← Back
Two family frame
493 STRATFORD ROAD
BROOKLYN · BIN 3119282
💬 Discuss this project
1899Year Built
2.75Stories
B2Building Class
R3XZoning
2,596 sfGross Floor Area
2Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Two family frame · 4,000 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Floor 26p · 3 filings · 20 docs
Floor 1
Cellar1p · 1 filing · 12 docs
1 job · most recent 09/23/2020
General Wiring
FiledStatusContractorScope
09/23/2020Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
Building Lifecycle
All (38)Filed (5)Permit Issued (5)Signed Off (3)Violation (14)Inspection (1)Objection (4)Special Inspection (6)
05/07/2026
Violation issued (HPD, open)
A
01/29/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/12/2025
Violation issued (HPD, closed)
A
11/27/2024
Violation issued (HPD, closed)
I
04/16/2024
Violation issued (HPD, closed)
A
11/20/2023
Violation issued (HPD, closed)
I
03/29/2023
Violation issued (HPD, closed)
A
11/09/2022
Violation issued (HPD, closed)
I
10/05/2022
Signed off — Alteration
Provide two new gas-fired tank-type domestic water heaters in cellar; remove 1st floor kitchen and install new kitchen in another location; install new laundry equipment on 1st floor and new gas dryer in attic; replace the existing water service with new
B00416558-I1
09/30/2022
Signed off — Alteration
B00416415-I1
08/25/2022
Signed off — Alteration
Combine Apt 2 on 2nd & Apt 3 on Attic. On 2nd replace res. sink, remove Elec. stove, install new kitchen. Attic: remove res. sink, Elec. stove, add Elec.WD dryer, 1 new bath RM relocate 1 bath RM. OT filed under Alt-II # 32208447
B00341955-I1
03/08/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
A
10/11/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
GUNJAN KHANDWALA
10/11/2021
Special inspection requirement — Energy Code Compliance Inspections
GUNJAN KHANDWALA
10/11/2021
Special inspection requirement — HVAC insulation and sealing
GUNJAN KHANDWALA
10/11/2021
Special inspection requirement — HVAC and service water heating system controls
GUNJAN KHANDWALA
10/11/2021
Special inspection requirement — HVAC and service water heating equipment
GUNJAN KHANDWALA
10/11/2021
Special inspection requirement — Maintenance information
GUNJAN KHANDWALA
10/07/2021
Objection resolved — Addressed
10/07/2021
Objection resolved — Addressed
09/19/2021
Objection raised — Scope
09/19/2021
Objection raised — Scope
09/15/2021
Filed — Alteration
Provide two new gas-fired tank-type domestic water heaters in cellar; remove 1st floor kitchen and install new kitchen in another location; install new laundry equipment on 1st floor and new gas dryer in attic; replace the existing water service with new
B00416558-P1
07/21/2021
Permit issued — Plumbing
B00416558-I1-PL
07/08/2021
Permit issued — Plumbing
B00341955-I1-PL
06/23/2021
Permit issued — Mechanical Systems
B00416415-I1-MS
05/12/2021
Permit issued — Plumbing
B00416558-I1-PL
04/16/2021
Violation issued (HPD, closed)
I
04/16/2021
Violation issued (HPD, closed)
A
11/12/2020
Filed — Alteration
Provide two new gas-fired tank-type domestic water heaters in cellar; remove 1st floor kitchen and install new kitchen in another location; install new laundry equipment on 1st floor and new gas dryer in attic; replace the existing water service with new
B00416558-I1
11/12/2020
Filed — Alteration
B00416415-I1
10/08/2020
Filed — Alteration
Combine Apt 2 on 2nd & Apt 3 on Attic. On 2nd replace res. sink, remove Elec. stove, install new kitchen. Attic: remove res. sink, Elec. stove, add Elec.WD dryer, 1 new bath RM relocate 1 bath RM. OT filed under Alt-II # 32208447
B00341955-P4
08/26/2020
Permit issued — Plumbing
B00341955-I1-PL
05/01/2020
Filed — Alteration
Combine Apt 2 on 2nd & Apt 3 on Attic. On 2nd replace res. sink, remove Elec. stove, install new kitchen. Attic: remove res. sink, Elec. stove, add Elec.WD dryer, 1 new bath RM relocate 1 bath RM. OT filed under Alt-II # 32208447
B00341955-I1
11/04/2019
Violation issued (HPD, closed)
I
10/24/2018
Violation issued (HPD, closed)
I
03/02/2015
Violation issued (HPD, closed)
I
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
493 STRATFORD ROAD303/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/12/2019$1.5M—— → —$589/sf building
07/03/2019$1.3M—— → —$493/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KEVIN GALLEN PE LLC309/15/2021
I-BEAM DESIGN210/08/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MITRA MEHR1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZONE PLUMBING & HEATING CPlumbing407/08/2026
365 W MECHANICAL CORPGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASSURE PROFESSIONAL ENGIN6962309/15/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C07/21/2021
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C07/08/2021
DOB NOWMechanical SystemsSigned-off365 W MECHANICAL CORP06/23/2021
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C05/12/2021
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C08/26/2020
BISOTISSUEDSJ EMPIRE CORP06/24/2021
BISOTISSUEDSJ EMPIRE CORP10/27/2020
BISOTISSUEDSJ EMPIRE CORP09/16/2020
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/29/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
10/11/2021Fire-Resistant Penetrations and JointsGUNJAN KHANDWALAspecial
10/11/2021Energy Code Compliance InspectionsGUNJAN KHANDWALAprogress
10/11/2021HVAC insulation and sealing GUNJAN KHANDWALAenergy_progress
10/11/2021HVAC and service water heating system controls GUNJAN KHANDWALAenergy_progress
10/11/2021HVAC and service water heating equipment GUNJAN KHANDWALAenergy_progress
10/11/2021Maintenance informationGUNJAN KHANDWALAenergy_progress
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing4
09/02/2026B00341955-I1Request digital key ↗
09/02/2026B00416558-I1Request digital key ↗
09/02/2026B00416558-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00416415-I1Request digital key ↗
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION8
04/21/2023340779679Open ↗
04/17/2023340779679Open ↗
04/07/2023340779679Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION1
06/24/2021340779679Open ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature5
08/23/2026B00416558-I1Open ↗
08/23/2026B00416558-I1Open ↗
08/23/2026B00416558-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/02/2026B00416558-I1Open ↗
09/02/2026B00416558-P1Open ↗
09/02/2026B00416415-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/17/2020340779679Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/17/2020340779679Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B00416558-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/02/2026B00416415-I1Open ↗
08/13/2026B00341955-P4Open ↗
08/13/2026B00341955-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/17/2020340779679Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/02/2026B00416558-I1Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
04/21/2023340779679Open ↗
04/14/2023340779679Open ↗
04/13/2023340779679Open ↗
Showing 3 of 6 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
06/22/2021340779679Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
06/22/2021340779679Open ↗
▸BISINTERIOR LIGHTING POWER1
05/15/2023340779679Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/23/2021340779679Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/15/2023340779679Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/15/2023340779679Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/17/2020340779679Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/02/2026B00416558-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY2
05/17/2023340779679Open ↗
01/19/2023340779679Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/15/2023340779679Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/15/2023340779679Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
06/22/2021340779679Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
05/24/2023340779679Open ↗
▸BISFINAL1
05/15/2023340779679Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
01/25/2021340779679Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
05/23/2023340779679Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
05/15/2023340779679Open ↗
12/22/2020340779679Open ↗
12/15/2020340779679Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/17/2020340779679Open ↗