← Back
Two family brick
529 79 STREET
BROOKLYN · BIN 3150448
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R4-1Zoning
2,340 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family brick · 2,475 sf lot · 0.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction27p · 1 filing · 20 docs
Floor 1Under Construction27p · 1 filing · 20 docs
CellarUnder Construction28p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GENGRIC DESIGN103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HC ARCHITECT, PC708/22/2026
STEEL CORE ENGINEERING PLLC211/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ALISTAS SERVICES403/21/2026
CH CORNERSTONE DESIGN403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GENGRIC DESIGN LLCGeneral Contractor907/08/2026
COPPER PLUMBING INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BEYOND ARCH LLC3600403/27/2026
JEON CONSULTING5119211/28/2025
Nothing on file for this building.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedGENGRIC DESIGN LLC05/12/2026
DOB NOWStructuralPermit IssuedGENGRIC DESIGN LLC05/12/2026
DOB NOWMechanical SystemsPermit IssuedGENGRIC DESIGN LLC05/12/2026
DOB NOWPlumbingPermit IssuedCOPPER MECHANICAL INC02/17/2026
DOB NOWStructuralPermit IssuedGENGRIC DESIGN10/27/2025
DOB NOWPlumbingPermit IssuedCOPPER MECHANICAL INC06/09/2025
DOB NOWStructuralPermit IssuedGENGRIC DESIGN05/14/2025
DOB NOWMechanical SystemsPermit IssuedGENGRIC DESIGN05/14/2025
DOB NOWGeneral ConstructionPermit IssuedGENGRIC DESIGN05/14/2025
1 project · most recent 08/22/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/22/2026Permit IssuedCOPPER MECHANICAL INCGas, Water/Sanitary
1 project · most recent 06/05/2025
General Wiring
FiledStatusContractorScope
06/05/2025Permit IssuedACCURATE ELEC'L CORP.General Wiring
1 project · most recent 08/22/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
08/22/2026Permit IssuedGENGRIC DESIGN LLCSteel, Concrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/17/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/14/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/11/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/18/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
08/20/2026HVAC-R and service water heating equipmentHackjong Choienergy_progress
08/20/2026HVAC-R and service water piping design and insulationHackjong Choienergy_progress
08/20/2026HVAC-R and service water heating system controlsHackjong Choienergy_progress
05/22/2026Energy Code Compliance InspectionsHackjong Choiprogress
05/22/2026Fire-Resistance Rated ConstructionHackjong Choiprogress
05/22/2026FinalTae Chongprogress
05/22/2026Structural Steel - DetailsHackjong Choispecial
05/22/2026Fenestration and door U-factor and product ratingsHackjong Choienergy_progress
05/22/2026Fenestration areasHackjong Choienergy_progress
05/22/2026Interior lighting powerHackjong Choienergy_progress
05/22/2026Fire-Resistant Penetrations and JointsHackjong Choispecial
05/22/2026Structural Stability – Alterations of existing buildingsHackjong Choispecial
03/24/2026HVAC-R and service water heating system controlsHackjong Choienergy_progress
03/24/2026HVAC-R and service water piping design and insulationHackjong Choienergy_progress
03/24/2026HVAC-R and service water heating equipmentHackjong Choienergy_progress
02/12/2026Structural Steel - DetailsBENJAMIN JEONspecial
02/12/2026Structural Wood FrameBENJAMIN JEONprogress
02/12/2026FinalBENJAMIN JEONprogress
02/12/2026MasonryBENJAMIN JEONspecial
02/12/2026Structural Stability – Alterations of existing buildingsBENJAMIN JEONspecial
02/12/2026Concrete - Cast-In-PlaceBENJAMIN JEONspecial
02/19/2025HVAC-R and service water heating system controlsHackjong Choienergy_progress
02/19/2025HVAC-R and service water piping design and insulationHackjong Choienergy_progress
02/19/2025HVAC-R and service water heating equipmentHackjong Choienergy_progress
02/19/2025Mechanical SystemsHackjong Choispecial
Latest 25 of 27.
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/17/2026B01175072-S2Request digital key ↗
08/17/2026B01175072-S1Request digital key ↗
08/17/2026B01175072-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWRestrictive Declaration/Easement 15
08/17/2026B01175072-P3Open ↗
08/15/2026B01175072-P4Open ↗
08/13/2026B01175072-P2Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/17/2026B01175072-P3Open ↗
08/17/2026B01175072-S1Open ↗
08/17/2026B01175072-P4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026B01175072-P5Open ↗
09/01/2026B01175072-S3Open ↗
08/29/2026B01175072-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B01175072-S3Open ↗
08/29/2026B01175072-I1Open ↗
08/24/2026B01175072-S2Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/17/2026B01175072-P2Open ↗
08/17/2026B01175072-S1Open ↗
08/17/2026B01175072-P3Open ↗
Showing 3 of 8 on file for this type