← Back
Predominantly retail with other uses
188 BAY RIDGE AVENUE
BROOKLYN · BIN 3145570
💬 Discuss this project
1931Year Built
2Stories
K4Building Class
R3-2Zoning
2,700 sfGross Floor Area
2Units
9 Open Violations 7 unresolved · 2 paperwork only ▸FDNY Report ↗
Predominantly retail with other uses · 2,000 sf lot · 1.35 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar5p · 2 filings · 20 docs
1 job · most recent 04/12/2018
General Wiring
FiledStatusContractorScope
04/12/2018On Hold - Returned CheckWCK ELECTRIC CORP.General Wiring
1 job · most recent 09/05/2025
FiledStatusContractorScope
09/05/2025Permit IssuedGREENER COUNTY.CONSTR INC1 scope_items
Building Lifecycle
All (56)Filed (6)Permit Issued (4)Signed Off (3)Violation (21)Inspection (4)Special Inspection (18)
07/23/2026
Violation issued (ECB, open)
Construction
04/10/2026
Signed off — Alteration
INSTALL ONE (1) NEW STEAM BOILER IN THE CELLAR.
B01201177-S1
03/26/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/05/2026
Signed off — Alteration
INSTALL ONE (1) NEW STEAM BOILER IN THE CELLAR.
B01201177-S2
03/05/2026
Signed off — Alteration
INSTALL ONE (1) NEW STEAM BOILER IN THE CELLAR.
B01201177-I1
02/02/2026
Special inspection requirement — Tenant Protection Plan Compliance
ABDALLAH ELCHERBINI
02/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
01/29/2026
Filed — Alteration
INSTALL ONE (1) NEW STEAM BOILER IN THE CELLAR.
B01201177-P1
01/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
01/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/22/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/30/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/22/2025
Permit issued — Plumbing
B01201177-S1-PL
09/22/2025
Permit issued — Boiler Equipment
B01201177-S2-BE
09/19/2025
Permit issued — General Construction
B01255122-I1-GC
09/15/2025
Permit issued — Boiler Equipment
B01201177-I1-BE
09/05/2025
Filed — Alteration
FILING FOR MINOR INTERIOR CONSTRUCTION WORK AT CELLAR FL. ERECTING A FIRE RATED PARTITION FOR THE BOILER ROOM ONLY. WORK ALSO TO REMOVE ERECTED ONE STORY WOOD AND METAL STUD STRUCTURE AT REAR OF 2ND FL TO ADDRESS ECB# 39048421Y.
B01255122-P1
07/16/2025
Filed — Alteration
FILING FOR MINOR INTERIOR CONSTRUCTION WORK AT CELLAR FL. ERECTING A FIRE RATED PARTITION FOR THE BOILER ROOM ONLY. WORK ALSO TO REMOVE ERECTED ONE STORY WOOD AND METAL STUD STRUCTURE AT REAR OF 2ND FL TO ADDRESS ECB# 39048421Y.
B01255122-I1
05/07/2025
Violation issued (ECB, open)
Construction
05/07/2025
Violation issued (ECB, open)
Construction
04/23/2025
Filed — Alteration
INSTALL ONE (1) NEW STEAM BOILER IN THE CELLAR.
B01201177-S1
04/23/2025
Filed — Alteration
INSTALL ONE (1) NEW STEAM BOILER IN THE CELLAR.
B01201177-S2
04/23/2025
Filed — Alteration
INSTALL ONE (1) NEW STEAM BOILER IN THE CELLAR.
B01201177-I1
04/22/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
04/22/2025
Special inspection requirement — Maintenance information
Steven Bendoraitis
04/22/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
04/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
ABDALLAH ELCHERBINI
04/22/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
04/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
ABDALLAH ELCHERBINI
04/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
04/22/2025
Special inspection requirement — Heating Systems
ABDALLAH ELCHERBINI
04/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ABDALLAH ELCHERBINI
04/17/2025
Special inspection requirement — Heating Systems
ABDALLAH ELCHERBINI
04/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Bendoraitis
04/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
Steven Bendoraitis
04/17/2025
Special inspection requirement — Maintenance information
Steven Bendoraitis
04/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
Steven Bendoraitis
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/08/2022
Violation issued (HPD, open)
C
02/10/2022
Violation issued (ECB, open)
Construction
12/22/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/30/2021
Violation issued (ECB, open)
Construction
10/01/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/24/2008
Violation issued (ECB, open)
Boilers
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/24/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/24/2001
Violation issued (ECB, closed)
Construction
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHIPMENT DISTRIBUTOR CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KEMS ENGINEERING AND CONSTRUCTION401/29/2026
SKYPEAK LLC209/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INSHA BUILDING CONSULTANTS403/21/2026
LEWSAN CONSULTANTS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
K.H. WERBER PLBG CO INCPlumbing307/08/2026
WCK ELECTRIC CORP.Electrical103/22/2026
GREENER COUNTYGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC SPECIAL INSPECTIONS8355401/29/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offK.H. WERBER PLBG CO INC09/22/2025
DOB NOWBoiler EquipmentSigned-offK.H. WERBER PLBG CO INC09/22/2025
DOB NOWGeneral ConstructionPermit IssuedGREENER COUNTY.CONSTR INC09/19/2025
DOB NOWBoiler EquipmentSigned-offK.H. WERBER PLBG CO INC09/15/2025
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/26/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/22/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/30/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
02/02/2026Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
02/02/2026Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
01/27/2026Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
01/27/2026Tenant Protection Plan Compliance—special
04/22/2025HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
04/22/2025Maintenance informationSteven Bendoraitisenergy_progress
04/22/2025HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
04/22/2025Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
04/22/2025HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
04/22/2025Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
04/22/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
04/22/2025Heating SystemsABDALLAH ELCHERBINIspecial
04/17/2025Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
04/17/2025Heating SystemsABDALLAH ELCHERBINIspecial
04/17/2025HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
04/17/2025HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
04/17/2025Maintenance informationSteven Bendoraitisenergy_progress
04/17/2025HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026B01201177-S2Request digital key ↗
08/21/2026B01201177-P1Request digital key ↗
08/21/2026B01201177-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026B01201177-I1Open ↗
09/23/2026B01201177-S2Open ↗
09/23/2026B01201177-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026B01201177-S1Open ↗
08/21/2026B01255122-I1Open ↗
08/13/2026B01201177-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026B01201177-I1Open ↗
09/23/2026B01201177-S2Open ↗
09/02/2026B01201177-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/21/2026B01201177-S1Open ↗
08/13/2026B01201177-S2Open ↗
08/13/2026B01201177-P1Open ↗
Showing 3 of 4 on file for this type