← Back
Garage, residential, tax class 1
1030 56 STREET
BROOKLYN · BIN 3139975
💬 Discuss this project
1930Year Built
1Stories
G0Building Class
R5Zoning
0 sfGross Floor Area
1Units
Garage, residential, tax class 1 · 1,617 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 20 docs
BulkheadUnder Construction2p · 1 filing · 20 docs
Floor 3Under Construction2p · 1 filing · 20 docs
Floor 2Under Construction3p · 1 filing · 20 docs
Floor 1Under Construction2p · 1 filing · 20 docs
CellarUnder Construction1p · 1 filing · 20 docs
BasementUnder Construction1p · 1 filing · 20 docs
1 job · most recent 05/25/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
05/25/2026Permit IssuedGS INTERIORS LLCHeating and Air Conditioning Systems, Ventilation Systems
1 job · most recent 05/25/2026
FiledStatusContractorScope
05/25/2026——55 heads
1 job · most recent 05/25/2026
Storm Water/Sanitary
FiledStatusContractorScope
05/25/2026——Storm, Water/Sanitary
1 job · most recent 05/25/2026
Concrete
FiledStatusContractorScope
05/25/2026Permit IssuedGS INTERIORS LLCConcrete
1 job · most recent 05/25/2026
Fence
FiledStatusContractorScope
05/25/2026Permit IssuedGS INTERIORS LLCFence
Building Lifecycle
All (109)Filed (9)Permit Issued (2)Signed Off (1)Inspection (1)Objection (66)Special Inspection (30)
08/31/2026
Objection resolved — Addressed
07/14/2026
Signed off — Full Demolition
Full demolition of a one (1) story with cellar building.
B01394786-I1
06/25/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/15/2026
Objection resolved — Addressed
06/15/2026
Objection resolved — Addressed
06/05/2026
Permit issued — Full Demolition
B01394786-I1-FD
06/01/2026
Objection resolved — Addressed
06/01/2026
Objection resolved — Addressed
06/01/2026
Objection resolved — Addressed
05/27/2026
Permit issued — Construction Fence
B01360497-Z1-FN
05/26/2026
Special inspection requirement — Footing and Foundation
05/25/2026
Filed — New Building
INSTALL NEW SPRINKLER SYSTEMS, PER DESIGN DRAWINGS. FURNISH AND INSTALL ALL NECESSARY VALVES, GAUGES, EQUIPMENT. ETC., CONTRACTOR TO FURNISH AND INSTALL NEW BACKFLOW PREVENTER AS per DRAWINGS. PROVIDE ALL OTHER WORK ITEMS AS INDICATED ON PLANS.
B01360497-Z1
05/14/2026
Objection resolved — Resolved
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Resolved
05/05/2026
Filed — Full Demolition
Full demolition of a one (1) story with cellar building.
B01394786-I1
04/30/2026
Objection raised — Other
04/30/2026
Objection raised — Scope
04/30/2026
Objection raised — Admin
04/30/2026
Objection raised — Structural
04/30/2026
Objection raised — Admin
04/30/2026
Objection raised — Other
04/30/2026
Objection raised — Structural
04/30/2026
Objection raised — Other
04/30/2026
Objection raised — Inspections
04/30/2026
Objection raised — Admin
04/30/2026
Objection raised — Inspections
04/30/2026
Objection raised — Other
04/30/2026
Objection raised — Other
04/30/2026
Objection resolved — Addressed
04/30/2026
Objection resolved — Addressed
04/30/2026
Objection resolved — Addressed
04/19/2026
Objection raised — Other
04/17/2026
Objection raised — Fire_Protection
04/17/2026
Objection resolved — Resolved
04/17/2026
Objection resolved — Resolved
04/17/2026
Objection resolved — Resolved
04/17/2026
Objection resolved — Resolved
04/16/2026
Objection raised — Fire_Protection
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/15/2026
Objection resolved — Resolved
04/14/2026
Filed — New Building
INSTALL NEW SPRINKLER SYSTEMS, PER DESIGN DRAWINGS. FURNISH AND INSTALL ALL NECESSARY VALVES, GAUGES, EQUIPMENT. ETC., CONTRACTOR TO FURNISH AND INSTALL NEW BACKFLOW PREVENTER AS per DRAWINGS. PROVIDE ALL OTHER WORK ITEMS AS INDICATED ON PLANS.
B01360497-S1
04/14/2026
Filed — New Building
INSTALL NEW SPRINKLER SYSTEMS, PER DESIGN DRAWINGS. FURNISH AND INSTALL ALL NECESSARY VALVES, GAUGES, EQUIPMENT. ETC., CONTRACTOR TO FURNISH AND INSTALL NEW BACKFLOW PREVENTER AS per DRAWINGS. PROVIDE ALL OTHER WORK ITEMS AS INDICATED ON PLANS.
B01360497-S8
04/14/2026
Filed — New Building
INSTALL NEW SPRINKLER SYSTEMS, PER DESIGN DRAWINGS. FURNISH AND INSTALL ALL NECESSARY VALVES, GAUGES, EQUIPMENT. ETC., CONTRACTOR TO FURNISH AND INSTALL NEW BACKFLOW PREVENTER AS per DRAWINGS. PROVIDE ALL OTHER WORK ITEMS AS INDICATED ON PLANS.
B01360497-S2
04/14/2026
Special inspection requirement — Subgrade Inspections
04/14/2026
Special inspection requirement — Concrete - Cast-In-Place
04/14/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
04/13/2026
Objection raised — Zoning
04/13/2026
Objection raised — Mechanical
04/13/2026
Objection raised — Plumbing
04/13/2026
Objection raised — Plumbing
04/13/2026
Objection raised — Plumbing
04/13/2026
Objection raised — Zoning
04/13/2026
Objection raised — Fire_Protection
04/07/2026
Special inspection requirement — Air barrier — testing
04/07/2026
Special inspection requirement — Permanent certificate
Latest 60 of 109 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZENITH HOME INSPECTIONS105/25/2026
SH ENGINEERING PLLC404/14/2026
SOLHJOU ENGINEERING PLLC303/25/2026
MOHAMMAD AHEAD, PE102/24/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EZFILINGNYCORP103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BSC SERVICES LLCGeneral Contractor107/08/2026
GS INTERIORS LLCGeneral Contractor107/08/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offBSC SERVICES LLC06/05/2026
DOB NOWConstruction FencePermit IssuedGS INTERIORS LLC05/27/2026
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
05/26/2026Footing and Foundation—progress
04/14/2026Subgrade Inspections—special
04/14/2026Concrete - Cast-In-Place—special
04/14/2026Subsurface Investigations (Borings/Test Pits)—special
04/07/2026Air barrier — testing —energy_progress
04/07/2026Permanent certificate—energy_progress
04/06/2026Subsurface Investigations (Borings/Test Pits)—special
04/06/2026Subgrade Inspections—special
04/06/2026Excavations - Sheeting, Shoring, and Bracing—special
03/30/2026Final—progress
03/30/2026Footing and Foundation—progress
03/25/2026Shutoff dampersNORMAN LOKenergy_progress
03/25/2026Fire-Resistant Penetrations and Joints—special
03/25/2026Duct leakage testing, insulation and designNORMAN LOKenergy_progress
03/25/2026Permanent certificate—energy_progress
03/25/2026Fire-Resistant Penetrations and JointsNORMAN LOKspecial
03/25/2026Energy Code Compliance Inspections—progress
03/24/2026HVAC-R and service water heating equipment—energy_progress
03/24/2026HVAC-R and service water heating system controls—energy_progress
03/24/2026Maintenance information—energy_progress
03/24/2026HVAC-R and service water piping design and insulation—energy_progress
03/23/2026Ventilation and air distribution systemNORMAN LOKenergy_progress
03/23/2026HVAC-R and service water heating system controlsNORMAN LOKenergy_progress
03/23/2026HVAC-R and service water heating equipmentNORMAN LOKenergy_progress
03/23/2026Fire-Resistant Penetrations and Joints—special
Latest 25 of 46.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/17/2026B01394786-I1Request digital key ↗
08/16/2026B01360497-S6Request digital key ↗
08/16/2026B01360497-S5Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
10/21/2025322120959Open ↗
09/18/2025322120959Open ↗
09/17/2025322120959Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/26/2025322120959Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026B01360497-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B01360497-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/15/2026B01360497-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/16/2026B01360497-S8Open ↗
08/16/2026B01360497-S6Open ↗
08/16/2026B01360497-S5Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/29/2026B01360497-S6Open ↗
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/17/2026B01394786-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/29/2026B01360497-S6Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/17/2026B01394786-I1Open ↗
▸DOB NOWWater Cut-Off1
08/17/2026B01394786-I1Open ↗
▸DOB NOWGas Cut-Off1
08/17/2026B01394786-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/17/2026B01394786-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026B01360497-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026B01394786-I1Open ↗
▸DOB NOWRodent Control1
08/17/2026B01394786-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT2
08/15/2026B01360497-S2Open ↗
08/14/2026B01360497-S8Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/15/2026B01360497-S2Open ↗
08/14/2026B01360497-S8Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/15/2026B01360497-S2Open ↗
08/14/2026B01360497-S8Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/17/2025322120959Open ↗
▸Other Documents14
▸BISSupporting Document: Fee Deferment5
12/26/2025322120959Open ↗
12/26/2025322120959Open ↗
12/26/2025322120959Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification2
08/17/2026B01394786-I1Open ↗
08/15/2026B01360497-I1Open ↗
▸BISSupporting Document: Fee Exempt1
12/26/2025322120959Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
12/26/2025322120959Open ↗
▸DOB NOWCommunity Board Notification1
08/17/2026B01394786-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/17/2026B01394786-I1Open ↗
▸DOB NOWStructure Photographs1
08/17/2026B01394786-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/15/2026B01360497-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026B01360497-I1Open ↗