ECB12/12/2018FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35327702R ISSUED ON 04/06/18 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. WORK W/O PERMIT. NOTE AT CELLAR LEVEL INSTALLED FULL HEIGHT PAR$2K due
DOB06/27/2018FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB04/06/2018WORK W/O PERMIT. NOTE AT CELLAR LEVEL ERECTED FULL HEIGHT PARTITIONS FOR BATHROOM. INSTALLED WATER AND WASTE LINES FOR 3PC BATHROOM (SINK, TOILET, TUB), MOPSINK AND WASHER. ALSO INSTALLED GAS LINE AT KITCHEN$2K due
Two family brick · 2,404 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)