← Back
Two family brick
511 79 STREET
BROOKLYN · BIN 3150454
💬 Discuss this project
1925Year Built
2Stories
B1Building Class
R4-1Zoning
2,340 sfGross Floor Area
2Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Two family brick · Owner of record: WONDER 511 INC. · 2,800 sf lot · 0.84 FAR built · Flood zone X
Locations of Work
Architecture
Floor 22p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Basement5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
T C DESIGN1209/12/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/28/2025$2.3M—Private party → WONDER 511 INC.$972/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP503/27/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY BUILDING ASSOCIATES INGeneral Contractor104/09/2026
SAFEPIPE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC DESIGN INC9758503/27/2026
Building Lifecycle
All (45)Filed (5)Permit Issued (2)Signed Off (2)Violation (13)Inspection (4)Special Inspection (19)
05/01/2026
Violation issued (HPD, open)
A
04/15/2026
Signed off — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01280076-S1
03/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
03/30/2026
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
03/27/2026
Filed — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01280076-P3
03/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
03/19/2026
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
02/20/2026
Signed off — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01280076-I1
01/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/08/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
12/08/2025
Special inspection requirement — Air barrier - visual inspection
Eric Sun
12/08/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Eric Sun
12/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
12/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
12/08/2025
Special inspection requirement — Mechanical Systems
Eric Sun
12/08/2025
Special inspection requirement — Metering
Eric Sun
12/08/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
12/08/2025
Special inspection requirement — Interior lighting power
Eric Sun
12/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
12/08/2025
Special inspection requirement — Fenestration areas
Eric Sun
12/08/2025
Special inspection requirement — Fenestration air leakage
Eric Sun
12/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
12/08/2025
Special inspection requirement — Final
Eric Sun
12/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
12/05/2025
Filed — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01280076-P1
12/05/2025
Filed — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01280076-P2
12/02/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
11/18/2025
Violation issued (HPD, closed)
I
09/18/2025
Permit issued — Plumbing
B01280076-S1-PL
09/18/2025
Permit issued — Mechanical Systems
B01280076-I1-GC-CX
09/16/2025
Filed — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01280076-S1
09/16/2025
Filed — Alteration
REMOVE & CAP OF EXISTING GAS & PLUMBING FIXTURE. INSTALLATION & REPLACEMENT OF NEW BOILER, H.W.H., GAS & PLUMBING FIXTURES IN EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01280076-I1
04/08/2024
Violation issued (HPD, closed)
A
03/21/2023
Violation issued (HPD, closed)
A
02/22/2022
Violation issued (HPD, closed)
A
04/07/2021
Violation issued (HPD, closed)
A
10/29/2019
Violation issued (HPD, closed)
I
10/15/2018
Violation issued (HPD, closed)
I
11/17/2017
Violation issued (HPD, closed)
I
11/03/2016
Violation issued (HPD, closed)
I
02/17/2015
Violation issued (HPD, closed)
I
01/26/2009
Violation issued (ECB, closed)
Plumbing
11/01/1990
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBELLEROSE PLBG & HTG09/18/2025
DOB NOWMechanical SystemsSigned-offNY BUILDING ASSOCIATES IN09/18/2025
BISPLISSUEDEP PLUMBING03/16/1993
BIS—ISSUEDAJECT CONSTRUCTION CORP.01/19/1993
1 project · most recent 05/26/2026
General Wiring
FiledStatusContractorScope
05/26/2026CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
03/30/2026Fire-Resistant Penetrations and JointsEric Sunspecial
03/30/2026Energy Code Compliance InspectionsEric Sunprogress
03/19/2026Fire-Resistant Penetrations and JointsEric Sunspecial
03/19/2026Energy Code Compliance InspectionsEric Sunprogress
12/08/2025Fire-Resistance Rated ConstructionEric Sunprogress
12/08/2025Air barrier - visual inspectionEric Sunenergy_progress
12/08/2025Fenestration and door U-factor and product ratingsEric Sunenergy_progress
12/08/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
12/08/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
12/08/2025Mechanical SystemsEric Sunspecial
12/08/2025MeteringEric Sunenergy_progress
12/08/2025Insulation placement and R valuesEric Sunenergy_progress
12/08/2025Interior lighting powerEric Sunenergy_progress
12/08/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
12/08/2025Fenestration areasEric Sunenergy_progress
12/08/2025Fenestration air leakageEric Sunenergy_progress
12/08/2025Fire-Resistant Penetrations and JointsEric Sunspecial
12/08/2025FinalEric Sunprogress
12/08/2025Energy Code Compliance InspectionsEric Sunprogress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026B01280076-P3Request digital key ↗
08/17/2026B01280076-S1Request digital key ↗
08/17/2026B01280076-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026B01280076-P3Open ↗
08/17/2026B01280076-I1Open ↗
08/17/2026B01280076-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026B01280076-I1Open ↗
09/23/2026B01280076-I1Open ↗
09/01/2026B01280076-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026B01280076-I1Open ↗
09/01/2026B01280076-P3Open ↗
09/01/2026B01280076-S1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/20/2026B01280076-P3Open ↗
08/17/2026B01280076-I1Open ↗
08/17/2026B01280076-P1Open ↗
Showing 3 of 5 on file for this type