Three families
1762 NOSTRAND AVENUE
BROOKLYN · BIN 3120024
💬 Discuss this project
1931Year Built
3Stories
C0Building Class
R6Zoning
3,120 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Three families · Owner of record: NST 1762 LLC · 2,000 sf lot · 1.56 FAR built · Flood zone X
Locations of Work
ArchitectureFire ProtectionGeneral
Roof17p · 1 filing · 20 docs
Floor 318p · 1 filing · 20 docs
Floor 215p · 1 filing · 20 docs
Floor 115p · 1 filing · 20 docs
Cellar17p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MZS REALTY1507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/05/2019$500K—Private party → 1762 NOSTRAND LLC$160/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LESTER KATZ, NCARB701/06/2026
PRAMODRAY SHAH, P.E.311/10/2025
VASILIOS ARTEMIOU PE108/01/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
XPDITE GROUP LLC (104)1103/21/2026
XPDITE GROUP LLC 104303/21/2026
XPDITE GROUP 103103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABOVE BUILDER GROUP LLCGeneral Contractor307/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616801/06/2026
Building Lifecycle
All (93)Filed (11)Permit Issued (5)Signed Off (5)Violation (3)Inspection (9)Objection (30)Special Inspection (30)
03/27/2026
Signed off — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING THREE STORY + CELLAR TWO FAMILY MIXED USE BUILDING INTO A TEN (10) FAMILY RESIDENTIAL BUIDLING
B01023303-I1
02/09/2026
Signed off — Alteration
SELF-CERT SPRINKLER APPLICATION FILED HEREWITH FOR PROPOSED SPRINKLER WORK
B01309300-I1
01/21/2026
Signed off — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING THREE STORY + CELLAR TWO FAMILY MIXED USE BUILDING INTO A TEN (10) FAMILY RESIDENTIAL BUIDLING
B01023303-S2
01/21/2026
Signed off — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING THREE STORY + CELLAR TWO FAMILY MIXED USE BUILDING INTO A TEN (10) FAMILY RESIDENTIAL BUIDLING
B01023303-S1
01/09/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
01/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
01/09/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
01/09/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
01/09/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
01/09/2026
Special inspection requirement — Metering
FAHAD FATEH
01/09/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
01/09/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
01/09/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
01/09/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
01/09/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
01/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
01/09/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/07/2026
Objection raised — Admin
01/07/2026
Objection resolved — Addressed
01/06/2026
Filed — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING THREE STORY + CELLAR TWO FAMILY MIXED USE BUILDING INTO A TEN (10) FAMILY RESIDENTIAL BUIDLING
B01023303-P9
01/06/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/06/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
01/06/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
01/06/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
01/06/2026
Special inspection requirement — Metering
FAHAD FATEH
01/06/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
01/06/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
01/06/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
01/06/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
01/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
01/06/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
01/06/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
12/03/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
11/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/18/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/14/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/13/2025
Permit issued — Sprinklers
B01309300-I1-EW-SP
11/10/2025
Filed — Alteration
SELF-CERT SPRINKLER APPLICATION FILED HEREWITH FOR PROPOSED SPRINKLER WORK
B01309300-I1
10/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
09/09/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/03/2025
Filed — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING THREE STORY + CELLAR TWO FAMILY MIXED USE BUILDING INTO A TEN (10) FAMILY RESIDENTIAL BUIDLING
B01023303-P7
08/28/2025
Signed off — Alteration
APPLICATION FILED HERWITH FOR THE INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE
B01229416-I1
08/27/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/26/2025
Objection resolved — Addressed
08/25/2025
Objection raised — Other
08/11/2025
Filed — Alteration CO
APPLICATION FILED HEREWITH TO CONVERT AN EXISTING THREE STORY + CELLAR TWO FAMILY MIXED USE BUILDING INTO A TEN (10) FAMILY RESIDENTIAL BUIDLING
B01023303-P5
07/07/2025
Filed — Alteration
PLUMBING APPLICATION FILED HEREWITH FOR PLUMBING WORK RISER INFORMATION ONLY
B01251752-I1
07/07/2025
Filed — Alteration
PLUMBING APPLICATION FILED HEREWITH FOR PLUMBING WORK RISER INFORMATION ONLY
B01251752-S1
06/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/24/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/23/2025
Permit issued — Construction Fence
B01229416-I1-FN
06/09/2025
Objection resolved — Addressed
06/09/2025
Objection resolved — Addressed
06/06/2025
Objection raised — Scope
06/06/2025
Objection raised — Scope
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offA M B MECHANICAL INC11/13/2025
DOB NOWConstruction FenceSigned-offABOVE BUILDER GROUP LLC06/23/2025
DOB NOWMechanical SystemsSigned-offABOVE BUILDER GROUP LLC05/29/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN05/27/2025
DOB NOWGeneral ConstructionPermit IssuedABOVE BUILDER GROUP LLC05/23/2025
2 projects · most recent 01/06/2026
Sprinkler System
FiledStatusContractorScope
01/06/2026——Sprinkler System
07/07/2025——52 heads
2 projects · most recent 01/06/2026
Water/Sanitary
FiledStatusContractorScope
01/06/2026Signed-offPRIME PIPING & HEATING INWater/Sanitary
07/07/2025——Water/Sanitary
1 project · most recent 01/14/2026
General Wiring
FiledStatusContractorScope
01/14/2026CompleteAMERICAN POWER ELECT CONSGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/03/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
11/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/18/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/14/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/27/2025Fail-Final CND-Occupancy InspectionFailView ↗
06/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/24/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
01/09/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
01/09/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
01/09/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
01/09/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
01/09/2026Exterior lighting powerFAHAD FATEHenergy_progress
01/09/2026MeteringFAHAD FATEHenergy_progress
01/09/2026Fenestration areasFAHAD FATEHenergy_progress
01/09/2026Lighting controlsFAHAD FATEHenergy_progress
01/09/2026Maintenance informationFAHAD FATEHenergy_progress
01/09/2026Fenestration air leakageFAHAD FATEHenergy_progress
01/09/2026Interior lighting powerFAHAD FATEHenergy_progress
01/09/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/09/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
01/09/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/06/2026Interior lighting powerFAHAD FATEHenergy_progress
01/06/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/06/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
01/06/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/06/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
01/06/2026Maintenance informationFAHAD FATEHenergy_progress
01/06/2026MeteringFAHAD FATEHenergy_progress
01/06/2026Exterior lighting powerFAHAD FATEHenergy_progress
01/06/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
01/06/2026Lighting controlsFAHAD FATEHenergy_progress
01/06/2026Fenestration air leakageFAHAD FATEHenergy_progress
Latest 25 of 52.
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/21/2026B01229416-I1Request digital key ↗
08/21/2026B01251752-I1Request digital key ↗
08/21/2026B01251752-S1Request digital key ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01023303-I1Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/21/2026B01251752-S1Open ↗
08/21/2026B01251752-I1Open ↗
08/19/2026B01309300-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/27/2026B01023303-P7Open ↗
08/27/2026B01023303-P7Open ↗
08/27/2026B01023303-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/19/2026B01023303-S3Open ↗
08/27/2026B01023303-P7Open ↗
08/27/2026B01023303-S1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026B01023303-I1Open ↗
08/13/2026B01023303-P7Open ↗
08/13/2026B01023303-P9Open ↗
▸Other Documents4
▸DOB NOWProperty Ownership Certification3
08/13/2026B01023303-P9Open ↗
08/13/2026B01023303-P7Open ↗
08/13/2026B01023303-I1Open ↗
▸DOB NOWFinal Survey1
08/21/2026B01023303-I1Open ↗