← Back
Two stories - detached, small or mid-size
660 EAST 19 STREET
BROOKLYN · BIN 3121347
💬 Discuss this project
1915Year Built
2.5Stories
A1Building Class
R1-2Zoning
2,131 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: ESP 660 E 19TH LLC · 5,000 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 13 docs
Floor 3Under Construction10p · 1 filing · 20 docs
Floor 2Under Construction5p · 1 filing · 20 docs
Floor 1Under Construction5p · 1 filing · 20 docs
CellarUnder Construction10p · 1 filing · 20 docs
Basement1p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EASY STREET PROPERTIES1508/05/2026
ESP 660 E 19TH LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/23/2025$1.3M—Private party → ESP 660 E 19TH LLC$610/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KAMTECH RESTORATION CORP203/21/2026
OPERA STUDIO ARCHITECTURE LLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAHIM HOME IMPROVEMENTLLCGeneral Contractor408/05/2026
KAMTECH RESTORATION CORPGeneral Contractor203/21/2026
BERGER QUALITY ELEC'L CONElectrical103/22/2026
SUPER COOL HVAC, LLCGeneral Contractor104/09/2026
MEGA PLBG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854205/29/2026
OPERA STUDIO ARCHITECTURE5970411/13/2025
Building Lifecycle
All (68)Filed (7)Permit Issued (7)Signed Off (1)Violation (3)Inspection (11)Objection (16)Special Inspection (23)
08/04/2026
Permit issued — General Construction
B01228549-I1-GC
08/04/2026
Permit issued — Construction Fence
B01306908-I1-FN
07/22/2026
Signed off — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01346445-I1
06/16/2026
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
06/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
06/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
06/16/2026
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
06/16/2026
Special inspection requirement — Final
TOM PETERSEN
05/29/2026
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01346445-P1
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
05/29/2026
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
05/29/2026
Special inspection requirement — Final
TOM PETERSEN
05/29/2026
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
05/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
04/22/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
04/06/2026
Inspection — Fail-Final SP - Up to 3 Requested Floors
Fail
View inspection ↗
02/06/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/05/2026
Permit issued — Solar
B01346445-I1-SL
01/30/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/29/2026
Permit issued — Plumbing
B01228549-S2-PL
01/27/2026
Permit issued — Mechanical Systems
B01228549-S1-MS
01/21/2026
Objection raised — Admin
01/21/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/15/2026
Objection resolved — Addressed
01/14/2026
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B01346445-I1
01/08/2026
Objection raised — Plumbing
01/07/2026
Objection resolved — Addressed
12/22/2025
Objection resolved — Addressed
12/21/2025
Objection resolved — Addressed
12/16/2025
Permit issued — Construction Fence
B01306908-I1-FN
12/06/2025
Objection resolved — Addressed
11/30/2025
Objection resolved — Addressed
11/20/2025
Objection raised — Plumbing
11/20/2025
Objection raised — Plumbing
11/20/2025
Objection raised — Plumbing
11/20/2025
Objection raised — Plumbing
11/19/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/14/2025
Objection raised — Zoning
11/14/2025
Objection raised — Zoning
11/13/2025
Filed — Alteration
Interior renovation of the cellar, 1st, 2nd and 3rd floors. No change of use, egress, or occupancy
B01228549-S1
11/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
Thomas Barry
11/12/2025
Special inspection requirement — Maintenance information
Thomas Barry
11/12/2025
Special inspection requirement — Shutoff dampers
Thomas Barry
11/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Thomas Barry
11/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
Thomas Barry
11/11/2025
Filed — Alteration
Interior renovation of the cellar, 1st, 2nd and 3rd floors. No change of use, egress, or occupancy
B01228549-S2
11/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Thomas Barry
10/29/2025
Special inspection requirement — Mechanical Systems
Thomas Barry
10/29/2025
Special inspection requirement — Final
Thomas Barry
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
10/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Thomas Barry
10/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
Thomas Barry
10/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
Thomas Barry
10/29/2025
Special inspection requirement — Maintenance information
Thomas Barry
10/22/2025
Filed — Alteration
B01306908-I1
09/18/2025
Filed — Alteration
Interior renovation of the cellar, 1st, 2nd and 3rd floors. No change of use, egress, or occupancy
B01228549-P1
Latest 60 of 68 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRAHIM HOME IMPROVEMENTLLC08/04/2026
DOB NOWConstruction FenceSigned-offRAHIM HOME IMPROVEMENTLLC08/04/2026
DOB NOWSolarSigned-offKAMTECH RESTORATION CORP02/05/2026
DOB NOWPlumbingPermit IssuedMEGA PLBG CORP01/29/2026
DOB NOWMechanical SystemsSigned-offSUPER COOL HVAC, LLC01/27/2026
DOB NOWConstruction FenceSigned-offRAHIM HOME IMPROVEMENTLLC12/16/2025
DOB NOWGeneral ConstructionSigned-offRAHIM HOME IMPROVEMENTLLC07/17/2025
1 job · most recent 11/13/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
11/13/2025Signed-offRAHIM HOME IMPROVEMENTLLCHeating and Air Conditioning Systems, Ventilation Systems
1 job · most recent 11/13/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/13/2025Permit IssuedMEGA PLBG CORPGas, Water/Sanitary
2 jobs · most recent 06/01/2026
General Wiring
FiledStatusContractorScope
06/01/2026CompleteBERGER QUALITY ELEC'L CON—
10/08/2025Permit IssuedSTELLMANN ELECTRICAL CORPGeneral Wiring
1 job · most recent 05/29/2026
FiledStatusContractorScope
05/29/2026Signed-offKAMTECH RESTORATION CORP42 panels, 19.11 kw, 745 roof_area_sqft
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/22/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
04/06/2026Fail-Final SP - Up to 3 Requested FloorsFailView ↗
02/06/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/30/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
02/17/2023Fail-Final CND-Occupancy InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
06/16/2026Air barrier - visual inspectionTOM PETERSENenergy_progress
06/16/2026Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
06/16/2026Fire-Resistant Penetrations and JointsTOM PETERSENspecial
06/16/2026Energy Code Compliance InspectionsTOM PETERSENprogress
06/16/2026FinalTOM PETERSENprogress
05/29/2026Fire-Resistant Penetrations and JointsTOM PETERSENspecial
05/29/2026Air barrier - visual inspectionTOM PETERSENenergy_progress
05/29/2026FinalTOM PETERSENprogress
05/29/2026Energy Code Compliance InspectionsTOM PETERSENprogress
05/29/2026Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
11/12/2025HVAC-R and service water heating equipmentThomas Barryenergy_progress
11/12/2025Maintenance informationThomas Barryenergy_progress
11/12/2025Shutoff dampersThomas Barryenergy_progress
11/12/2025HVAC-R and service water piping design and insulationThomas Barryenergy_progress
11/12/2025HVAC-R and service water heating system controlsThomas Barryenergy_progress
10/29/2025Energy Code Compliance InspectionsThomas Barryprogress
10/29/2025Mechanical SystemsThomas Barryspecial
10/29/2025FinalThomas Barryprogress
10/29/2025Fire-Resistant Penetrations and JointsThomas Barryspecial
10/29/2025HVAC-R and service water piping design and insulationThomas Barryenergy_progress
10/29/2025HVAC-R and service water heating equipmentThomas Barryenergy_progress
10/29/2025HVAC-R and service water heating system controlsThomas Barryenergy_progress
10/29/2025Maintenance informationThomas Barryenergy_progress
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/20/2026B01306908-I1Request digital key ↗
08/19/2026B01228549-S2Request digital key ↗
08/19/2026B01228549-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit6
08/16/2026B01346445-P1Open ↗
08/13/2026B01228549-I1Open ↗
08/13/2026B01228549-P1Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026B01228549-S1Open ↗
09/23/2026B01228549-S1Open ↗
09/01/2026B01346445-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/20/2026B01306908-I1Open ↗
08/19/2026B01228549-I1Open ↗
08/19/2026B01228549-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026B01228549-S1Open ↗
09/01/2026B01346445-I1Open ↗
09/01/2026B01346445-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/19/2026B01228549-S2Open ↗
08/19/2026B01228549-S1Open ↗
08/19/2026B01228549-P1Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/16/2026B01346445-I1Open ↗