HPD, open)
B
04/18/2016
Violation issued (HPD, open)
B
01/22/2016
Violation issued (HPD, open)
C
01/22/2016
Violation issued (HPD, open)
A
Latest 60 of 83 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AD HALA WEST AFRICAN TASTE RESTAURA707/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
URBAN ARCHITECTURAL DESIGN, PC209/10/2024
MCCRAY ARCHITECT P.C.107/31/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
YBL NY603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JJS MANAGEMENT INCGeneral Contractor303/21/2026
CAPE PLUMBING INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A&B WORLD CONSULTING, INC5704309/10/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCAPE PLUMBING INC10/09/2024
DOB NOWMechanical SystemsPermit IssuedJJS MANAGEMENT INC08/28/2023
DOB NOWPlumbingPermit IssuedCAPE PLUMBING INC08/18/2023
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/27/2026Pass-Final CND-Occupancy InspectionPassView ↗
09/29/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/14/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
07/24/2023Shutoff dampersKevin McCrayenergy_progress
07/24/2023Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
07/24/2023Tenant Protection Plan ComplianceAlexander Bomsteinspecial
07/24/2023HVAC-R and service water piping design and insulationKevin McCrayenergy_progress
07/24/2023Maintenance informationKevin McCrayenergy_progress
07/24/2023Energy Code Compliance InspectionsKevin McCrayprogress
07/24/2023HVAC-R and service water heating equipmentKevin McCrayenergy_progress
07/24/2023Interior lighting powerKevin McCrayenergy_progress
07/24/2023HVAC-R and service water heating system controlsKevin McCrayenergy_progress
07/21/2023FinalKevin McCrayprogress
07/21/2023Mechanical SystemsAlexander Bomsteinspecial
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026B00908077-S1Contact architect ↗
08/24/2026B00908077-I1Contact architect ↗
08/24/2026B00908077-P1Contact architect ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026B00908077-S1Open ↗
08/24/2026B00908077-I1Open ↗
08/24/2026B00908077-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026B00908077-I1Open ↗
09/02/2026B00908077-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026B00908077-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/24/2026B00908077-S1Open ↗
08/24/2026B00908077-P1Open ↗
08/24/2026B00908077-I1Open ↗