← Back
Five to six families
318 GREENWOOD AVENUE
BROOKLYN · BIN 3122762
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R5Zoning
2,430 sfGross Floor Area
5Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: GREENWOOD PROPERTIES REALTY GROUP LLC · 3,000 sf lot · 0.81 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 15 docs
1 job · most recent 10/21/2019
FiledStatusContractorScope
10/21/2019CompleteVENTURE HOME SOLAR LLC—
2 jobs · most recent 12/21/2022
Concrete
FiledStatusContractorScope
12/21/2022——1 scope_items
09/19/2022——Concrete
Building Lifecycle
All (72)Filed (7)Permit Issued (3)Signed Off (2)Violation (15)Inspection (4)Objection (24)Special Inspection (17)
05/04/2026
Violation issued (HPD, open)
A
05/21/2024
Signed off — Alteration
INTERIOR RENOVATION OF CELLAR IN MULTI- FAMILY DWELLING. PLUMBING TO BE FILED SEPERATELY ON DOB NOW. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00749795-I1
05/10/2024
Signed off — Alteration
INTERIOR RENOVATION OF CELLAR IN MULTI- FAMILY DWELLING (PLUMBING WORK). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00749817-I1
04/22/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/22/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/10/2024
Violation issued (HPD, closed)
A
04/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/02/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
01/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Smerina
01/22/2024
Filed — Alteration
INTERIOR RENOVATION OF CELLAR IN MULTI- FAMILY DWELLING (PLUMBING WORK). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00749817-P2
01/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Smerina
12/07/2023
Permit issued — Plumbing
B00749817-I1-PL
11/09/2023
Permit issued — General Construction
B00749795-I1-GC
09/28/2023
Special inspection requirement — Final
NICHOLAS BROWN
09/28/2023
Special inspection requirement — Energy Code Compliance Inspections
NICHOLAS BROWN
09/28/2023
Special inspection requirement — Lighting in dwelling units
NICHOLAS BROWN
09/28/2023
Special inspection requirement — Insulation placement and R values
NICHOLAS BROWN
09/28/2023
Special inspection requirement — Fenestration areas
NICHOLAS BROWN
09/28/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
NICHOLAS BROWN
09/28/2023
Special inspection requirement — Fenestration air leakage
NICHOLAS BROWN
09/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Smerina
09/26/2023
Filed — Alteration
INTERIOR RENOVATION OF CELLAR IN MULTI- FAMILY DWELLING. PLUMBING TO BE FILED SEPERATELY ON DOB NOW. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00749795-P1
09/26/2023
Filed — Alteration
INTERIOR RENOVATION OF CELLAR IN MULTI- FAMILY DWELLING (PLUMBING WORK). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00749817-P1
06/05/2023
Objection raised — Other
05/19/2023
Objection raised — Other
03/23/2023
Violation issued (HPD, closed)
A
01/03/2023
Objection resolved — Addressed
12/23/2022
Objection raised — Other
12/23/2022
Objection resolved — Addressed
12/22/2022
Objection raised — Other
12/21/2022
Filed — Alteration
SOE APPLICATION FILED IN CONJUNCTION WITH STRUCTURAL/FOUNDATION APPLICATION B07994354. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08054510-I1
12/21/2022
Objection resolved — Addressed
12/21/2022
Objection resolved — Addressed
12/13/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/13/2022
Special inspection requirement — Construction Operations Influencing Adjacent Structures
11/29/2022
Objection resolved — Addressed
11/29/2022
Objection resolved — Addressed
11/17/2022
Objection raised — Energy
11/09/2022
Violation issued (HPD, closed)
I
11/02/2022
Objection resolved — Addressed
11/02/2022
Objection resolved — Addressed
11/02/2022
Objection resolved — Addressed
11/02/2022
Objection resolved — Addressed
11/02/2022
Objection resolved — Addressed
09/21/2022
Objection raised — Inspections
09/21/2022
Objection raised — Structural
09/21/2022
Objection raised — Inspections
09/21/2022
Objection raised — Other
09/21/2022
Objection raised — Inspections
09/21/2022
Objection raised — Structural
09/21/2022
Objection raised — Other
09/21/2022
Objection raised — Structural
09/19/2022
Filed — Alteration
PROPOSED REAR LIGHT WELL ADDITION, REINFORCED CONCRETE FOOTING AND RETAINING WALL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B07994354-I1
08/26/2022
Special inspection requirement — Final
08/26/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
08/26/2022
Special inspection requirement — Concrete - Cast-In-Place
08/26/2022
Special inspection requirement — Footing and Foundation
08/26/2022
Special inspection requirement — Subgrade Inspections
08/22/2022
Filed — Alteration
INTERIOR RENOVATION OF CELLAR IN MULTI- FAMILY DWELLING (PLUMBING WORK). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00749817-I1
08/18/2022
Permit issued — General Construction
B00749795-I1-GC
Latest 60 of 72 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREENWOOD PROPERTIES REALTY GROUP LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FORTY SEVENTY-THREE, LLC501/22/2024
LMW ENGINEERING GROUP LLC212/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GIANCOLA CONTRACTORS INCGeneral Contractor307/08/2026
PETER AMABILEElectrical103/21/2026
NEW YORK PARK PLBG&HTG COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AKS ARCHITECTURAL & ENGIN1957501/22/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offNEW YORK PARK PLBG&HTG CO12/07/2023
DOB NOWGeneral ConstructionSigned-offGIANCOLA CONTRACTORS INC11/09/2023
DOB NOWGeneral ConstructionSigned-offGIANCOLA CONTRACTORS INC08/18/2022
BISOTISSUEDVENTURE HOME SOLAR LLC10/16/2019
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/22/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/02/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
01/26/2024Fire-Resistant Penetrations and JointsJoseph Smerinaspecial
01/21/2024Fire-Resistant Penetrations and JointsJoseph Smerinaspecial
09/28/2023FinalNICHOLAS BROWNprogress
09/28/2023Energy Code Compliance InspectionsNICHOLAS BROWNprogress
09/28/2023Lighting in dwelling unitsNICHOLAS BROWNenergy_progress
09/28/2023Insulation placement and R valuesNICHOLAS BROWNenergy_progress
09/28/2023Fenestration areasNICHOLAS BROWNenergy_progress
09/28/2023Fenestration and door U-factor and product ratingsNICHOLAS BROWNenergy_progress
09/28/2023Fenestration air leakageNICHOLAS BROWNenergy_progress
09/28/2023Fire-Resistant Penetrations and JointsJoseph Smerinaspecial
12/13/2022Structural Stability – Alterations of existing buildings—special
12/13/2022Construction Operations Influencing Adjacent Structures—special
08/26/2022Final—progress
08/26/2022Excavations - Sheeting, Shoring, and Bracing—special
08/26/2022Concrete - Cast-In-Place—special
08/26/2022Footing and Foundation—progress
08/26/2022Subgrade Inspections—special
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/29/2026B00749795-I1Request digital key ↗
08/29/2026B00749795-P1Request digital key ↗
08/26/2026B00749817-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
10/11/2019340700520Open ↗
▸BISWORK PERMIT APPLICATION1
10/16/2019340700520Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/29/2026B00749795-I1Open ↗
08/28/2026B08054510-I1Open ↗
08/26/2026B00749817-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
08/23/2026B00749795-I1Open ↗
08/23/2026B00749795-I1Open ↗
08/23/2026B00749795-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00749817-I1Open ↗
08/23/2026B00749795-I1Open ↗
08/22/2026B00749817-P2Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/11/2019340700520Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
10/11/2019340700520Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/29/2026B00749795-I1Open ↗
08/26/2026B00749817-I1Open ↗
08/26/2026B00749817-P2Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/11/2019340700520Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/09/2020340700520Open ↗
10/11/2019340700520Open ↗
10/11/2019340700520Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/09/2020340700520Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
10/11/2019340700520Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
03/09/2020340700520Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00749795-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
03/09/2020340700520Open ↗
03/09/2020340700520Open ↗
10/11/2019340700520Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs2
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
03/09/2020340700520Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/09/2020340700520Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/09/2020340700520Open ↗
10/11/2019340700520Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
10/11/2019340700520Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
10/11/2019340700520Open ↗