← Back
Elevator cooperative
160 OCEAN PARKWAY
BROOKLYN · BIN 3124304
💬 Discuss this project
1956Year Built
6Stories
D4Building Class
R7AZoning
58,200 sfGross Floor Area
55Units
LL97 CoveredRent Stabilized13 Open Violations 12 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 160 OCEAN OWNERS CORP · 15,000 sf lot · 3.88 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Roof7p · 1 filing · 5 docs
CellarUnder Construction2p · 1 filing · 15 docs
2 jobs · most recent 08/05/2024
General Wiring
FiledStatusContractorScope
08/05/2024CompleteNASH ELECTRIC SERVICES IN—
07/28/2024Permit IssuedALLTECH ELECL CONTNG CORPGeneral Wiring
Building Lifecycle
All (94)Filed (5)Permit Issued (4)Signed Off (2)Facade (FISP) (24)Violation (36)Inspection (5)Objection (2)Special Inspection (16)
05/08/2026
Cycle 10 facade report submitted
05/07/2026
Cycle 10 facade report signed — SAFE
04/14/2026
Cycle 10 facade inspection completed
03/11/2026
Objection resolved — Resolved
02/26/2026
Signed off — Alteration
INTERIOR RENOVATION ( RELOCATING OF THEEXISTING BED ROOM DOOR AND THE TOILETDOOR ). THERE WILL BE NO CHANGED IN THEUSE, EGRESS OR OCCUPANCY UNDER THISAPPLICATION.
B01315159-I1
02/04/2026
Objection raised — Admin
02/02/2026
Filed — Alteration
B01094933-P1
02/02/2026
Special inspection requirement — Final
AHMAD KHANZADA
02/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
AHMAD KHANZADA
02/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
AHMAD KHANZADA
02/02/2026
Special inspection requirement — Structural Steel - Details
AHMAD KHANZADA
02/02/2026
Special inspection requirement — Masonry
AHMAD KHANZADA
01/29/2026
Permit issued — General Construction
B01094933-I1-GC
11/18/2025
Permit issued — General Construction
B01315159-I1-GC
11/11/2025
Filed — Alteration
INTERIOR RENOVATION ( RELOCATING OF THEEXISTING BED ROOM DOOR AND THE TOILETDOOR ). THERE WILL BE NO CHANGED IN THEUSE, EGRESS OR OCCUPANCY UNDER THISAPPLICATION.
B01315159-I1
11/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
MAHFUZAR RAHMAN
11/06/2025
Special inspection requirement — Final
MAHFUZAR RAHMAN
08/22/2025
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01090434-I1
03/06/2025
Cycle 9 facade report submitted
03/06/2025
Cycle 9 facade report signed — SAFE
02/14/2025
Cycle 9 facade inspection completed
02/14/2025
Cycle 9 facade report submitted
02/14/2025
Cycle 9 facade report signed — UNSAFE
02/11/2025
Cycle 9 facade inspection completed
11/21/2024
Filed — Alteration
B01094933-I1
10/03/2024
Permit issued — General Construction
B01054859-I1-GC
10/02/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/19/2024
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
08/12/2024
Special inspection requirement — Final
AHMAD KHANZADA
08/12/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
AHMAD KHANZADA
08/12/2024
Special inspection requirement — Masonry
AHMAD KHANZADA
08/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
AHMAD KHANZADA
08/12/2024
Special inspection requirement — Structural Steel - Details
AHMAD KHANZADA
08/07/2024
Permit issued — Sidewalk Shed
B01090434-I1-SH
08/06/2024
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01090434-I1
08/02/2024
Filed — Alteration
Filing for masonry facade repairs, as per plans filed herewith. No change in use, egress, or occupancy.
B01054859-I1
05/21/2024
Special inspection requirement — Energy Code Compliance Inspections
05/21/2024
Special inspection requirement — Final
EDWARD MADOCKS
05/21/2024
Special inspection requirement — Tenant Protection Plan Compliance
EDWARD MADOCKS
05/21/2024
Special inspection requirement — Masonry
EDWARD MADOCKS
01/29/2024
Cycle 9 facade report submitted
01/26/2024
Cycle 9 facade report signed — UNSAFE
01/24/2024
Cycle 9 facade inspection completed
01/16/2024
Violation issued (ECB, open)
Local Law
11/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/03/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/03/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/26/2023
Cycle 9 facade report submitted
05/26/2023
Cycle 9 facade inspection completed
05/26/2023
Cycle 9 facade report signed — UNSAFE
05/11/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/16/2023
Violation issued (ECB, closed)
Construction
02/22/2023
Cycle 9 facade report signed — UNSAFE
02/21/2023
Cycle 9 facade report submitted
02/21/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/15/2023
Cycle 9 facade inspection completed
03/08/2022
Violation issued (HPD, closed)
A
03/08/2022
Violation issued (HPD, closed)
I
04/16/2021
Violation issued (HPD, closed)
A
04/16/2021
Violation issued (HPD, closed)
I
Latest 60 of 94 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MALIK GENERAL CONSTRUCTION CORPORAT307/08/2026
NARROWS MANAGEMENT OF BAY RIDGE1404/09/2026
160 OCEAN OWNERS CORP503/22/2026
160 OCEAN PKWY CORP103/22/2026
ADVANCED MGMT. SERVICE103/22/2026
J. HUS MORAVIAN CHURCH103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SAGHARI ARCHITECTURAL SERVICES, PC202/02/2026
AK CONSULTING SERVICES, INC111/11/2025
ASHRAF CORP108/06/2024
EDWARD MADOCKS, ARCHITECT108/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AK CONSULTING SERVICES203/21/2026
KD DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SHINE CONSTRUCTION & DEVGeneral Contractor404/09/2026
ARSENAL SCAFFOLD INCGeneral Contractor203/21/2026
MALIK GENERAL CONSTR CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMKA & ASSOCIATES LLC8239202/02/2026
AK CONSULTING SERVICES, I6198111/11/2025
MADOCKS ARCHITECTURE, PC9127108/02/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSHINE CONSTRUCTION & DEV01/29/2026
DOB NOWGeneral ConstructionSigned-offMALIK GENERAL CONSTR CORP11/18/2025
DOB NOWGeneral ConstructionPermit IssuedSHINE CONSTRUCTION & DEV10/03/2024
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC08/07/2024
BISFSISSUEDSTAR INDUSTRIAL SERVICE CO INC01/15/1998
BISPLISSUEDJOSEPH FERRIGNO PLUMBING & HEATI01/15/1998
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/02/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/19/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
07/03/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/11/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
02/02/2026FinalAHMAD KHANZADAprogress
02/02/2026Tenant Protection Plan ComplianceAHMAD KHANZADAspecial
02/02/2026Structural Stability – Alterations of existing buildingsAHMAD KHANZADAspecial
02/02/2026Structural Steel - DetailsAHMAD KHANZADAspecial
02/02/2026MasonryAHMAD KHANZADAspecial
11/10/2025Tenant Protection Plan ComplianceMAHFUZAR RAHMANspecial
11/06/2025FinalMAHFUZAR RAHMANprogress
08/12/2024FinalAHMAD KHANZADAprogress
08/12/2024Structural Stability – Alterations of existing buildingsAHMAD KHANZADAspecial
08/12/2024MasonryAHMAD KHANZADAspecial
08/12/2024Tenant Protection Plan ComplianceAHMAD KHANZADAspecial
08/12/2024Structural Steel - DetailsAHMAD KHANZADAspecial
05/21/2024Energy Code Compliance Inspections—progress
05/21/2024FinalEDWARD MADOCKSprogress
05/21/2024Tenant Protection Plan ComplianceEDWARD MADOCKSspecial
05/21/2024MasonryEDWARD MADOCKSspecial
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026B01054859-I1Request digital key ↗
08/24/2026B01090434-I1Request digital key ↗
08/19/2026B01315159-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026B01094933-I1Open ↗
09/23/2026B01094933-I1Open ↗
09/23/2026B01094933-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/18/2026B01094933-P1Open ↗
08/18/2026B01094933-I1Open ↗
08/13/2026B01054859-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026B01094933-I1Open ↗
09/01/2026B01094933-P1Open ↗
08/31/2026B01315159-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B01054859-I1Open ↗