← Back
One family attached or semi-detached
117 SHERMAN STREET
BROOKLYN · BIN 3121909
💬 Discuss this project
1905Year Built
2Stories
A5Building Class
R5BZoning
1,452 sfGross Floor Area
1Units
One family attached or semi-detached · 1,700 sf lot · 0.85 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Roof1p · 1 filing · 17 docs
Basement4p · 1 filing · 17 docs
1 job · most recent 08/22/2022
General Wiring
FiledStatusContractorScope
08/22/2022Permit IssuedBLAZE ELECTRIC INC.General Wiring
Building Lifecycle
All (53)Filed (4)Permit Issued (3)Signed Off (3)Inspection (5)Objection (34)Special Inspection (4)
09/25/2023
Signed off — Alteration
This application consists of reutilizing existing gas meter, disconnecting gas supply to demolished boiler, keeping existing gas piping to existing hot water heater and existing range, and adding new gas riser to connect to new AHU gas fired on the roof.
B00590299-S1
07/28/2023
Signed off — Alteration
This application consists of reutilizing existing gas meter, disconnecting gas supply to demolished boiler, keeping existing gas piping to existing hot water heater and existing range, and adding new gas riser to connect to new AHU gas fired on the roof.
B00590299-S2
07/07/2023
Signed off — Alteration
This application consists of reutilizing existing gas meter, disconnecting gas supply to demolished boiler, keeping existing gas piping to existing hot water heater and existing range, and adding new gas riser to connect to new AHU gas fired on the roof.
B00590299-I1
06/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
TENZIN NYANDAK
06/26/2023
Filed — Alteration
This application consists of reutilizing existing gas meter, disconnecting gas supply to demolished boiler, keeping existing gas piping to existing hot water heater and existing range, and adding new gas riser to connect to new AHU gas fired on the roof.
B00590299-P1
05/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
TENZIN NYANDAK
05/02/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/27/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/31/2023
Permit issued — General Construction
B00590299-I1-GC
01/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/26/2023
Objection resolved — Addressed
01/19/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/05/2023
Permit issued — Plumbing
B00590299-S1-PL
12/20/2022
Objection raised — Zoning
12/09/2022
Objection resolved — Addressed
12/09/2022
Objection resolved — Addressed
12/06/2022
Objection raised — Zoning
11/22/2022
Objection resolved — Addressed
11/22/2022
Objection resolved — Addressed
11/22/2022
Objection resolved — Addressed
11/22/2022
Objection resolved — Addressed
11/22/2022
Objection resolved — Addressed
09/07/2022
Objection resolved — Addressed
08/30/2022
Objection raised — Other
08/30/2022
Objection raised — Other
08/30/2022
Objection raised — Other
08/18/2022
Permit issued — Mechanical Systems
B00590299-S2-MS
08/09/2022
Objection raised — Scope
07/26/2022
Objection resolved — Addressed
07/20/2022
Objection resolved — Addressed
07/20/2022
Objection resolved — Addressed
07/20/2022
Objection resolved — Addressed
07/20/2022
Objection resolved — Addressed
06/10/2022
Filed — Alteration
This application consists of reutilizing existing gas meter, disconnecting gas supply to demolished boiler, keeping existing gas piping to existing hot water heater and existing range, and adding new gas riser to connect to new AHU gas fired on the roof.
B00590299-S2
06/07/2022
Filed — Alteration
This application consists of reutilizing existing gas meter, disconnecting gas supply to demolished boiler, keeping existing gas piping to existing hot water heater and existing range, and adding new gas riser to connect to new AHU gas fired on the roof.
B00590299-S1
06/06/2022
Objection resolved — Addressed
06/06/2022
Objection resolved — Addressed
06/06/2022
Objection resolved — Addressed
05/20/2022
Special inspection requirement — Mechanical Systems
TENZIN NYANDAK
05/20/2022
Special inspection requirement — Final
Yevgeniya Peysin
05/17/2022
Objection raised — Scope
05/17/2022
Objection raised — Zoning
05/17/2022
Objection raised — Other
05/17/2022
Objection raised — Inspections
05/17/2022
Objection raised — Fire_Protection
05/17/2022
Objection raised — Other
05/17/2022
Objection raised — Energy
05/17/2022
Objection raised — Scope
05/17/2022
Objection raised — Scope
05/17/2022
Objection raised — Other
05/17/2022
Objection raised — Fire_Protection
05/13/2022
Filed — Alteration
This application consists of reutilizing existing gas meter, disconnecting gas supply to demolished boiler, keeping existing gas piping to existing hot water heater and existing range, and adding new gas riser to connect to new AHU gas fired on the roof.
B00590299-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NY CLASS CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/07/2014$1.5M—Private party → Private party$1,012/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
C&B CONSULTING ENGINEERS LLC306/26/2023
JENNY PEYSIN ARCHITECTURE PLLC105/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEXUS CONSULTING NYC, INC803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY CLASS CONSTRUCTION LLCGeneral Contractor407/08/2026
BLAZE ELECTRIC INC.Electrical103/22/2026
SCARPONI&SON PLBG&HTG CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STUDIO NYANDAK ARCHITECTU8378306/26/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNY CLASS CONSTRUCTION LLC01/31/2023
DOB NOWPlumbingSigned-offSCARPONI&SON PLBG&HTG COR01/05/2023
DOB NOWMechanical SystemsSigned-offNY CLASS CONSTRUCTION LLC08/18/2022
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/02/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/26/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/19/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
06/30/2023Fire-Resistant Penetrations and JointsTENZIN NYANDAKspecial
05/03/2023Fire-Resistant Penetrations and JointsTENZIN NYANDAKspecial
05/20/2022Mechanical SystemsTENZIN NYANDAKspecial
05/20/2022FinalYevgeniya Peysinprogress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/29/2026B00590299-S1Request digital key ↗
08/29/2026B00590299-P1Request digital key ↗
08/29/2026B00590299-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/29/2026B00590299-I1Open ↗
08/29/2026B00590299-S1Open ↗
08/29/2026B00590299-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026B00590299-P1Open ↗
08/24/2026B00590299-S1Open ↗
08/23/2026B00590299-S2Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026B00590299-S2Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026B00590299-S1Open ↗
08/29/2026B00590299-P1Open ↗
08/29/2026B00590299-S2Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00590299-I1Open ↗