← Back
Office only, 2-6 stories
8225 3 AVENUE
BROOKLYN · BIN 3152061
💬 Discuss this project
1941Year Built
2Stories
O2Building Class
R6BZoning
3,040 sfGross Floor Area
1Units
4 Open Violations ▸FDNY Report ↗
Office only, 2-6 stories · Owner of record: 8225 THIRD AVENUE LLC · 2,000 sf lot · 1.52 FAR built · Flood zone X
Locations of Work
Plumbing
Basement1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
8225 THIRD AVENUE LLC203/22/2026
MCLAUGHING SON INC103/22/2026
MCLAUGHLIN&SONS INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEON SKVIRSKY PE106/04/2021
GAMILL ENGINEERING, P.C202/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GAMILL ENGINEERING, PC403/21/2026
BUILDING BROTHERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R.G.M. SIGNS INCGeneral Contractor303/21/2026
FIREBALL PIPING HTG CORGeneral Contractor203/22/2026
FIREBALL PIPING & HTG CORPPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GAMILL ENGINEERING, P.C.1773102/08/2021
Building Lifecycle
All (44)Filed (3)Permit Issued (1)Signed Off (3)Violation (32)Special Inspection (5)
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/26/2022
Signed off — Alteration
B00515838-I1
09/20/2021
Signed off — Alteration
INSTALLATION OF NEW DUNKIRK 112,500 BTU STEAM BOILER IN EXISTING MIXED USE BUILDING.IN ORDER TO CURE VIOLATION #32075709M & 32075710J, FOR WORK WITHOUT A PERMIT AND FAILURE TO MAINTAIN BOILER.
B00448106-I1
09/09/2021
Signed off — Alteration
B00448336-I1
06/09/2021
Permit issued — General Construction
B00515838-I1-GC
06/04/2021
Filed — Alteration
B00515838-I1
02/08/2021
Filed — Alteration
INSTALLATION OF NEW DUNKIRK 112,500 BTU STEAM BOILER IN EXISTING MIXED USE BUILDING.IN ORDER TO CURE VIOLATION #32075709M & 32075710J, FOR WORK WITHOUT A PERMIT AND FAILURE TO MAINTAIN BOILER.
B00448106-I1
02/08/2021
Filed — Alteration
B00448336-I1
01/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GAMILL
01/06/2021
Special inspection requirement — Heating Systems
JACK GAMILL
01/06/2021
Special inspection requirement — HVAC-R and service water heating equipment
JACK GAMILL
01/06/2021
Special inspection requirement — Maintenance information
JACK GAMILL
01/06/2021
Special inspection requirement — HVAC-R and service water heating system controls
JACK GAMILL
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/02/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/10/2015
Violation issued (ECB, closed)
Boilers
09/10/2015
Violation issued (ECB, closed)
Construction
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/09/2001
Violation issued (ECB, closed)
Plumbing
05/09/2001
Violation issued (ECB, closed)
Plumbing
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/25/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offR.G.M. SIGNS INC06/09/2021
BISPLISSUEDFIREBALL PIPING & HTG CORP03/21/2012
BISPLISSUEDFIREBALL PIPING & HTG CORP01/21/2009
BISOTISSUEDMVJ INC06/09/2008
BISOTISSUEDA & W CERTIFIED COOLING SYSTEMS06/17/1996
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
01/06/2021Fire-Resistant Penetrations and JointsJACK GAMILLspecial
01/06/2021Heating SystemsJACK GAMILLspecial
01/06/2021HVAC-R and service water heating equipmentJACK GAMILLenergy_progress
01/06/2021Maintenance informationJACK GAMILLenergy_progress
01/06/2021HVAC-R and service water heating system controlsJACK GAMILLenergy_progress
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/01/2026B00448106-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
09/01/2026B00515838-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/01/2026B00448336-I1Request digital key ↗
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION3
03/28/2012310145429Open ↗
01/21/2009310145429Open ↗
06/09/2008310145429Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
10/15/2008310145429Open ↗
06/02/2008310145429Open ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026B00448106-I1Open ↗
08/26/2026B00448106-I1Open ↗
08/26/2026B00448106-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00448336-I1Open ↗
09/01/2026B00448106-I1Open ↗
09/01/2026B00515838-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
05/05/2014310145429Open ↗
06/02/2008310145429Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B00448106-I1Open ↗
08/26/2026B00448106-I1Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE4
04/27/2012310145429Open ↗
04/27/2012310145429Open ↗
04/18/2012310145429Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING1
06/02/2008310145429Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00448336-I1Open ↗
09/01/2026B00448106-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/02/2008310145429Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00448106-I1Open ↗
08/13/2026B00448336-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
06/02/2008310145429Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/05/2014310145429Open ↗
06/09/2008310145429Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
06/02/2008310145429Open ↗