← Back
Elevator cooperative
415 BEVERLEY ROAD
BROOKLYN · BIN 3124671
💬 Discuss this project
1963Year Built
6Stories
D4Building Class
R5Zoning
110,000 sfGross Floor Area
130Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: 415 BEVERLY ROAD APTS OWNERS INC · 28,000 sf lot · 3.93 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Roof4p · 1 filing · 3 docs
Floor 12p · 1 filing · 4 docs
CellarUnder Construction2p · 1 filing · 5 docs
5 jobs · most recent 03/20/2025
General Wiring
FiledStatusContractorScope
03/20/2025CompleteKENNETH FISK ELECTRIC COR—
06/28/2023CompleteBLAZE ELECTRIC INC.General Wiring
07/09/2021CompleteANTONIO CERIELLO ELEC INCGeneral Wiring
07/21/2020CompletePETER J. CATANZARO, INC.General Wiring
05/30/2018Permit IssuedRICHARD NEU—
Building Lifecycle
All (96)Filed (6)Permit Issued (6)Signed Off (4)Facade (FISP) (13)Violation (60)Inspection (1)Special Inspection (6)
06/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/24/2026
Permit issued — Boiler Equipment
B01385947-I1-BE
04/16/2026
Filed — Alteration
B01385947-I1
04/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
04/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
Gregory Perotto
03/27/2025
Signed off — Alteration
FACADE REPAIR AS PER PLAN.
B01027008-I1
12/10/2024
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01020532-I1
11/16/2024
Signed off — Alteration
B01034981-I1
04/26/2024
Permit issued — Suspended Scaffold
B01034981-I1-SC
04/12/2024
Filed — Alteration
B01034981-I1
04/08/2024
Permit issued — General Construction
B01027008-I1-GC
03/28/2024
Filed — Alteration
FACADE REPAIR AS PER PLAN.
B01027008-I1
03/28/2024
Special inspection requirement — Masonry
NORMAN LOK
03/28/2024
Special inspection requirement — Tenant Protection Plan Compliance
NORMAN LOK
03/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NORMAN LOK
03/28/2024
Special inspection requirement — Final
Eric Foster
03/19/2024
Permit issued — Sidewalk Shed
B01020532-I1-SH
03/18/2024
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01020532-I1
07/05/2022
Cycle 9 facade report signed — SWARMP
04/05/2022
Cycle 9 facade report submitted
03/08/2022
Cycle 9 facade inspection completed
02/23/2022
Violation issued (HPD, closed)
A
11/12/2021
Violation issued (HPD, closed)
C
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/28/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/28/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/21/2020
Signed off — Alteration
B00331863-I1
10/05/2020
Violation issued (HPD, closed)
C
08/27/2020
Violation issued (HPD, closed)
C
08/27/2020
Violation issued (HPD, closed)
B
08/27/2020
Violation issued (HPD, closed)
B
08/27/2020
Violation issued (HPD, closed)
C
08/27/2020
Violation issued (HPD, closed)
B
08/27/2020
Violation issued (HPD, closed)
B
08/25/2020
Violation issued (HPD, closed)
B
08/25/2020
Violation issued (HPD, closed)
B
08/25/2020
Violation issued (HPD, closed)
B
08/25/2020
Violation issued (HPD, closed)
B
08/25/2020
Violation issued (HPD, closed)
C
08/25/2020
Violation issued (HPD, closed)
B
08/25/2020
Violation issued (HPD, closed)
B
08/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/29/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/29/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/19/2020
Permit issued — Plumbing
B00331863-I1-PL
05/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/17/2020
Filed — Alteration
B00331863-I1
04/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/31/2018
Permit issued — Sidewalk Shed
B00048795-I1-SH
05/30/2018
Filed — Alteration
B00048795-I1
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/08/2017
Violation issued (HPD, closed)
A
09/08/2017
Violation issued (HPD, closed)
B
09/08/2017
Violation issued (HPD, closed)
A
09/08/2017
Violation issued (HPD, closed)
C
09/08/2017
Violation issued (HPD, closed)
A
09/08/2017
Violation issued (HPD, closed)
A
09/08/2017
Violation issued (HPD, closed)
A
03/27/2017
Cycle 8 facade report submitted
Latest 60 of 96 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1-D N CONSTRUCTION 2-P K CONTRACTIN407/08/2026
U S STAR CONSTRUCTION NY CORP407/08/2026
ALL STATE REALTY ASSOC706/27/2026
JASCO, INC503/22/2026
KAJ NY CONSTRUCTION INC503/22/2026
415 BEVERLEY ROAD APTS803/22/2026
JOSEPH SPITZER C/O 415 BE103/22/2026
415 BEVERLY RD APT OWNERS103/22/2026
415 BEVERLY ROAD APT103/22/2026
ALLSTATE REALTY/ASSOCI103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREGORY V. PEROTTO, P.E.104/16/2026
ASHRAF CORP103/28/2024
ASR ENGINEERING PC103/18/2024
M JUST ARCHITECTURE PC103/17/2020
GREEN DESIGN105/30/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JUST ARCHITECTURE203/21/2026
AK CONSULTING SERVICES203/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
NETDT203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JASCO, INCGeneral Contractor303/21/2026
KAJ NY CONSTRUCTION INCGeneral Contractor303/21/2026
KENNETH FISK ELECTRIC CORElectrical103/22/2026
ANTONIO CERIELLO ELEC INCElectrical103/22/2026
BIG APPLE SEWER & DRAIN IPlumbing107/08/2026
U S STAR CONSTRUCTION NYGeneral Contractor107/08/2026
BLAZE ELECTRIC INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREGORY V. PEROTTO, P.E.947104/16/2026
NORMAN C. LOK818103/28/2024
ASE ENGINEERING PLLC5785103/17/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedAPPROVED OIL CO. OF BROOK04/24/2026
DOB NOWSuspended ScaffoldSigned-offD&N CONST & CONSULTNG INC04/26/2024
DOB NOWGeneral ConstructionSigned-offU S STAR CONSTRUCTION NY04/08/2024
DOB NOWSidewalk ShedSigned-offJASCO, INC03/19/2024
DOB NOWPlumbingSigned-offBIG APPLE SEWER & DRAIN I06/19/2020
DOB NOWSidewalk ShedPermit IssuedKAJ NY CONSTRUCTION INC05/31/2018
BISOTISSUEDCAPEZZANO CONSTRUCTION08/21/2020
BISOTISSUEDALGO CONSTRUCTION CORP08/25/1998
BISPLISSUEDJ JEKOWSKY & SON INC07/11/1991
BISFSISSUEDA&A HEATING CORP.07/11/1991
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/18/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
04/11/2026Fire-Resistant Penetrations and JointsGregory Perottospecial
04/11/2026Tenant Protection Plan ComplianceGregory Perottospecial
03/28/2024MasonryNORMAN LOKspecial
03/28/2024Tenant Protection Plan ComplianceNORMAN LOKspecial
03/28/2024Structural Stability – Alterations of existing buildingsNORMAN LOKspecial
03/28/2024FinalEric Fosterprogress
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
09/03/2026B00048795-I1Request digital key ↗
08/25/2026B01020532-I1Request digital key ↗
08/25/2026B01027008-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00331863-I1Request digital key ↗
▸Applications & Permits2
▸BISWORK PERMIT APPLICATION1
08/21/2020322047334Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
03/21/2020322047334Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/03/2026B00048795-I1Open ↗
09/02/2026B00331863-I1Open ↗
08/25/2026B01020532-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B01027008-I1Open ↗
08/28/2026B01385947-I1Open ↗
08/28/2026B01385947-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/21/2020322047334Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/02/2026B01027008-I1Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
07/18/2020322047334Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026B00331863-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/02/2026B00331863-I1Open ↗
08/25/2026B01027008-I1Open ↗
08/17/2026B01385947-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/18/2020322047334Open ↗
03/21/2020322047334Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
09/22/2020322047334Open ↗
08/21/2020322047334Open ↗
07/18/2020322047334Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/22/2020322047334Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/21/2020322047334Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/22/2020322047334Open ↗
08/21/2020322047334Open ↗
07/18/2020322047334Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/19/2020322047334Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
09/22/2020322047334Open ↗
03/21/2020322047334Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET1
03/21/2020322047334Open ↗
▸BISBOROUGH INTAKE FORM1
03/21/2020322047334Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026B01034981-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01034981-I1Open ↗