← Back
Five to six families
6320 14 AVENUE
BROOKLYN · BIN 3141854
💬 Discuss this project
1920Year Built
3Stories
C2Building Class
R5BZoning
3,300 sfGross Floor Area
5Units
Rent Stabilized23 Open Violations ▸FDNY Report ↗
Five to six families · 1,587 sf lot · 2.08 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction9p · 1 filing · 20 docs
CellarUnder Construction9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CMZ REALTY CORP.303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/07/2021$1.1M—CMZ REALTY CORP. → Private party$348/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYX ENGINEERING, PLLC308/26/2026
JAY ZHU ENGINEERING DESIGN PC304/28/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYX ENGINEERING, PLLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW LAND CONSTRUCTION NYGeneral Contractor104/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NYX ENGINEERING, PLLC6118608/26/2026
Building Lifecycle
All (121)Filed (6)Permit Issued (2)Violation (38)Inspection (10)Objection (36)Special Inspection (29)
08/26/2026
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK TYPE FOR THE INTERIOR RENOVATION OF THE EXISTING THREE-STORY BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01272123-P4
08/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
08/25/2026
Special inspection requirement — Fenestration areas
Xiao Huang
08/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Xiao Huang
08/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
Xiao Huang
08/25/2026
Special inspection requirement — Energy Code Compliance Inspections
Xiao Huang
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiao Huang
08/25/2026
Special inspection requirement — Fenestration air leakage
Xiao Huang
07/10/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/21/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/01/2026
Violation issued (HPD, open)
A
04/28/2026
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK TYPE FOR THE INTERIOR RENOVATION OF THE EXISTING THREE-STORY BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01272123-P3
04/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
Xiao Huang
04/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
Xiao Huang
04/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Xiao Huang
04/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiao Huang
04/10/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Xiao Huang
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiao Huang
03/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
Xiao Huang
03/06/2026
Special inspection requirement — Fenestration areas
Xiao Huang
03/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Xiao Huang
03/06/2026
Special inspection requirement — Fenestration air leakage
Xiao Huang
03/05/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/05/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
03/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/24/2026
Objection resolved — Addressed
02/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
02/18/2026
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK TYPE FOR THE INTERIOR RENOVATION OF THE EXISTING THREE-STORY BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01272123-P2
02/12/2026
Objection raised — Other
02/03/2026
Objection resolved — Addressed
01/30/2026
Objection resolved — Addressed
01/30/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
01/16/2026
Objection resolved — Addressed
01/08/2026
Objection raised — Admin
01/08/2026
Objection raised — Other
01/08/2026
Objection raised — Other
01/08/2026
Objection raised — Scope
01/08/2026
Objection raised — Scope
01/08/2026
Objection raised — Cost
01/08/2026
Objection raised — Other
01/05/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/30/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/23/2025
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK TYPE FOR THE INTERIOR RENOVATION OF THE EXISTING THREE-STORY BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01272123-P1
12/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiao Huang
12/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Xiao Huang
12/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
Xiao Huang
12/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
Xiao Huang
11/19/2025
Violation issued (HPD, open)
I
10/17/2025
Permit issued — Plumbing
B01272123-S1-PL
10/10/2025
Filed — Alteration
SUBSEQUENT FILING FOR PLUMBING WORK TYPE FOR THE INTERIOR RENOVATION OF THE EXISTING THREE-STORY BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01272123-S1
10/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Xiao Huang
10/09/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Xiao Huang
10/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiao Huang
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.10/17/2025
DOB NOWGeneral ConstructionPermit IssuedNEW LAND CONSTRUCTION NY10/03/2025
BISOTISSUEDNY BUILDING ASSOCIATES IN11/11/2020
BISOTISSUEDNY BUILDING ASSOCIATES IN08/25/2020
BISPLISSUEDJES PLUMBING AND HEATING01/13/1995
BIS—ISSUEDNATIVO GENERAL CONST01/10/1995
1 project · most recent 08/26/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/26/2026Signed-offAMERICAN STANDARD P&H CORGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/10/2026Fail-Final General Construction Non-Directive 14FailView ↗
05/21/2026Fail-Final General Construction Non-Directive 14FailView ↗
04/10/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/05/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/05/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/05/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/05/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
08/25/2026Structural Stability – Alterations of existing buildings—special
08/25/2026Fenestration areasXiao Huangenergy_progress
08/25/2026Fenestration and door U-factor and product ratingsXiao Huangenergy_progress
08/25/2026Fire-Resistance Rated ConstructionXiao Huangprogress
08/25/2026Energy Code Compliance InspectionsXiao Huangprogress
08/25/2026Fire-Resistant Penetrations and JointsXiao Huangspecial
08/25/2026Fenestration air leakageXiao Huangenergy_progress
04/27/2026HVAC-R and service water heating system controlsXiao Huangenergy_progress
04/27/2026HVAC-R and service water heating equipmentXiao Huangenergy_progress
04/27/2026HVAC-R and service water piping design and insulationXiao Huangenergy_progress
04/27/2026Fire-Resistant Penetrations and JointsXiao Huangspecial
03/06/2026Energy Code Compliance InspectionsXiao Huangprogress
03/06/2026Fire-Resistant Penetrations and JointsXiao Huangspecial
03/06/2026Structural Stability – Alterations of existing buildings—special
03/06/2026Fire-Resistance Rated ConstructionXiao Huangprogress
03/06/2026Fenestration areasXiao Huangenergy_progress
03/06/2026Fenestration and door U-factor and product ratingsXiao Huangenergy_progress
03/06/2026Fenestration air leakageXiao Huangenergy_progress
02/24/2026Structural Stability – Alterations of existing buildings—special
12/23/2025Fire-Resistant Penetrations and JointsXiao Huangspecial
12/23/2025HVAC-R and service water piping design and insulationXiao Huangenergy_progress
12/23/2025HVAC-R and service water heating equipmentXiao Huangenergy_progress
12/23/2025HVAC-R and service water heating system controlsXiao Huangenergy_progress
10/09/2025Energy Code Compliance InspectionsXiao Huangprogress
10/09/2025Fenestration and door U-factor and product ratingsXiao Huangenergy_progress
Latest 25 of 29.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/18/2026B01272123-P3Request digital key ↗
08/18/2026B01272123-P2Request digital key ↗
08/18/2026B01272123-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
08/21/2020340751403Open ↗
▸BISWORK PERMIT APPLICATION1
08/28/2020340751403Open ↗
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026B01272123-P4Open ↗
09/23/2026B01272123-P4Open ↗
09/01/2026B01272123-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/18/2026B01272123-P3Open ↗
08/18/2026B01272123-P2Open ↗
08/18/2026B01272123-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026B01272123-P4Open ↗
09/01/2026B01272123-P1Open ↗
08/26/2026B01272123-P2Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/21/2020340751403Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/21/2020340751403Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
08/21/2020340751403Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/18/2026B01272123-P3Open ↗
08/18/2026B01272123-P2Open ↗
08/18/2026B01272123-S1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
08/21/2020340751403Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/03/2021340751403Open ↗
08/21/2020340751403Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/03/2021340751403Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
03/03/2021340751403Open ↗
08/21/2020340751403Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/03/2021340751403Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/03/2021340751403Open ↗
08/21/2020340751403Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
02/22/2021340751403Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/21/2020340751403Open ↗
▸Other Documents1
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
03/03/2021340751403Open ↗