Two family brick
98 PROSPECT PARK SW
BROOKLYN · BIN 3121971
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R6AZoning
2,560 sfGross Floor Area
2Units
Two family brick · Owner of record: 98 PPSW LLC · 4,079 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof6p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 27p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar5p · 1 filing · 20 docs
1 job · most recent 05/30/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/30/2023——Gas, Storm, Water/Sanitary
1 job · most recent 05/30/2023
FiledStatusContractorScope
05/30/2023——1 scope_items
1 job · most recent 05/02/2023
Fence
FiledStatusContractorScope
05/02/2023——Fence
Building Lifecycle
All (40)Filed (8)Objection (2)Special Inspection (30)
05/30/2023
Filed — Alteration CO
Foundation subsequent application filed in conjunction with an alteration to a one family, two story and cellar building
B00807613-S5
05/30/2023
Filed — Alteration CO
Foundation subsequent application filed in conjunction with an alteration to a one family, two story and cellar building
B00807613-S6
05/26/2023
Special inspection requirement — Duct leakage testing, insulation and design
05/26/2023
Special inspection requirement — Ventilation and air distribution system
05/19/2023
Special inspection requirement — HVAC-R and service water heating equipment
05/19/2023
Special inspection requirement — Maintenance information
05/19/2023
Special inspection requirement — HVAC-R and service water heating system controls
05/19/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
05/18/2023
Special inspection requirement — Energy Code Compliance Inspections
05/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
05/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/17/2023
Special inspection requirement — Final
05/17/2023
Special inspection requirement — Mechanical Systems
05/02/2023
Filed — Alteration
Install an 8'-0" high temporary construction fence in conjunction with ALT CO application #B00807613
B00867136-I1
04/26/2023
Filed — Alteration CO
Foundation subsequent application filed in conjunction with an alteration to a one family, two story and cellar building
B00807613-S2
04/25/2023
Filed — Alteration CO
Foundation subsequent application filed in conjunction with an alteration to a one family, two story and cellar building
B00807613-S3
04/19/2023
Special inspection requirement — Structural Steel - High Strength Bolting
04/19/2023
Special inspection requirement — Structural Steel - Details
04/19/2023
Special inspection requirement — Structural Steel - Welding
04/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/19/2023
Special inspection requirement — Masonry
04/19/2023
Special inspection requirement — Structural Cold-Formed Steel
04/14/2023
Filed — Alteration CO
Foundation subsequent application filed in conjunction with an alteration to a one family, two story and cellar building
B00807613-S4
04/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/13/2023
Special inspection requirement — Concrete - Cast-In-Place
04/13/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/13/2023
Special inspection requirement — Subgrade Inspections
04/13/2023
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
04/06/2023
Filed — Alteration CO
Foundation subsequent application filed in conjunction with an alteration to a one family, two story and cellar building
B00807613-S1
03/28/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/28/2023
Special inspection requirement — Footing and Foundation
03/28/2023
Special inspection requirement — Final
03/26/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
03/26/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
03/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/26/2023
Special inspection requirement — Subgrade Inspections
02/09/2023
Special inspection requirement — Final
01/27/2023
Objection raised — Other
01/27/2023
Objection resolved — Addressed
01/14/2023
Filed — Alteration CO
Foundation subsequent application filed in conjunction with an alteration to a one family, two story and cellar building
B00807613-I1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/05/2022$3.0M—Private party → 98 PPSW LLC$1,191/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&D ENGINEERING, PLLC205/30/2023
STUDIO GALLOS505/02/2023
STRUCTURAL ENGINEERING TECHNOLOGIES104/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RICHARD WAINER ARCHITECT, PLLC1603/21/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
05/26/2023Duct leakage testing, insulation and design—energy_progress
05/26/2023Ventilation and air distribution system—energy_progress
05/19/2023HVAC-R and service water heating equipment—energy_progress
05/19/2023Maintenance information—energy_progress
05/19/2023HVAC-R and service water heating system controls—energy_progress
05/19/2023HVAC-R and service water piping design and insulation—energy_progress
05/18/2023Energy Code Compliance Inspections—progress
05/18/2023Fire-Resistance Rated Construction—progress
05/18/2023Fire-Resistant Penetrations and Joints—special
05/17/2023Final—progress
05/17/2023Mechanical Systems—special
04/19/2023Structural Steel - High Strength Bolting—special
04/19/2023Structural Steel - Details—special
04/19/2023Structural Steel - Welding—special
04/19/2023Structural Stability – Alterations of existing buildings—special
04/19/2023Masonry—special
04/19/2023Structural Cold-Formed Steel—special
04/14/2023Structural Stability – Alterations of existing buildings—special
04/13/2023Concrete - Cast-In-Place—special
04/13/2023Excavations - Sheeting, Shoring, and Bracing—special
04/13/2023Subgrade Inspections—special
04/13/2023Underpinning and alternate methods of support of buildings and adjacent property—special
03/28/2023Structural Stability – Alterations of existing buildings—special
03/28/2023Footing and Foundation—progress
03/28/2023Final—progress
Latest 25 of 32.
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026B00807613-S1Request digital key ↗
08/27/2026B00807613-S6Request digital key ↗
08/27/2026B00807613-S4Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/13/2026B00807613-S5Open ↗
08/13/2026B00807613-S6Open ↗
08/13/2026B00807613-S2Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00807613-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B00807613-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/13/2026B00807613-I1Open ↗
08/13/2026B00807613-S4Open ↗
08/13/2026B00807613-S5Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports3
▸DOB NOWGeotechnical Report (BC 1803.6)3
08/13/2026B00807613-S2Open ↗
08/13/2026B00807613-S4Open ↗
08/13/2026B00807613-S1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/13/2026B00807613-I1Open ↗