← Back
Three families
529 80 STREET
BROOKLYN · BIN 3150998
💬 Discuss this project
1920Year Built
3Stories
C0Building Class
R4-1Zoning
2,868 sfGross Floor Area
3Units
Rent Stabilized55 Open Violations 49 unresolved · 6 paperwork only ▸FDNY Report ↗
Three families · Owner of record: 529 SQUARE LLC · 1,967 sf lot · 1.46 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar3p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BASIC GROUPS CORP703/22/2026
529 SQUARE LLC1503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
G. SWITZER ARCHITECTURE, PC (GSAPC)109/25/2025
NIC 88 CORP201/06/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371201/06/2023
Building Lifecycle
All (74)Filed (3)Permit Issued (1)Signed Off (1)Violation (60)Inspection (2)Objection (6)Special Inspection (1)
05/01/2026
Violation issued (HPD, open)
A
03/09/2026
Violation issued (HPD, open)
B
03/09/2026
Violation issued (HPD, open)
C
03/09/2026
Violation issued (HPD, closed)
C
11/18/2025
Violation issued (HPD, open)
I
10/07/2025
Objection raised — Cost
10/07/2025
Objection resolved — Addressed
10/07/2025
Objection resolved — Addressed
10/01/2025
Objection raised — Other
09/29/2025
Objection resolved — Addressed
09/26/2025
Objection raised — Zoning
09/25/2025
Filed — Alteration
B01288787-I1
09/24/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/06/2025
Violation issued (HPD, open)
A
06/04/2025
Violation issued (ECB, open)
Construction
06/03/2025
Violation issued (ECB, open)
Construction
06/03/2025
Violation issued (ECB, open)
Construction
06/02/2025
Violation issued (ECB, closed)
Construction
04/23/2025
Violation issued (HPD, open)
A
04/23/2025
Violation issued (HPD, open)
B
04/23/2025
Violation issued (HPD, closed)
C
04/23/2025
Violation issued (HPD, closed)
C
04/23/2025
Violation issued (HPD, closed)
C
04/23/2025
Violation issued (HPD, open)
A
04/23/2025
Violation issued (HPD, open)
A
04/23/2025
Violation issued (HPD, open)
A
04/23/2025
Violation issued (HPD, open)
B
04/23/2025
Violation issued (HPD, open)
B
04/23/2025
Violation issued (HPD, open)
B
04/23/2025
Violation issued (HPD, open)
A
04/23/2025
Violation issued (HPD, open)
B
12/19/2024
Violation issued (ECB, open)
Construction
12/19/2024
Violation issued (ECB, open)
Construction
12/19/2024
Violation issued (ECB, open)
Construction
11/26/2024
Violation issued (HPD, open)
I
06/05/2024
Violation issued (HPD, open)
B
04/08/2024
Violation issued (HPD, open)
A
11/17/2023
Violation issued (HPD, open)
I
05/16/2023
Signed off — Alteration
CAP AND REMOVE EXISTING BOILER IN CELLAR OF EXISTING 3 STORY BUILDING; INSTALL 4 NEW BOILERS AND 2 H.W.H. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00758087-I1
03/21/2023
Violation issued (HPD, open)
A
02/24/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/23/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/06/2023
Filed — Alteration
CAP AND REMOVE EXISTING BOILER IN CELLAR OF EXISTING 3 STORY BUILDING; INSTALL 4 NEW BOILERS AND 2 H.W.H. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00758087-P1
11/07/2022
Violation issued (HPD, open)
I
06/21/2022
Permit issued — Plumbing
B00758087-I1-PL
06/15/2022
Filed — Alteration
CAP AND REMOVE EXISTING BOILER IN CELLAR OF EXISTING 3 STORY BUILDING; INSTALL 4 NEW BOILERS AND 2 H.W.H. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B00758087-I1
02/22/2022
Violation issued (HPD, open)
I
02/22/2022
Violation issued (HPD, open)
A
04/07/2021
Violation issued (HPD, open)
I
04/07/2021
Violation issued (HPD, open)
A
02/26/2020
Violation issued (ECB, closed)
Construction
02/26/2020
Violation issued (ECB, closed)
Quality of Life
02/26/2020
Violation issued (ECB, closed)
Quality of Life
02/26/2020
Violation issued (ECB, closed)
Construction
02/26/2020
Violation issued (ECB, closed)
Construction
02/26/2020
Violation issued (ECB, closed)
Quality of Life
02/26/2020
Violation issued (ECB, closed)
Construction
10/29/2019
Violation issued (HPD, open)
I
10/15/2018
Violation issued (HPD, open)
I
11/17/2017
Violation issued (HPD, closed)
I
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC06/21/2022
1 project · most recent 02/19/2025
General Wiring
FiledStatusContractorScope
02/19/2025CompleteHI-RITE ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/24/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
09/24/2025Tenant Protection Plan Compliance—special
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/28/2026B00758087-I1Request digital key ↗
08/28/2026B00758087-P1Request digital key ↗
08/14/2026B01288787-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026B00758087-I1Open ↗
08/28/2026B00758087-P1Open ↗
08/13/2026B01288787-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026B00758087-P1Open ↗
08/28/2026B00758087-I1Open ↗