← Back
Four families
1813 60 STREET
BROOKLYN · BIN 3131867
💬 Discuss this project
1931Year Built
2Stories
C3Building Class
R5Zoning
2,800 sfGross Floor Area
4Units
Rent Stabilized17 Open Violations 16 unresolved · 1 paperwork only ▸FDNY Report ↗
Four families · Owner of record: 1813-60 BINYAN LLC · 2,003 sf lot · 1.4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction15p · 1 filing · 20 docs
Floor 3Under Construction17p · 1 filing · 20 docs
Floor 2Under Construction14p · 1 filing · 20 docs
Floor 1Under Construction13p · 1 filing · 20 docs
CellarUnder Construction18p · 1 filing · 20 docs
1 job · most recent 03/19/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/19/2026Permit IssuedJ&R CONSTRUCTION SERVICESAir Conditioning Systems
Cooling
Mitsubishi Electric MXZ-SM60NAM, SUZ-KA24NAHZ 60,000 BTU · Heat Pump Outdoor ×4
PEFY-P54NMHU-E2 13,600 BTU · Vrf Indoor ×1
1 job · most recent 03/19/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/19/2026Signed-offA M B MECHANICAL INCStorm, Water/Sanitary
1 job · most recent 12/09/2024
General Wiring
FiledStatusContractorScope
12/09/2024Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
1 job · most recent 03/19/2026
Masonry
FiledStatusContractorScope
03/19/2026Permit IssuedJ&R CONSTRUCTION SERVICESMasonry
Building Lifecycle
All (167)Filed (8)Permit Issued (8)Signed Off (5)Violation (22)Inspection (15)Objection (79)Special Inspection (30)
08/11/2026
Objection resolved — Addressed
08/10/2026
Objection raised — Accessibility
07/06/2026
Objection raised — Scope
06/04/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/19/2026
Permit issued — General Construction
B01075378-I1-GC
05/12/2026
Violation issued (ECB, closed)
Construction
05/01/2026
Violation issued (HPD, open)
A
04/13/2026
Objection resolved — Addressed
03/31/2026
Objection resolved — Addressed
03/30/2026
Objection raised — Admin
03/30/2026
Objection raised — Admin
03/26/2026
Permit issued — General Construction
B01075378-I1-GC
03/19/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATION TO EXISTING TWO (2) STORY BUILDING WITH HORIZONTAL AND VERTICAL ENLARGEMENTS ,ADDING ONE STORY FOR A TOTAL OF THREE (3) STORIES, WITH ONE RESIDENTIAL UNIT PER FLOOR FOR A TOTAL OF THREE RESIDENTIAL
B01075378-P4
03/19/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATION TO EXISTING TWO (2) STORY BUILDING WITH HORIZONTAL AND VERTICAL ENLARGEMENTS ,ADDING ONE STORY FOR A TOTAL OF THREE (3) STORIES, WITH ONE RESIDENTIAL UNIT PER FLOOR FOR A TOTAL OF THREE RESIDENTIAL
B01075378-S1
03/19/2026
Violation issued (ECB, open)
Construction
03/19/2026
Special inspection requirement — Metering
LESLIE GOOD
03/19/2026
Special inspection requirement — Air barrier — testing
LESLIE GOOD
03/19/2026
Special inspection requirement — Air barrier - visual inspection
LESLIE GOOD
03/19/2026
Special inspection requirement — Fenestration air leakage
LESLIE GOOD
03/19/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
LESLIE GOOD
03/19/2026
Special inspection requirement — Fenestration areas
LESLIE GOOD
03/19/2026
Special inspection requirement — Insulation placement and R values
LESLIE GOOD
03/19/2026
Special inspection requirement — Permanent certificate
LESLIE GOOD
03/19/2026
Special inspection requirement — Concrete - Cast-In-Place
NOEL WONG
03/19/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
NOEL WONG
03/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NOEL WONG
03/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NOEL WONG
03/19/2026
Special inspection requirement — Energy Code Compliance Inspections
LESLIE GOOD
03/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
LESLIE GOOD
03/19/2026
Special inspection requirement — Interior lighting power
LESLIE GOOD
03/19/2026
Special inspection requirement — Maintenance information
LESLIE GOOD
01/29/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATION TO EXISTING TWO (2) STORY BUILDING WITH HORIZONTAL AND VERTICAL ENLARGEMENTS ,ADDING ONE STORY FOR A TOTAL OF THREE (3) STORIES, WITH ONE RESIDENTIAL UNIT PER FLOOR FOR A TOTAL OF THREE RESIDENTIAL
B01075378-S7
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NOEL WONG
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
LESLIE GOOD
01/23/2026
Special inspection requirement — Permanent certificate
LESLIE GOOD
01/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
LESLIE GOOD
01/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
LESLIE GOOD
01/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
LESLIE GOOD
01/23/2026
Special inspection requirement — Maintenance information
LESLIE GOOD
12/31/2025
Objection resolved — Addressed
12/18/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/02/2025
Objection raised — Energy
12/01/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATION TO EXISTING TWO (2) STORY BUILDING WITH HORIZONTAL AND VERTICAL ENLARGEMENTS ,ADDING ONE STORY FOR A TOTAL OF THREE (3) STORIES, WITH ONE RESIDENTIAL UNIT PER FLOOR FOR A TOTAL OF THREE RESIDENTIAL
B01075378-P3
11/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
LESLIE GOOD
11/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NOEL WONG
11/26/2025
Special inspection requirement — Energy Code Compliance Inspections
LESLIE GOOD
11/26/2025
Special inspection requirement — HVAC-R and service water heating system controls
LESLIE GOOD
11/26/2025
Special inspection requirement — Maintenance information
LESLIE GOOD
11/26/2025
Special inspection requirement — Permanent certificate
LESLIE GOOD
11/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LESLIE GOOD
11/18/2025
Violation issued (HPD, open)
I
11/07/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATION TO EXISTING TWO (2) STORY BUILDING WITH HORIZONTAL AND VERTICAL ENLARGEMENTS ,ADDING ONE STORY FOR A TOTAL OF THREE (3) STORIES, WITH ONE RESIDENTIAL UNIT PER FLOOR FOR A TOTAL OF THREE RESIDENTIAL
B01075378-S4
11/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/31/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/15/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATION TO EXISTING TWO (2) STORY BUILDING WITH HORIZONTAL AND VERTICAL ENLARGEMENTS ,ADDING ONE STORY FOR A TOTAL OF THREE (3) STORIES, WITH ONE RESIDENTIAL UNIT PER FLOOR FOR A TOTAL OF THREE RESIDENTIAL
B01075378-S6
09/01/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSE INTERIOR RENOVATION TO EXISTING TWO (2) STORY BUILDING WITH HORIZONTAL AND VERTICAL ENLARGEMENTS ,ADDING ONE STORY FOR A TOTAL OF THREE (3) STORIES, WITH ONE RESIDENTIAL UNIT PER FLOOR FOR A TOTAL OF THREE RESIDENTIAL
B01075378-S2
08/13/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/04/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 167 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1813-60 BINYAN LLC303/22/2026
J&R CONSTRUCTION SERVICES103/22/2026
1813 1815 BINYAN103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/09/2022$1.8M—— → —$625/sf building
10/24/2016$1.4M—Private party → SKYLUCK REALTY LLC$482/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AL FFRED ARCHITECTURE PLLC603/19/2026
ROBERT SIQECA PE102/11/2025
MSM ENGINEERING SERVICES, PLLC111/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&R CONSTRUCTION SERVICESGeneral Contractor807/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AURORA BUILDING CONSULTAN9710603/19/2026
MSM ENGINEERING SERVICES,8449112/25/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJ&R CONSTRUCTION SERVICES05/19/2026
DOB NOWGeneral ConstructionPermit IssuedJ&R CONSTRUCTION SERVICES03/26/2026
DOB NOWMechanical SystemsSigned-offJ&R CONSTRUCTION SERVICES06/27/2025
DOB NOWStructuralSigned-offJ&R CONSTRUCTION SERVICES06/18/2025
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN01/03/2025
DOB NOWSprinklersSigned-offA M B MECHANICAL INC01/03/2025
DOB NOWGeneral ConstructionPermit IssuedJ&R CONSTRUCTION SERVICES11/27/2024
DOB NOWConstruction FenceSigned-offJ&R CONSTRUCTION SERVICES11/26/2024
BISOTISSUEDH Q CONSTRUCTION & RENOVA12/13/2016
BISPLISSUEDTOP PLUMBING GROUP,INC12/13/2016
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
06/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/31/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/13/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/04/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/28/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/10/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/10/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/11/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/11/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/11/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
03/19/2026MeteringLESLIE GOODenergy_progress
03/19/2026Air barrier — testing LESLIE GOODenergy_progress
03/19/2026Air barrier - visual inspectionLESLIE GOODenergy_progress
03/19/2026Fenestration air leakageLESLIE GOODenergy_progress
03/19/2026Fenestration and door U-factor and product ratingsLESLIE GOODenergy_progress
03/19/2026Fenestration areasLESLIE GOODenergy_progress
03/19/2026Insulation placement and R valuesLESLIE GOODenergy_progress
03/19/2026Permanent certificateLESLIE GOODenergy_progress
03/19/2026Concrete - Cast-In-PlaceNOEL WONGspecial
03/19/2026Excavations - Sheeting, Shoring, and BracingNOEL WONGspecial
03/19/2026Fire-Resistant Penetrations and JointsNOEL WONGspecial
03/19/2026Structural Stability – Alterations of existing buildingsNOEL WONGspecial
03/19/2026Energy Code Compliance InspectionsLESLIE GOODprogress
03/19/2026Fire-Resistance Rated ConstructionLESLIE GOODprogress
03/19/2026Interior lighting powerLESLIE GOODenergy_progress
03/19/2026Maintenance informationLESLIE GOODenergy_progress
01/23/2026Fire-Resistant Penetrations and JointsNOEL WONGspecial
01/23/2026Energy Code Compliance InspectionsLESLIE GOODprogress
01/23/2026Permanent certificateLESLIE GOODenergy_progress
01/23/2026HVAC-R and service water heating equipmentLESLIE GOODenergy_progress
01/23/2026HVAC-R and service water piping design and insulationLESLIE GOODenergy_progress
01/23/2026HVAC-R and service water heating system controlsLESLIE GOODenergy_progress
01/23/2026Maintenance informationLESLIE GOODenergy_progress
11/26/2025HVAC-R and service water heating equipmentLESLIE GOODenergy_progress
11/26/2025Fire-Resistant Penetrations and JointsNOEL WONGspecial
Latest 25 of 40.
▾Documents — 103 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/19/2026B01075378-S6Request digital key ↗
08/19/2026B01075378-S2Request digital key ↗
08/19/2026B01075378-S4Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION4
10/22/2025340913685Open ↗
09/09/2025340913685Open ↗
12/23/2024340913685Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION2
12/14/2016321494888Open ↗
12/14/2016321494888Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
07/18/2017321494888Open ↗
▸Zoning, Tax Lot & Property Records20
▸DOB NOWRestrictive Declaration/Easement 17
08/19/2026B01075378-P4Open ↗
08/13/2026B01075378-S7Open ↗
08/13/2026B01075378-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWRestrictive Declaration/Easement 27
08/19/2026B01075378-P4Open ↗
08/13/2026B01075378-I1Open ↗
08/13/2026B01075378-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/19/2026B01075378-P4Open ↗
08/13/2026B01075378-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/19/2026B01075378-P4Open ↗
08/13/2026B01075378-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/19/2026B01075378-P4Open ↗
08/13/2026B01075378-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature8
08/29/2026B01075378-S1Open ↗
08/29/2026B01075378-S1Open ↗
08/28/2026B01075378-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/19/2026B01075378-P4Open ↗
08/13/2026B01075378-S7Open ↗
08/13/2026B01075378-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026B01075378-S7Open ↗
08/29/2026B01075378-S1Open ↗
08/28/2026B01075378-P3Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
07/18/2017321494888Open ↗
12/13/2016321494888Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/13/2016321494888Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/23/2024340913685Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/13/2016321494888Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/23/2024340913685Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/19/2026B01075378-P4Open ↗
08/13/2026B01075378-I1Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/13/2016321494888Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
02/25/2025340913685Open ↗
▸BISBPP: STREET TREES SITE PLAN1
12/23/2024340913685Open ↗
▸BISSTREET TREE CHECKLIST1
03/04/2025340913685Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B01075378-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B01075378-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01075378-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/19/2026B01075378-P4Open ↗
08/13/2026B01075378-P3Open ↗
08/13/2026B01075378-S6Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
12/23/2024340913685Open ↗
12/23/2024340913685Open ↗
12/13/2016321494888Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/18/2017321494888Open ↗
12/13/2016321494888Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/18/2017321494888Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/04/2025340913685Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/23/2024340913685Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
12/23/2024340913685Open ↗
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS1
12/23/2024340913685Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/18/2017321494888Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/18/2017321494888Open ↗
12/13/2016321494888Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET1
12/13/2016321494888Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/23/2024340913685Open ↗
▸BISADDITIONAL INFORMATION1
06/28/2017321494888Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
08/19/2026B01075378-P4Open ↗
08/13/2026B01075378-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/19/2026B01075378-P4Open ↗
08/13/2026B01075378-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/19/2026B01075378-P4Open ↗
08/13/2026B01075378-I1Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
12/23/2024340913685Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
02/25/2025340913685Open ↗