← Back
Two family brick
873 55 STREET
BROOKLYN · BIN 3139150
💬 Discuss this project
1910Year Built
2Stories
B1Building Class
R6Zoning
2,200 sfGross Floor Area
2Units
Two family brick · 2,003 sf lot · 1.1 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 11 docs
Floor 22p · 2 filings · 20 docs
Floor 1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CL ENGINEERING P.C.608/02/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J BUILDING CONSULTING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CROSSFIELD PLBG.&HTGPlumbing607/08/2026
EKOLINE INCGeneral Contractor403/22/2026
SO PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL ENGINEERING P.C.6781608/02/2021
Building Lifecycle
All (35)Filed (6)Permit Issued (3)Signed Off (2)Special Inspection (24)
09/08/2021
Signed off — Alteration
INTERIOR RENOVATION ON THE SECOND FLOOR AT EXISTING 2 STORY BUILDING WITH GENERAL CONSTRUCTION WORK AND MECHANICAL WORK AS PER PLAN FILED HEREWITH. RELATED PLUMBING WORK JOB#B00494064, NO CHANGE IN USE, EGRESS, OR CERTIFICATE OF OCCUPANCY.
B00497660-I1
09/07/2021
Signed off — Alteration
B00494064-I1
08/06/2021
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
08/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
08/06/2021
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
08/02/2021
Filed — Alteration
B00494064-P3
08/02/2021
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
08/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
08/02/2021
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
07/11/2021
Filed — Alteration
B00494064-P2
07/09/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
07/09/2021
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
07/09/2021
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
06/23/2021
Special inspection requirement — Lighting in dwelling units
CHRISTIAN LOZADA
06/23/2021
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
06/23/2021
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
06/23/2021
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
06/23/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
06/23/2021
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
06/23/2021
Special inspection requirement — Fire-Resistance Rated Construction
CHRISTIAN LOZADA
06/23/2021
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
06/23/2021
Special inspection requirement — Final
CHRISTIAN LOZADA
06/23/2021
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
06/23/2021
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
06/23/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
06/22/2021
Filed — Alteration
B00494064-P1
06/22/2021
Filed — Alteration
INTERIOR RENOVATION ON THE SECOND FLOOR AT EXISTING 2 STORY BUILDING WITH GENERAL CONSTRUCTION WORK AND MECHANICAL WORK AS PER PLAN FILED HEREWITH. RELATED PLUMBING WORK JOB#B00494064, NO CHANGE IN USE, EGRESS, OR CERTIFICATE OF OCCUPANCY.
B00497660-P1
06/19/2021
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
06/19/2021
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
06/19/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
05/07/2021
Permit issued — Plumbing
B00494064-I1-PL
04/09/2021
Permit issued — Plumbing
B00494064-I1-PL
04/07/2021
Permit issued — General Construction
B00497660-I1-GC-CX
04/05/2021
Filed — Alteration
INTERIOR RENOVATION ON THE SECOND FLOOR AT EXISTING 2 STORY BUILDING WITH GENERAL CONSTRUCTION WORK AND MECHANICAL WORK AS PER PLAN FILED HEREWITH. RELATED PLUMBING WORK JOB#B00494064, NO CHANGE IN USE, EGRESS, OR CERTIFICATE OF OCCUPANCY.
B00497660-I1
04/05/2021
Filed — Alteration
B00494064-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG05/07/2021
DOB NOWPlumbingSigned-offNICHOLAS SUIDA04/09/2021
DOB NOWGeneral ConstructionSigned-offEKOLINE INC04/07/2021
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
08/06/2021Maintenance informationCHRISTIAN LOZADAenergy_progress
08/06/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
08/06/2021Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
08/02/2021Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
08/02/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
08/02/2021Maintenance informationCHRISTIAN LOZADAenergy_progress
07/09/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
07/09/2021Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
07/09/2021Maintenance informationCHRISTIAN LOZADAenergy_progress
06/23/2021Lighting in dwelling unitsCHRISTIAN LOZADAenergy_progress
06/23/2021HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
06/23/2021HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
06/23/2021Interior lighting powerCHRISTIAN LOZADAenergy_progress
06/23/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
06/23/2021Mechanical SystemsCHRISTIAN LOZADAspecial
06/23/2021Fire-Resistance Rated ConstructionCHRISTIAN LOZADAprogress
06/23/2021Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
06/23/2021FinalCHRISTIAN LOZADAprogress
06/23/2021Maintenance informationCHRISTIAN LOZADAenergy_progress
06/23/2021Permanent certificateCHRISTIAN LOZADAenergy_progress
06/23/2021HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
06/19/2021Maintenance informationCHRISTIAN LOZADAenergy_progress
06/19/2021Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
06/19/2021Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026B00497660-P1Request digital key ↗
09/01/2026B00497660-I1Request digital key ↗
09/01/2026B00494064-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026B00494064-P2Open ↗
09/01/2026B00494064-P2Open ↗
08/25/2026B00494064-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00497660-P1Open ↗
09/01/2026B00497660-I1Open ↗
09/01/2026B00494064-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B00494064-P2Open ↗
08/25/2026B00494064-P3Open ↗
08/25/2026B00494064-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00497660-I1Open ↗
09/01/2026B00497660-P1Open ↗
09/01/2026B00494064-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00494064-I1Open ↗
08/13/2026B00497660-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
09/01/2026B00494064-P3Open ↗