← Back
Multi-story retail building (2+)
7518 3 AVENUE
BROOKLYN · BIN 3148684
💬 Discuss this project
1930Year Built
3Stories
K2Building Class
R6BZoning
2,970 sfGross Floor Area
2Units
Multi-story retail building (2+) · Owner of record: 7518 3RD AVENUE LLC · 1,440 sf lot · 2.06 FAR built · Flood zone X
Locations of Work
Architecture
Floor 314p · 1 filing · 20 docs
Floor 213p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar14p · 1 filing · 20 docs
3 jobs · most recent 06/05/2025
General Wiring
FiledStatusContractorScope
06/05/2025Permit IssuedLIMITLESS ELECT RESOURCES—
02/25/2025CompleteP & Z ELECTRIC CORPGeneral Wiring
05/14/2024CompleteJ.H. ELEC. OF NEW YORK INGeneral Wiring
Building Lifecycle
All (38)Filed (6)Permit Issued (5)Signed Off (2)Inspection (2)Objection (6)Special Inspection (17)
12/10/2025
Signed off — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (SPEAR)
B01176957-I1
05/30/2025
Permit issued — Sign
B01176957-I1-SG
05/29/2025
Filed — Alteration
INSTALL EXTERIOR ILLUMINATED WALL SIGN (SPEAR)
B01176957-I1
02/05/2025
Special inspection requirement — Final
LEON SKVIRSKY
01/10/2025
Signed off — Alteration
B01144659-I1
12/18/2024
Permit issued — General Construction
B01144659-I1-GC
12/10/2024
Filed — Alteration
B01144659-I1
08/29/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
08/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
08/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
08/29/2024
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
08/23/2024
Objection resolved — Addressed
08/23/2024
Objection resolved — Addressed
08/21/2024
Objection raised — Other
08/21/2024
Objection raised — Scope
08/19/2024
Filed — Alteration CO
INTERIOR RENOVATION OF AN EXISTING 3-STORY BUILDING WITH CELLAR, CONVERSION FROM A STORE AND 2 DWELLING TO OFFICES. REMOVE/INSTALL PARTITIONS AND CAP/REMOVE AND INSTALL PLUMBING AS PER PLANS.
B00826079-P3
08/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
08/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
08/13/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
08/13/2024
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
07/09/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/23/2024
Filed — Alteration CO
INTERIOR RENOVATION OF AN EXISTING 3-STORY BUILDING WITH CELLAR, CONVERSION FROM A STORE AND 2 DWELLING TO OFFICES. REMOVE/INSTALL PARTITIONS AND CAP/REMOVE AND INSTALL PLUMBING AS PER PLANS.
B00826079-P2
06/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
06/23/2024
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
06/23/2024
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
06/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
06/14/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/01/2024
Permit issued — General Construction
B00826079-I1-GC
10/03/2023
Objection raised — Other
10/03/2023
Objection resolved — Addressed
10/02/2023
Filed — Alteration CO
INTERIOR RENOVATION OF AN EXISTING 3-STORY BUILDING WITH CELLAR, CONVERSION FROM A STORE AND 2 DWELLING TO OFFICES. REMOVE/INSTALL PARTITIONS AND CAP/REMOVE AND INSTALL PLUMBING AS PER PLANS.
B00826079-P1
09/25/2023
Special inspection requirement — Interior lighting power
CHRISTIAN LOZADA
09/25/2023
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
09/25/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRISTIAN LOZADA
09/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
08/03/2023
Permit issued — General Construction
B00826079-I1-GC
07/12/2023
Permit issued — General Construction
B00826079-I1-GC
02/24/2023
Filed — Alteration CO
INTERIOR RENOVATION OF AN EXISTING 3-STORY BUILDING WITH CELLAR, CONVERSION FROM A STORE AND 2 DWELLING TO OFFICES. REMOVE/INSTALL PARTITIONS AND CAP/REMOVE AND INSTALL PLUMBING AS PER PLANS.
B00826079-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SPEAR PHYSICAL THERAPY607/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/30/2024$1.6M—DANIEL O. REICH LIVNG TRUST DATED 8/13/2015 → 7518 3RD AVENUE LLC$539/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEON SKVIRSKY PE105/29/2025
SPIVAK ARCHITECTS P.C.112/10/2024
CL ENGINEERING P.C.408/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EL CHOUM CONSULTING803/21/2026
A1 EXPEDITING SERVICE CORP.103/21/2026
BUILDING BROTHERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ECOSTRUCT LLCGeneral Contractor507/08/2026
P & Z ELECTRIC CORPElectrical103/22/2026
LW INTERIOR REMODELING INGeneral Contractor107/08/2026
PAUL SIGNSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATALPA SPECIAL INSPECTIO2004112/10/2024
CL ENGINEERING P.C.6781408/19/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offPAUL SIGNS, INC05/30/2025
DOB NOWGeneral ConstructionSigned-offLW INTERIOR REMODELING IN12/18/2024
DOB NOWGeneral ConstructionPermit IssuedECOSTRUCT LLC05/01/2024
DOB NOWGeneral ConstructionPermit IssuedECOSTRUCT LLC08/03/2023
DOB NOWGeneral ConstructionPermit IssuedECOSTRUCT LLC07/12/2023
BISOTISSUEDLAKHI GENERAL CONTRACTOR,INC.10/21/1996
BISFPISSUEDGEBHARDT INC.04/17/1995
BISFPISSUEDGEBHARDT INC.05/07/1992
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/14/2024Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
02/05/2025FinalLEON SKVIRSKYprogress
08/29/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
08/29/2024Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
08/29/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
08/29/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
08/13/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
08/13/2024Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
08/13/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
08/13/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
06/23/2024Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
06/23/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
06/23/2024Interior lighting powerCHRISTIAN LOZADAenergy_progress
06/23/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
09/25/2023Interior lighting powerCHRISTIAN LOZADAenergy_progress
09/25/2023Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
09/25/2023Structural Stability – Alterations of existing buildingsCHRISTIAN LOZADAspecial
09/25/2023Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026B00826079-P2Request digital key ↗
08/24/2026B00826079-I1Request digital key ↗
08/23/2026B01144659-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
09/20/2022300138349Open ↗
09/20/2022300409074Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00826079-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature9
09/05/2026B00826079-P1Open ↗
09/05/2026B00826079-P1Open ↗
08/26/2026B00826079-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/05/2026B00826079-P1Open ↗
09/05/2026B00826079-P1Open ↗
08/26/2026B00826079-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026B00826079-P3Open ↗
08/24/2026B00826079-P2Open ↗
08/24/2026B00826079-P1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/24/2026B00826079-I1Open ↗
08/24/2026B00826079-P2Open ↗
08/15/2026B00826079-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026B00826079-I1Open ↗
08/24/2026B00826079-P2Open ↗
08/23/2026B01144659-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents9
▸DOB NOWSupporting Document4
08/13/2026B00826079-I1Open ↗
08/13/2026B00826079-P3Open ↗
08/13/2026B00826079-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/24/2026B00826079-P2Open ↗
08/24/2026B00826079-I1Open ↗
08/15/2026B00826079-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B00826079-I1Open ↗