8001 6 AVENUE
BROOKLYN · BIN 3151422
💬 Discuss this project
1931Year Built
3Stories
C1Building Class
R5BZoning
6,150 sfGross Floor Area
9Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: GABRIELLA, ANTONELLA & DANIELA OSSO IRRE V TRUST · 2,596 sf lot · 2.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Permit Issued — active, not yet Signed-off
Floor 33p · 1 filing · 20 docs
Floor 23p · 1 filing · 20 docs
Floor 1Under Construction11p · 3 filings · 20 docs
CellarUnder Construction12p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GABRIELLA, ANTONELLA & DANIELA OSSO IRRE V TRUST103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BUILDING STUDIO ARCHITECTS503/12/2026
GREGG ROTHSTEIN ARCHITECT109/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREGG ROTHSTEIN ARCHITECT503/21/2026
WILLOUGHBY CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BLUESTONE CONSTRUCTION ANGeneral Contractor303/21/2026
OSSO PLUMBING & HEATINGPlumbing207/19/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN SPECIAL ENGINEERING2018303/12/2026
Building Lifecycle
All (92)Filed (6)Permit Issued (3)Violation (55)Inspection (14)Objection (5)Special Inspection (9)
07/31/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/28/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/28/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/24/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/17/2026
Permit issued — Plumbing
B12603892-S1-PL
04/15/2026
Objection raised — Cost
04/10/2026
Objection resolved — Addressed
04/09/2026
Objection raised — Scope
03/26/2026
Objection resolved — Addressed
03/18/2026
Objection raised — Scope
03/12/2026
Filed — Alteration CO
REMODEL AND RECONFIGURE APT 1B & 1C ON THE FIRST FLOOR. REMODEL APT 1A ON THE FIRST FLOOR AND CREATE ACCESORY ROOM IN THE CELLAR CONNECTED TO APT 1A ABOVE. CREATE ACCESORY TENANTS LAUNDRY AT THE CELLAR LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00954225-P1
03/12/2026
Filed — Alteration CO
REMODEL AND RECONFIGURE APT 1B & 1C ON THE FIRST FLOOR. REMODEL APT 1A ON THE FIRST FLOOR AND CREATE ACCESORY ROOM IN THE CELLAR CONNECTED TO APT 1A ABOVE. CREATE ACCESORY TENANTS LAUNDRY AT THE CELLAR LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00954225-P2
03/12/2026
Filed — Alteration CO
REMODEL AND RECONFIGURE APT 1B & 1C ON THE FIRST FLOOR. REMODEL APT 1A ON THE FIRST FLOOR AND CREATE ACCESORY ROOM IN THE CELLAR CONNECTED TO APT 1A ABOVE. CREATE ACCESORY TENANTS LAUNDRY AT THE CELLAR LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00954225-S2
03/11/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/11/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
03/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/11/2026
Special inspection requirement — Mechanical Systems
03/11/2026
Special inspection requirement — Final
03/10/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
12/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/08/2025
Violation issued (HPD, closed)
B
10/08/2025
Violation issued (HPD, closed)
B
10/08/2025
Violation issued (HPD, closed)
B
10/08/2025
Violation issued (HPD, closed)
B
10/08/2025
Violation issued (HPD, closed)
B
10/08/2025
Violation issued (HPD, closed)
B
10/08/2025
Violation issued (HPD, closed)
B
10/08/2025
Violation issued (HPD, closed)
B
10/08/2025
Violation issued (HPD, closed)
C
09/27/2025
Violation issued (HPD, closed)
B
09/27/2025
Violation issued (HPD, open)
C
09/27/2025
Violation issued (HPD, closed)
B
09/27/2025
Violation issued (HPD, closed)
B
09/27/2025
Violation issued (HPD, closed)
B
09/27/2025
Violation issued (HPD, closed)
B
09/27/2025
Violation issued (HPD, closed)
B
09/27/2025
Violation issued (HPD, open)
C
09/27/2025
Violation issued (HPD, closed)
B
09/27/2025
Violation issued (HPD, closed)
B
06/05/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/23/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/06/2025
Permit issued — Plumbing
B00954225-S1-PL
12/04/2024
Filed — Alteration CO
REMODEL AND RECONFIGURE APT 1B & 1C ON THE FIRST FLOOR. REMODEL APT 1A ON THE FIRST FLOOR AND CREATE ACCESORY ROOM IN THE CELLAR CONNECTED TO APT 1A ABOVE. CREATE ACCESORY TENANTS LAUNDRY AT THE CELLAR LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00954225-S1
08/23/2024
Permit issued — General Construction
B00954225-I1-GC
11/15/2023
Filed — Alteration CO
REMODEL AND RECONFIGURE APT 1B & 1C ON THE FIRST FLOOR. REMODEL APT 1A ON THE FIRST FLOOR AND CREATE ACCESORY ROOM IN THE CELLAR CONNECTED TO APT 1A ABOVE. CREATE ACCESORY TENANTS LAUNDRY AT THE CELLAR LEVEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00954225-I1
09/07/2023
Filed — Alteration
B00925161-I1
03/20/2023
Violation issued (HPD, closed)
A
07/29/2022
Violation issued (HPD, closed)
A
07/29/2022
Violation issued (HPD, open)
C
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMC SUPERSTRUCTURE INC07/17/2026
DOB NOWPlumbingPermit IssuedOSSO PLUMBING & HEATING02/06/2025
DOB NOWGeneral ConstructionPermit IssuedBLUESTONE CONSTRUCTION AN08/23/2024
1 project · most recent 03/12/2026
FiledStatusContractorScope
03/12/2026——2 heads
1 project · most recent 03/12/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
03/12/2026Permit IssuedOSSO PLUMBING & HEATINGGas, Plumbing-Sprinkler, Water/Sanitary
2 projects · most recent 01/04/2026
General Wiring
FiledStatusContractorScope
01/04/2026CompleteHAC ELECTRIC INCGeneral Wiring
07/25/2025CompleteHAC ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
07/31/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/28/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/28/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/24/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
03/11/2026HVAC-R and service water heating equipment—energy_progress
03/11/2026HVAC-R and service water heating system controls—energy_progress
03/11/2026HVAC-R and service water piping design and insulation—energy_progress
03/11/2026Tenant Protection Plan Compliance—special
03/11/2026Structural Stability – Alterations of existing buildings—special
03/11/2026Mechanical Systems—special
03/11/2026Final—progress
03/10/2026Tenant Protection Plan Compliance—special
01/29/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026B00925161-I1Request digital key ↗
08/18/2026B00954225-S1Request digital key ↗
08/18/2026B00954225-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026B00925161-I1Open ↗
08/13/2026B00954225-P1Open ↗
08/13/2026B00954225-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026B00954225-P1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/18/2026B00954225-S2Open ↗
08/13/2026B00954225-S2Open ↗
08/13/2026B00954225-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/18/2026B00954225-I1Open ↗
08/13/2026B00954225-S2Open ↗
08/13/2026B00954225-P1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/13/2026B00954225-I1Open ↗
08/13/2026B00954225-P1Open ↗