← Back
Two family brick
824 59 STREET
BROOKLYN · BIN 3140851
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R6Zoning
3,288 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · 2,003 sf lot · 1.64 FAR built · Flood zone X
Locations of Work
Structural
Cellar1p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HPD307/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HIRANI ENGINEERING AND LAND SURVEYI112/21/2023
URBAN ENGINEERING, PC202/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
URBAN ENGINEERING, PC403/21/2026
XPEDITE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GOHAR CONSTRUCTION CORPGeneral Contractor307/08/2026
GRANITE ENVIRONMENT, LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
URBAN ENGINEERING, PC2575202/16/2023
Building Lifecycle
All (29)Filed (3)Permit Issued (3)Signed Off (2)Violation (6)Special Inspection (15)
05/22/2025
Signed off — Alteration
BRICK FACADE WORK INCLUDING BRICK MORTAR JOINT REPAIR AND RE-POINTING, BRICK WALL REBUILD/RETROFIT, AND STEEL LINTEL REPLACEMENT. RETROFIT OF DAMAGED EXISTING FIRST FLOOR WOOD JOISTS.
B00693779-I1
01/11/2024
Signed off — Alteration
Installation of Wall Ties in conjunction with HPD Emergency Demolition ED# 17126 filed at 822 59 Street, FD# B00912532
B00917337-I1
12/22/2023
Permit issued — General Construction
B00917337-I1-GC
12/21/2023
Filed — Alteration
Installation of Wall Ties in conjunction with HPD Emergency Demolition ED# 17126 filed at 822 59 Street, FD# B00912532
B00917337-I1
08/10/2023
Special inspection requirement — Final
THOMAS WENDEL
07/22/2023
Permit issued — Structural
B00693779-I1-GC-CX
02/16/2023
Filed — Alteration
BRICK FACADE WORK INCLUDING BRICK MORTAR JOINT REPAIR AND RE-POINTING, BRICK WALL REBUILD/RETROFIT, AND STEEL LINTEL REPLACEMENT. RETROFIT OF DAMAGED EXISTING FIRST FLOOR WOOD JOISTS.
B00693779-P1
02/16/2023
Special inspection requirement — Masonry
Nizar Khoury
02/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nizar Khoury
02/16/2023
Special inspection requirement — Structural Wood Frame
Nizar Khoury
02/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
Nizar Khoury
02/16/2023
Special inspection requirement — Final
Nizar Khoury
02/16/2023
Special inspection requirement — Concrete - Cast-In-Place
02/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
02/16/2023
Special inspection requirement — Structural Wood Frame
02/16/2023
Special inspection requirement — Structural Steel - Details
Nizar Khoury
02/16/2023
Special inspection requirement — Concrete - Cast-In-Place
Nizar Khoury
02/15/2023
Special inspection requirement — Structural Steel - Details
Nizar Khoury
02/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nizar Khoury
02/15/2023
Special inspection requirement — Final
Nizar Khoury
02/15/2023
Special inspection requirement — Masonry
Nizar Khoury
08/18/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/20/2022
Permit issued — Structural
B00693779-I1-GC-CX
03/22/2022
Filed — Alteration
BRICK FACADE WORK INCLUDING BRICK MORTAR JOINT REPAIR AND RE-POINTING, BRICK WALL REBUILD/RETROFIT, AND STEEL LINTEL REPLACEMENT. RETROFIT OF DAMAGED EXISTING FIRST FLOOR WOOD JOISTS.
B00693779-I1
04/27/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/27/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/14/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/12/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/27/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGRANITE ENVIRONMENT, LLC12/22/2023
DOB NOWStructuralSigned-offGOHAR CONSTRUCTION CORP07/22/2023
DOB NOWStructuralSigned-offGOHAR CONSTRUCTION CORP07/20/2022
1 project · most recent 08/29/2026
General Wiring
FiledStatusContractorScope
08/29/2026Permit IssuedJASON SALOME ELEC'L CONTGGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
08/10/2023FinalTHOMAS WENDELprogress
02/16/2023MasonryNizar Khouryspecial
02/16/2023Structural Stability – Alterations of existing buildingsNizar Khouryspecial
02/16/2023Structural Wood FrameNizar Khouryprogress
02/16/2023Fire-Resistance Rated ConstructionNizar Khouryprogress
02/16/2023FinalNizar Khouryprogress
02/16/2023Concrete - Cast-In-Place—special
02/16/2023Fire-Resistance Rated Construction—progress
02/16/2023Structural Wood Frame—progress
02/16/2023Structural Steel - DetailsNizar Khouryspecial
02/16/2023Concrete - Cast-In-PlaceNizar Khouryspecial
02/15/2023Structural Steel - DetailsNizar Khouryspecial
02/15/2023Structural Stability – Alterations of existing buildingsNizar Khouryspecial
02/15/2023FinalNizar Khouryprogress
02/15/2023MasonryNizar Khouryspecial
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/30/2026B00693779-P1Request digital key ↗
08/30/2026B00693779-I1Request digital key ↗
08/26/2026B00917337-I1Request digital key ↗
▸Seals & Professional Certifications15
▸DOB NOWSpecial Inspector Seal & Signature7
08/27/2026B00693779-P1Open ↗
08/27/2026B00693779-P1Open ↗
08/27/2026B00693779-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026B00917337-I1Open ↗
08/27/2026B00693779-P1Open ↗
08/23/2026B00693779-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/30/2026B00693779-I1Open ↗
08/13/2026B00693779-P1Open ↗
08/13/2026B00917337-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B00917337-I1Open ↗