← Back
Primarily 5-6 family with 1 store or office
7121 FT HAMILTON PARKWAY
BROOKLYN · BIN 3147024
💬 Discuss this project
1931Year Built
3Stories
S5Building Class
R6BZoning
5,100 sfGross Floor Area
6Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · Owner of record: 7121 FHP LLC · 2,094 sf lot · 2.44 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof4p · 1 filing · 3 docs
Floor 115p · 3 filings · 17 docs
Cellar8p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
7121 FHP LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RS DESIGN ASSOCIATES, INC.311/29/2022
SOHAIL HUMAYUN P E INC311/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RS DESIGN ASSOCIATES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EQUEST BUILDERS CORPGeneral Contractor303/21/2026
GLOBAL LUXURY SRVCS INCGeneral Contractor307/08/2026
JOE PARZIALE PLUMBING COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASHRAF CORPORATION1973102/23/2022
Building Lifecycle
All (40)Filed (6)Permit Issued (4)Violation (18)Inspection (6)Special Inspection (6)
04/15/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/01/2025
Violation issued (HPD, closed)
C
12/01/2025
Violation issued (HPD, open)
B
12/01/2025
Violation issued (HPD, open)
A
12/01/2025
Violation issued (HPD, open)
A
12/01/2025
Violation issued (HPD, open)
A
04/10/2024
Violation issued (HPD, closed)
A
11/29/2022
Filed — Alteration
Amend plan to show as built condition at bathroom , bar and kitchen areas
B00590552-P2
11/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
11/28/2022
Special inspection requirement — Interior lighting power
ERROL CRAWFORD
11/10/2022
Violation issued (HPD, closed)
I
11/04/2022
Filed — Alteration
APPLICATION FILED TO INSTALL NEW PLUMBING FIXTURES, GAS EQUIPMENT AND PIPING IN CONJUNCTION WITH ALT 2 JOB #B00590552. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00679659-P1
11/04/2022
Special inspection requirement — Energy Code Compliance Inspections
SOHAIL HUMAYUN
10/30/2022
Special inspection requirement — Energy Code Compliance Inspections
SOHAIL HUMAYUN
09/06/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/25/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/22/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/13/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/14/2022
Permit issued — Mechanical Systems
B00684651-I1-MS
03/24/2022
Permit issued — Plumbing
B00679659-I1-PL
03/03/2022
Permit issued — Mechanical Systems
B00684651-I1-MS
02/24/2022
Violation issued (HPD, closed)
A
02/23/2022
Filed — Alteration
APPLICATION FILED TO INSTALL NEW KITCHEN EXHAUST SYSTEM, INCLUDING HOOD, EXHAUST FAN AND ASSOCIATED DUCTWORK. NEW SPLIT AC FOR HEATING AND COOLING. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00684651-I1
02/22/2022
Filed — Alteration
APPLICATION FILED TO INSTALL NEW PLUMBING FIXTURES, GAS EQUIPMENT AND PIPING IN CONJUNCTION WITH ALT 2 JOB #B00590552. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00679659-I1
01/06/2022
Filed — Alteration
Amend plan to show as built condition at bathroom , bar and kitchen areas
B00590552-P1
12/15/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/15/2021
Special inspection requirement — Interior lighting power
ERROL CRAWFORD
10/20/2021
Permit issued — General Construction
B00590552-I1-GC
09/20/2021
Filed — Alteration
Amend plan to show as built condition at bathroom , bar and kitchen areas
B00590552-I1
04/09/2021
Violation issued (HPD, closed)
A
04/09/2021
Violation issued (HPD, closed)
I
10/30/2019
Violation issued (HPD, closed)
I
11/22/2017
Violation issued (HPD, closed)
I
10/09/2015
Violation issued (HPD, closed)
I
02/01/2008
Violation issued (ECB, closed)
Boilers
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/1992
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedGLOBAL LUXURY SRVCS04/14/2022
DOB NOWPlumbingPermit IssuedJOE PARZIALE PLUMBING CO03/24/2022
DOB NOWMechanical SystemsPermit IssuedGLOBAL LUXURY SRVCS03/03/2022
DOB NOWGeneral ConstructionPermit IssuedEQUEST BUILDERS CORP10/20/2021
BISFPISSUEDALL BORO FIRE & SAFETY EQUIP09/27/2000
1 job · most recent 02/23/2022
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
02/23/2022Permit IssuedGLOBAL LUXURY SRVCS INCAir Conditioning Systems, Ventilation Systems
Ventilation
Captiveaire INLINE 3-24D 3,000 CFM · Makeup Air ×1
1 job · most recent 11/04/2022
Gas Water/Sanitary
FiledStatusContractorScope
11/04/2022Permit IssuedJOE PARZIALE PLUMBING COGas, Water/Sanitary
1 job · most recent 02/26/2022
General Wiring
FiledStatusContractorScope
02/26/2022CompleteNYCO ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/15/2026Pass-Final General Construction Non-Directive 14PassView ↗
09/06/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/22/2022Fail-Final General Construction Non-Directive 14FailView ↗
05/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
11/28/2022Fire-Resistant Penetrations and Joints—special
11/28/2022Interior lighting powerERROL CRAWFORDenergy_progress
11/04/2022Energy Code Compliance InspectionsSOHAIL HUMAYUNprogress
10/30/2022Energy Code Compliance InspectionsSOHAIL HUMAYUNprogress
12/15/2021Fire-Resistant Penetrations and Joints—special
12/15/2021Interior lighting powerERROL CRAWFORDenergy_progress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/31/2026B00590552-I1Request digital key ↗
08/31/2026B00590552-P1Request digital key ↗
08/31/2026B00590552-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/31/2026B00590552-P2Open ↗
08/31/2026B00590552-I1Open ↗
08/31/2026B00590552-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/30/2026B00679659-P1Open ↗
08/27/2026B00679659-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026B00679659-P1Open ↗
08/13/2026B00679659-I1Open ↗
08/13/2026B00684651-I1Open ↗