← Back
Primarily 2 family with 1 store or office
6816 BAY PARKWAY
BROOKLYN · BIN 3135138
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
C4-2AZoning
4,238 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: WENZHOU REALTY LLC · 1,900 sf lot · 2.23 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HEIGHTS CONSTRUCTION SERV704/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BANGASH ASSOCIATES INC.108/27/2025
MJE PROFESSIONAL SERVICES207/21/2025
J&R DESIGN AND INSPECTION CORP.110/11/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN403/21/2026
HIGH QUALITY 338203/21/2026
HEIGHTS CONSTRUCTION SERV103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HEIGHTS CONSTRUCTION SERVGeneral Contractor304/08/2026
HIGH QUALITY CONSTRUCTIONGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BANGASH ASSOCIATES INC8488108/27/2025
J&R DESIGN AND INSPECTION6637110/11/2022
Building Lifecycle
All (33)Filed (4)Permit Issued (4)Signed Off (4)Violation (11)Special Inspection (10)
10/10/2025
Signed off — Alteration
FACADE REPAIR, STONE REPAIR, WINDOW LINTEL AND WINDOW SILL REPLACEMENT, AND GRINDING AND POINTING AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01269671-I1
10/09/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01258796-I1
10/09/2025
Signed off — Alteration
B01258792-I1
09/02/2025
Permit issued — General Construction
B01269671-I1-GC
08/27/2025
Filed — Alteration
FACADE REPAIR, STONE REPAIR, WINDOW LINTEL AND WINDOW SILL REPLACEMENT, AND GRINDING AND POINTING AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01269671-I1
08/11/2025
Special inspection requirement — Masonry
FAZAL BANGASH
08/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
FAZAL BANGASH
08/11/2025
Special inspection requirement — Final
FAZAL BANGASH
07/22/2025
Permit issued — Supported Scaffold
B01258796-I1-SF
07/21/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01258796-I1
07/21/2025
Filed — Alteration
B01258792-I1
07/21/2025
Permit issued — Sidewalk Shed
B01258792-I1-SH
02/28/2025
Violation issued (HPD, closed)
B
02/28/2025
Violation issued (HPD, closed)
A
02/28/2025
Violation issued (HPD, closed)
B
02/28/2025
Violation issued (HPD, closed)
B
02/28/2025
Violation issued (HPD, closed)
B
02/28/2025
Violation issued (HPD, closed)
B
02/28/2025
Violation issued (HPD, closed)
B
02/28/2025
Violation issued (HPD, closed)
B
02/28/2025
Violation issued (HPD, closed)
B
02/28/2025
Violation issued (HPD, closed)
A
02/28/2025
Violation issued (HPD, closed)
B
01/19/2023
Signed off — Alteration
GENERAL RENOVATION OF COMMERCIAL SPACE ON 001 WITH REPAIRING CEILING, EXISTING FLOOR AND PAINTING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08027245-I1
10/13/2022
Permit issued — General Construction
B08015633-I1-GC
10/11/2022
Filed — Alteration
GENERAL RENOVATION OF COMMERCIAL SPACE ON 001 WITH REPAIRING CEILING, EXISTING FLOOR AND PAINTING WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08027245-I1
10/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
10/04/2022
Special inspection requirement — Final
Robert Truskosky
10/04/2022
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
10/04/2022
Special inspection requirement — Fire-Resistance Rated Construction
Robert Truskosky
10/04/2022
Special inspection requirement — Air barrier - visual inspection
Robert Truskosky
10/04/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Robert Truskosky
10/04/2022
Special inspection requirement — Fenestration air leakage
Robert Truskosky
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offHEIGHTS CONSTRUCTION SERV09/02/2025
DOB NOWSupported ScaffoldSigned-offHEIGHTS CONSTRUCTION SERV07/22/2025
DOB NOWSidewalk ShedSigned-offHEIGHTS CONSTRUCTION SERV07/21/2025
DOB NOWGeneral ConstructionSigned-offHIGH QUALITY CONSTRUCTION10/13/2022
1 project · most recent 07/22/2025
FiledStatusContractorScope
07/22/2025CompleteRICHARD NEU—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
08/11/2025MasonryFAZAL BANGASHspecial
08/11/2025Tenant Protection Plan ComplianceFAZAL BANGASHspecial
08/11/2025FinalFAZAL BANGASHprogress
10/04/2022Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
10/04/2022FinalRobert Truskoskyprogress
10/04/2022Energy Code Compliance InspectionsRobert Truskoskyprogress
10/04/2022Fire-Resistance Rated ConstructionRobert Truskoskyprogress
10/04/2022Air barrier - visual inspectionRobert Truskoskyenergy_progress
10/04/2022Fenestration and door U-factor and product ratingsRobert Truskoskyenergy_progress
10/04/2022Fenestration air leakageRobert Truskoskyenergy_progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/28/2026B08027245-I1Request digital key ↗
08/21/2026B01258796-I1Request digital key ↗
08/21/2026B01258792-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/28/2026B08027245-I1Open ↗
08/21/2026B01258796-I1Open ↗
08/21/2026B01258792-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026B01269671-I1Open ↗
08/24/2026B08027245-I1Open ↗
08/24/2026B08027245-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026B01269671-I1Open ↗
08/24/2026B08027245-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026B08027245-I1Open ↗
08/13/2026B01269671-I1Open ↗