← Back
Multi-story retail building (2+)
3823 13 AVENUE
BROOKLYN · BIN 3123343
💬 Discuss this project
1931Year Built
2Stories
K2Building Class
M1-2/R6AZoning
4,800 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Multi-story retail building (2+) · Owner of record: BINETH GROUP HQ LLC · 2,400 sf lot · 2 FAR built · Flood zone X
Locations of Work
Architecture
Floor 19p · 1 filing · 20 docs
Cellar10p · 1 filing · 20 docs
1 job · most recent 10/03/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/03/2025Signed-offMCKENNEY CONSTRUCTION LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin DAIKIN, 5MXS48WVJU9 4 tons · Split System ×2
1 job · most recent 10/03/2025
Sprinkler System
FiledStatusContractorScope
10/03/2025Signed-offDOUG'S PLBG & HTG SERV COSprinkler System
1 job · most recent 10/03/2025
Water/Sanitary
FiledStatusContractorScope
10/03/2025Signed-offPLUMB-IT MECHANICAL INCWater/Sanitary
1 job · most recent 01/08/2025
General Wiring
FiledStatusContractorScope
01/08/2025CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
Building Lifecycle
All (94)Filed (7)Permit Issued (4)Signed Off (3)Violation (2)Inspection (8)Objection (40)Special Inspection (30)
10/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
10/09/2025
Special inspection requirement — Lighting controls
Shahrish Shuvo
10/09/2025
Special inspection requirement — Exterior lighting power
Shahrish Shuvo
10/09/2025
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
10/09/2025
Special inspection requirement — Interior lighting power
Shahrish Shuvo
10/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
10/09/2025
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
10/09/2025
Special inspection requirement — Fenestration areas
Shahrish Shuvo
10/09/2025
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
10/09/2025
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
10/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
10/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
10/03/2025
Filed — Alteration CO
Convert cellar and 1st floor to a daycare. NO change in bulk. Tenant buildout with layout of daycare rooms.
B00989685-P4
10/03/2025
Special inspection requirement — Fenestration areas
Shahrish Shuvo
10/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
10/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
10/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
10/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
10/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
10/03/2025
Special inspection requirement — Exterior lighting power
Shahrish Shuvo
10/03/2025
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
10/03/2025
Special inspection requirement — Lighting controls
Shahrish Shuvo
10/03/2025
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
10/03/2025
Special inspection requirement — Interior lighting power
Shahrish Shuvo
10/03/2025
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
09/01/2025
Objection resolved — Addressed
08/07/2025
Objection raised — Fire_Protection
07/30/2025
Filed — Alteration CO
Convert cellar and 1st floor to a daycare. NO change in bulk. Tenant buildout with layout of daycare rooms.
B00989685-P3
05/01/2025
Signed off — Alteration CO
Convert cellar and 1st floor to a daycare. NO change in bulk. Tenant buildout with layout of daycare rooms.
B00989685-S5
04/23/2025
Signed off — Alteration CO
Convert cellar and 1st floor to a daycare. NO change in bulk. Tenant buildout with layout of daycare rooms.
B00989685-S2
04/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/27/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/25/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/22/2025
Signed off — Alteration CO
Convert cellar and 1st floor to a daycare. NO change in bulk. Tenant buildout with layout of daycare rooms.
B00989685-S1
03/21/2025
Permit issued — Mechanical Systems
B00989685-S5-MS
03/11/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
03/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/04/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/11/2025
Objection resolved — Addressed
02/11/2025
Objection resolved — Addressed
02/11/2025
Objection resolved — Addressed
02/11/2025
Objection resolved — Addressed
02/07/2025
Objection raised — Other
02/07/2025
Objection raised — Other
02/07/2025
Objection raised — Other
02/07/2025
Objection raised — Other
02/04/2025
Permit issued — Sprinklers
B00989685-S2-EW-SP
02/04/2025
Objection resolved — Addressed
01/23/2025
Objection raised — Other
01/21/2025
Filed — Alteration CO
Convert cellar and 1st floor to a daycare. NO change in bulk. Tenant buildout with layout of daycare rooms.
B00989685-P1
01/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
01/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
01/21/2025
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
01/21/2025
Special inspection requirement — Fenestration areas
Shahrish Shuvo
01/21/2025
Special inspection requirement — Exterior lighting power
Shahrish Shuvo
01/21/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
01/20/2025
Filed — Alteration CO
Convert cellar and 1st floor to a daycare. NO change in bulk. Tenant buildout with layout of daycare rooms.
B00989685-S5
12/02/2024
Permit issued — General Construction
B00989685-I1-GC
11/29/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/10/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 94 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
I & S KALLUS INC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/18/2022$1.3M—Private party → BINETH GROUP HQ LLC$271/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GEE2000 ARCHITECT P.C.610/03/2025
CHOSEN MEP, CORP.104/16/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMG GROUP USA303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MCKENNEY CONSTRUCTION LLCGeneral Contractor207/08/2026
DOUG'S PLBG & HTG SERV COFire Protection107/08/2026
PLUMB-IT MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524510/03/2025
GEE2000 ARCHITECT P.C.691101/20/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMCKENNEY CONSTRUCTION LLC03/21/2025
DOB NOWSprinklersSigned-offDOUG'S PLBG & HTG SERV CO02/04/2025
DOB NOWGeneral ConstructionPermit IssuedMCKENNEY CONSTRUCTION LLC12/02/2024
DOB NOWPlumbingSigned-offJVR PLBG AND HEATING INC10/03/2024
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/27/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/25/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/11/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/04/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/10/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
10/09/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
10/09/2025Lighting controlsShahrish Shuvoenergy_progress
10/09/2025Exterior lighting powerShahrish Shuvoenergy_progress
10/09/2025Insulation placement and R valuesShahrish Shuvoenergy_progress
10/09/2025Interior lighting powerShahrish Shuvoenergy_progress
10/09/2025Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
10/09/2025Fenestration air leakageShahrish Shuvoenergy_progress
10/09/2025Fenestration areasShahrish Shuvoenergy_progress
10/09/2025Air barrier - visual inspectionShahrish Shuvoenergy_progress
10/09/2025Fire-Resistance Rated ConstructionShahrish Shuvoprogress
10/09/2025Energy Code Compliance InspectionsShahrish Shuvoprogress
10/09/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
10/03/2025Fenestration areasShahrish Shuvoenergy_progress
10/03/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
10/03/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
10/03/2025Energy Code Compliance InspectionsShahrish Shuvoprogress
10/03/2025Fire-Resistance Rated ConstructionShahrish Shuvoprogress
10/03/2025Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
10/03/2025Exterior lighting powerShahrish Shuvoenergy_progress
10/03/2025Fenestration air leakageShahrish Shuvoenergy_progress
10/03/2025Lighting controlsShahrish Shuvoenergy_progress
10/03/2025Air barrier - visual inspectionShahrish Shuvoenergy_progress
10/03/2025Interior lighting powerShahrish Shuvoenergy_progress
10/03/2025Insulation placement and R valuesShahrish Shuvoenergy_progress
01/21/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
Latest 25 of 37.
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026B00989685-S1Request digital key ↗
08/23/2026B00989685-S2Request digital key ↗
08/23/2026B00989685-P4Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
09/29/2025340911286Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00989685-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/13/2026B00989685-P3Open ↗
08/13/2026B00989685-I1Open ↗
08/13/2026B00989685-S5Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/27/2026B00989685-I1Open ↗
08/27/2026B00989685-I1Open ↗
08/25/2026B00989685-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026B00989685-S2Open ↗
08/27/2026B00989685-I1Open ↗
08/25/2026B00989685-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/13/2026B00989685-S2Open ↗
08/13/2026B00989685-P4Open ↗
08/13/2026B00989685-P1Open ↗
Showing 3 of 7 on file for this type
▸Other Documents4
▸DOB NOWProperty Ownership Certification4
08/13/2026B00989685-P1Open ↗
08/13/2026B00989685-I1Open ↗
08/13/2026B00989685-P3Open ↗
Showing 3 of 4 on file for this type