← Back
Three families
145 TEHAMA STREET
BROOKLYN · BIN 3123715
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R5Zoning
2,720 sfGross Floor Area
3Units
Rent Stabilized14 Open Violations 13 unresolved · 1 paperwork only ▸
Three families · 2,500 sf lot · 1.09 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction1p · 1 filing · 6 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FACTORY ENGINEERING WORKS PLLC204/27/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YUNG WAY CONSTRUCTION INC.General Contractor106/27/2026
CROSSFIELD PLBG.&HTGPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FACTORY ENGINEERING WORKS8855204/27/2026
Building Lifecycle
All (27)Filed (2)Permit Issued (2)Violation (19)Objection (4)
06/25/2026
Permit issued — Plumbing
B01389773-S1-PL
06/24/2026
Permit issued — General Construction
B01389773-I1-GC
06/16/2026
Objection resolved — Addressed
05/27/2026
Objection resolved — Addressed
05/11/2026
Objection raised — Cost
05/11/2026
Objection raised — Scope
05/06/2026
Violation issued (HPD, open)
A
04/27/2026
Filed — Alteration
Replace (2) shower, (2) water closet and (2) lavatory; Relocate (1) sink at 2nd floor. No change in use occupancy or egress.
B01389773-S1
04/27/2026
Filed — Alteration
Replace (2) shower, (2) water closet and (2) lavatory; Relocate (1) sink at 2nd floor. No change in use occupancy or egress.
B01389773-I1
11/19/2025
Violation issued (HPD, open)
I
06/11/2025
Violation issued (HPD, open)
A
11/27/2024
Violation issued (HPD, open)
I
04/12/2024
Violation issued (HPD, open)
A
11/20/2023
Violation issued (HPD, open)
I
03/27/2023
Violation issued (HPD, open)
A
11/09/2022
Violation issued (HPD, open)
I
03/02/2022
Violation issued (HPD, open)
A
03/02/2022
Violation issued (HPD, open)
I
04/13/2021
Violation issued (HPD, open)
I
04/13/2021
Violation issued (HPD, open)
A
10/22/2018
Violation issued (HPD, closed)
I
11/29/2017
Violation issued (HPD, closed)
I
11/15/2016
Violation issued (HPD, closed)
I
10/14/2015
Violation issued (HPD, closed)
I
10/03/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/03/2001
Violation issued (ECB, open)
Quality of Life
01/20/1982
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCROSSFIELD PLBG.&HTG06/25/2026
DOB NOWGeneral ConstructionPermit IssuedYUNG WAY CONSTRUCTION INC.06/24/2026
1 project · most recent 04/27/2026
Water/Sanitary
FiledStatusContractorScope
04/27/2026Permit IssuedCROSSFIELD PLBG.&HTGWater/Sanitary
Nothing on file for this building.
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/17/2026B01389773-S1Request digital key ↗
08/15/2026B01389773-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/17/2026B01389773-S1Open ↗
08/17/2026B01389773-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/17/2026B01389773-S1Open ↗
08/15/2026B01389773-I1Open ↗