← Back
Two stories - detached, small or mid-size
140 EAST 8 STREET
BROOKLYN · BIN 3124369
💬 Discuss this project
1910Year Built
2.5Stories
A1Building Class
R5Zoning
1,368 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,000 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADEL SAGEER ARCHITECT, PLLC206/16/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERIPRO INTERIORS INCGeneral Contractor207/29/2026
Building Lifecycle
All (21)Filed (2)Permit Issued (2)Signed Off (1)Violation (2)Objection (12)Special Inspection (2)
07/28/2026
Permit issued — General Construction
B01417122-I1-GC
06/16/2026
Filed — Alteration
INSTALLATION OF NEW METAL CANOPY IN REAR YARD
B01417122-I1
06/15/2026
Special inspection requirement — Final
ADEL SAGEER
10/24/2025
Signed off — Alteration
REMOVE EXISTING NON-PERMITTED WOOD CANOPY IN REAR YARD. THIS JOB IS FILED TO REMEDY NYC DOB VIOLATIONV-042525C25-00793 AND OATH/ECB VIOLATION39147586X. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01252094-I1
10/21/2025
Permit issued — General Construction
B01252094-I1-GC
08/04/2025
Objection resolved — Addressed
08/04/2025
Objection resolved — Addressed
08/04/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/23/2025
Objection resolved — Addressed
07/21/2025
Objection raised — Scope
07/21/2025
Objection raised — Scope
07/21/2025
Objection raised — Scope
07/21/2025
Objection raised — Scope
07/21/2025
Objection raised — Cost
07/21/2025
Objection raised — Scope
07/08/2025
Filed — Alteration
REMOVE EXISTING NON-PERMITTED WOOD CANOPY IN REAR YARD. THIS JOB IS FILED TO REMEDY NYC DOB VIOLATIONV-042525C25-00793 AND OATH/ECB VIOLATION39147586X. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01252094-I1
07/07/2025
Special inspection requirement — Final
ADEL SAGEER
05/09/2025
Violation issued (ECB, closed)
Construction
04/25/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAMERIPRO INTERIORS INC07/28/2026
DOB NOWGeneral ConstructionSigned-offAMERIPRO INTERIORS INC10/21/2025
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
06/15/2026FinalADEL SAGEERprogress
07/07/2025FinalADEL SAGEERprogress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026B01252094-I1Request digital key ↗
08/16/2026B01417122-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026B01252094-I1Open ↗
08/16/2026B01417122-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/29/2026B01417122-I1Open ↗
08/28/2026B01252094-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026B01252094-I1Open ↗