← Back
Five to six families
1010 57 STREET
BROOKLYN · BIN 3140284
💬 Discuss this project
1920Year Built
3Stories
C2Building Class
R5Zoning
5,270 sfGross Floor Area
6Units
Rent Stabilized56 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: CHEN & LIN REAL PROPERTY LLC · 2,346 sf lot · 2.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbing
Floor 39p · 1 filing · 20 docs
Floor 28p · 1 filing · 20 docs
Floor 115p · 2 filings · 20 docs
Cellar16p · 1 filing · 20 docs
1 job · most recent 01/22/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/22/2026Signed-offXH&RC PLBG AND HTG INCGas, Water/Sanitary
1 job · most recent 04/17/2025
General Wiring
FiledStatusContractorScope
04/17/2025Permit IssuedERIC & NG ELEC'L, INC.General Wiring
1 job · most recent 01/22/2026
Steel
FiledStatusContractorScope
01/22/2026Permit IssuedL&L CONSTRUCTION DEVELOPSteel
Building Lifecycle
All (124)Filed (8)Permit Issued (6)Violation (60)Inspection (6)Objection (16)Special Inspection (28)
08/21/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/10/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/01/2026
Violation issued (HPD, closed)
A
03/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
XIONGCAI GU
01/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
01/26/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
XIONGCAI GU
01/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIONGCAI GU
01/22/2026
Filed — Alteration
PROPOSED PLUMBING WORK AT EXISTING CELLAR AND (4) EXISTING DWELLING UNITS IN AN EXISTING 3-STORY 6-FAMILY DWELLING.
B01082069-P5
01/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIONGCAI GU
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
01/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
XIONGCAI GU
01/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
XIONGCAI GU
10/30/2025
Violation issued (HPD, open)
A
10/30/2025
Violation issued (HPD, closed)
B
10/24/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/19/2025
Permit issued — General Construction
B01082069-I1-GC
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, open)
A
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, open)
C
08/05/2025
Violation issued (HPD, open)
A
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
B
08/05/2025
Violation issued (HPD, closed)
A
08/05/2025
Violation issued (HPD, closed)
B
06/26/2025
Filed — Alteration
PROPOSED PLUMBING WORK AT EXISTING CELLAR AND (4) EXISTING DWELLING UNITS IN AN EXISTING 3-STORY 6-FAMILY DWELLING.
B01082069-P4
06/26/2025
Special inspection requirement — Tenant Protection Plan Compliance
Fei Zeng
06/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
06/26/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
XIONGCAI GU
06/26/2025
Special inspection requirement — Fenestration areas
XIONGCAI GU
06/25/2025
Violation issued (ECB, closed)
Construction
06/25/2025
Violation issued (ECB, closed)
Construction
06/25/2025
Violation issued (ECB, closed)
Construction
06/25/2025
Violation issued (ECB, closed)
Construction
06/25/2025
Violation issued (ECB, closed)
Construction
Latest 60 of 124 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHEN LIN REAL PROPERTY3107/08/2026
CGEN703/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/30/2024$1.5M—CGEN HOLDINGS LLC → CHEN & LIN REAL PROPERTY LLC$287/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TAN ARCHITECT P.C601/22/2026
Z & T ENGINEERING, P.C.104/01/2025
FREDERICK GOLDBERG ARCHITECT PC101/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROYALT EXPEDITING103/21/2026
J R CONSULTING SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIMROSE SERVICE INCGeneral Contractor304/09/2026
L&L CONSTRUCTION DEVELOPGeneral Contractor104/09/2026
MKB CONSTRUCTION USA LLCGeneral Contractor107/08/2026
XH&RC PLBG AND HTG INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G ENGINEERING PC7778601/22/2026
Z & T ENGINEERING, P.C.591204/01/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedL&L CONSTRUCTION DEVELOP09/19/2025
DOB NOWStructuralPermit IssuedPRIMROSE SERVICE INC06/18/2025
DOB NOWStructuralPermit IssuedPRIMROSE SERVICE INC06/18/2025
DOB NOWStructuralPermit IssuedPRIMROSE SERVICE INC06/18/2025
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC03/11/2025
DOB NOWGeneral ConstructionPermit IssuedMKB CONSTRUCTION USA LLC08/23/2024
BISPLISSUEDSENID PL & HTG CORP06/14/2019
BISMHISSUEDYMJ & JC CORP01/22/2019
BISPLISSUEDSENID PL & HTG CORP05/15/2018
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/21/2026Fail-Final General Construction Non-Directive 14FailView ↗
08/10/2026Fail-Final General Construction Non-Directive 14FailView ↗
03/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/24/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
01/26/2026HVAC-R and service water heating system controlsXIONGCAI GUenergy_progress
01/26/2026Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
01/26/2026Tenant Protection Plan Compliance—special
01/26/2026HVAC-R and service water heating equipmentXIONGCAI GUenergy_progress
01/26/2026HVAC-R and service water piping design and insulationXIONGCAI GUenergy_progress
01/21/2026HVAC-R and service water piping design and insulationXIONGCAI GUenergy_progress
01/21/2026Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
01/21/2026Tenant Protection Plan Compliance—special
01/21/2026HVAC-R and service water heating equipmentXIONGCAI GUenergy_progress
01/21/2026HVAC-R and service water heating system controlsXIONGCAI GUenergy_progress
06/26/2025Tenant Protection Plan ComplianceFei Zengspecial
06/26/2025Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
06/26/2025Fenestration and door U-factor and product ratingsXIONGCAI GUenergy_progress
06/26/2025Fenestration areasXIONGCAI GUenergy_progress
06/25/2025Fenestration and door U-factor and product ratingsXIONGCAI GUenergy_progress
06/25/2025Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
06/25/2025Tenant Protection Plan Compliance—special
06/25/2025Fenestration areasXIONGCAI GUenergy_progress
03/28/2025Structural Stability – Alterations of existing buildingsFei Zengspecial
03/28/2025Tenant Protection Plan ComplianceFei Zengspecial
03/28/2025Subgrade InspectionsFei Zengspecial
03/28/2025Structural Steel - WeldingFei Zengspecial
03/28/2025Structural Steel - High Strength BoltingFei Zengspecial
03/28/2025Post-installed AnchorsFei Zengspecial
03/28/2025Concrete - Cast-In-PlaceFei Zengspecial
Latest 25 of 28.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/22/2026B01082069-S1Request digital key ↗
08/22/2026B01082069-I1Request digital key ↗
08/22/2026B01082069-P5Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/01/2026B00439748-I1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION2
07/30/2020321724657Open ↗
02/23/2018321724657Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
11/14/2019321724657Open ↗
06/06/2019321724657Open ↗
▸BISWORK PERMIT APPLICATION2
06/17/2019321724657Open ↗
05/15/2018321724657Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature11
08/29/2026B01082069-P5Open ↗
08/29/2026B01082069-P5Open ↗
08/29/2026B01082069-P5Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026B00439748-I1Open ↗
08/22/2026B01082069-I1Open ↗
08/22/2026B01082069-P5Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026B01082069-P5Open ↗
08/28/2026B01082069-I1Open ↗
08/28/2026B01082069-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/08/2018321724657Open ↗
02/15/2018321724657Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/23/2018321724657Open ↗
▸BISSCHEDULE B - PLUMBING1
07/30/2020321724657Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
02/15/2018321724657Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/22/2026B01082069-I1Open ↗
08/22/2026B01082069-P5Open ↗
08/22/2026B01082069-P4Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
02/15/2018321724657Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
02/15/2018321724657Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/01/2026B00439748-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/07/2018321724657Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
02/23/2018321724657Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
02/23/2018321724657Open ↗
01/24/2018321724657Open ↗