← Back
Primarily 2 family with 1 store or office
97 CHURCH AVENUE
BROOKLYN · BIN 3124484
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R5Zoning
3,135 sfGross Floor Area
3Units
Rent Stabilized13 Open Violations 9 unresolved · 4 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 97-99 CHURCH AVENUE REALTY · 1,985 sf lot · 1.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1 filing · 9 docs
Floor 1Under Construction11p · 3 filings · 20 docs
CellarUnder Construction7p · 2 filings · 20 docs
1 job · most recent 04/07/2023
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/07/2023Signed-offXH&RC PLUMBING HEATINGVentilation Systems
Ventilation
N/A n/a 197 CFM · Kitchen Exhaust ×2
1 job · most recent 07/18/2025
Gas Water/Sanitary
FiledStatusContractorScope
07/18/2025Permit IssuedXH&RC PLBG AND HTG INCGas, Water/Sanitary
2 jobs · most recent 09/15/2026
General Wiring
FiledStatusContractorScope
09/15/2026Permit IssuedWCK ELECTRIC CORP.General Wiring
11/06/2018CompleteRICHARD NEU—
Building Lifecycle
All (52)Filed (6)Permit Issued (4)Signed Off (1)Violation (22)Inspection (2)Objection (8)Special Inspection (9)
09/17/2026
Permit issued — General Construction
B01450148-I1-GC-CX
09/29/2025
Objection resolved — Addressed
08/12/2025
Objection resolved — Addressed
08/07/2025
Objection resolved — Addressed
08/07/2025
Objection resolved — Addressed
08/04/2025
Objection raised — Cost
08/04/2025
Objection raised — Scope
08/04/2025
Objection raised — Fire_Protection
08/04/2025
Objection raised — Inspections
07/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAZAL BANGASH
07/18/2025
Filed — Alteration
APPLICATION FILE TO REPLACE EXIST. COOKING EQUIPMENTS AND PLUMBING FIXTURES IN EXIST. EATING & DRINKING ESTABLISHMENT AS PER PLAN AT CELLAR AND 1ST FLOOR. REMOVE VIOLATION# 35646748K. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00833731-P2
07/18/2025
Filed — Alteration
APPLICATION FILE TO REPLACE EXIST. COOKING EQUIPMENTS AND PLUMBING FIXTURES IN EXIST. EATING & DRINKING ESTABLISHMENT AS PER PLAN AT CELLAR AND 1ST FLOOR. REMOVE VIOLATION# 35646748K. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00833731-S1
07/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mumtaz Hussain
07/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mumtaz Hussain
07/13/2025
Special inspection requirement — Final
Mumtaz Hussain
07/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAZAL BANGASH
05/24/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/24/2025
Violation issued (ECB, closed)
Construction
09/25/2024
Violation issued (FDNY_ORDER, closed)
09/25/2024
Violation issued (FDNY_ORDER, closed)
12/20/2023
Violation issued (ECB, open)
Construction
12/05/2023
Violation issued (ECB, closed)
Construction
11/09/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/19/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/13/2023
Filed — Alteration
APPLICATION FILE TO REPLACE EXIST. COOKING EQUIPMENTS AND PLUMBING FIXTURES IN EXIST. EATING & DRINKING ESTABLISHMENT AS PER PLAN AT CELLAR AND 1ST FLOOR. REMOVE VIOLATION# 35646748K. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00833731-P1
05/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAZAL BANGASH
05/23/2023
Permit issued — Mechanical Systems
B00850039-I1-MS
05/23/2023
Permit issued — Plumbing
B00833731-I1-PL
04/07/2023
Filed — Alteration
APPLICATION FILE TO REPLACE EXIST. COOKING EQUIPMENTS AND PLUMBING FIXTURES IN EXIST. EATING & DRINKING ESTABLISHMENT AS PER PLAN AT CELLAR AND 1ST FLOOR. REMOVE VIOLATION# 35646748K. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00833731-I1
04/07/2023
Filed — Alteration
APPLICATION FILE TO INSTALL KITHEN HOOD & MECHANICAL EXHAUST SYSTEM AT 1st FLOOR. MODIFY EXIST. KITCHEN HOOD AT CELLAR FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00850039-I1
03/25/2023
Special inspection requirement — Final
FAZAL BANGASH
03/25/2023
Special inspection requirement — Tenant Protection Plan Compliance
FAZAL BANGASH
03/25/2023
Special inspection requirement — Mechanical Systems
FAZAL BANGASH
06/12/2019
Signed off — Alteration
B00095011-I1
03/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/09/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/08/2019
Violation issued (ECB, closed)
Construction
11/28/2018
Violation issued (ECB, open)
Construction
11/28/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/07/2018
Permit issued — Sidewalk Shed
B00095011-I1-SH
11/05/2018
Filed — Alteration
B00095011-I1
10/16/2018
Violation issued (ECB, open)
Construction
08/27/2018
Violation issued (ECB, closed)
Construction
01/18/2006
Violation issued (HPD, open)
A
01/18/2006
Violation issued (HPD, open)
A
01/18/2006
Violation issued (HPD, open)
B
01/18/2006
Violation issued (HPD, open)
B
01/18/2006
Violation issued (HPD, open)
B
02/03/2004
Violation issued (HPD, open)
A
02/03/2004
Violation issued (HPD, open)
B
02/03/2004
Violation issued (HPD, open)
B
05/27/2003
Violation issued (ECB, open)
Construction
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHURCH AVE HALAL DELI GRILL109/18/2026
JASCO407/08/2026
97-99 CHURCH AVE REALTY603/22/2026
97-99 CHURCH AVENUE103/22/2026
A&Y CO103/22/2026
TAJ MAHAL CONTRACTING COR103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BANGASH ASSOCIATES INC.407/18/2025
MUMTAZ ENTERPRISES107/18/2025
ASHRAF CORP111/05/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
SHEIKH EXPEDITING1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUNAY, CLEVERElectrical103/21/2026
LIOTINE, VITOElectrical103/21/2026
IIEMAR LLCGeneral Contractor109/18/2026
JASCO, INCGeneral Contractor107/08/2026
XH&RC PLUMBING HEATINGGeneral Contractor107/08/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BANGASH ASSOCIATES INC8488407/18/2025
MUMTAZ ENTERPRISES9459107/18/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedIIEMAR LLC09/17/2026
DOB NOWMechanical SystemsSigned-offXH&RC PLUMBING HEATING05/23/2023
DOB NOWPlumbingPermit IssuedXH&RC PLBG AND HTG INC05/23/2023
DOB NOWSidewalk ShedSigned-offJASCO, INC11/07/2018
BISFPISSUEDMEGA FIRE PROTECTION INC07/11/2002
BISFPISSUEDLUND FIRE PRODUCTS CO INC12/28/1995
BISPLISSUEDSUNSET PLUMB & FIRE PROTECTION09/19/1995
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/09/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
07/21/2025Fire-Resistant Penetrations and JointsFAZAL BANGASHspecial
07/13/2025Structural Stability – Alterations of existing buildingsMumtaz Hussainspecial
07/13/2025Fire-Resistant Penetrations and JointsMumtaz Hussainspecial
07/13/2025FinalMumtaz Hussainprogress
07/09/2025Fire-Resistant Penetrations and JointsFAZAL BANGASHspecial
05/28/2023Fire-Resistant Penetrations and JointsFAZAL BANGASHspecial
03/25/2023FinalFAZAL BANGASHprogress
03/25/2023Tenant Protection Plan ComplianceFAZAL BANGASHspecial
03/25/2023Mechanical SystemsFAZAL BANGASHspecial
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/02/2026B00095011-I1Request digital key ↗
08/27/2026B00850039-I1Request digital key ↗
08/21/2026B00833731-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
10/26/2018321071861Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/02/2026B00095011-I1Open ↗
08/21/2026B00833731-S1Open ↗
08/21/2026B00833731-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/18/2026B00833731-I1Open ↗
09/01/2026B00850039-I1Open ↗
08/28/2026B00833731-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/26/2018321071861Open ↗
10/26/2018321071861Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B00850039-I1Open ↗
08/25/2026B00833731-S1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/26/2018321071861Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
04/05/2019321071861Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
10/26/2018321071861Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/21/2026B00833731-S1Open ↗
08/21/2026B00833731-P2Open ↗
08/21/2026B00833731-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
10/26/2018321071861Open ↗
▸Energy Compliance2
▸BISAS-BUILT ENERGY ANALYSIS1
04/05/2019321071861Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/26/2018321071861Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/05/2019321071861Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
04/05/2019321071861Open ↗
10/26/2018321071861Open ↗
▸Filing & Intake Forms3
▸BISBOROUGH INTAKE FORM2
04/17/2019321071861Open ↗
04/05/2019321071861Open ↗
▸BISEFILING COVER SHEET1
10/25/2018321071861Open ↗