← Back
Three families
1046 83 STREET
BROOKLYN · BIN 3152650
💬 Discuss this project
1910Year Built
2.75Stories
C0Building Class
R3XZoning
3,771 sfGross Floor Area
3Units
Rent Stabilized6 Open Violations ▸FDNY Report ↗
Three families · 10,000 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 4 docs
Floor 1
1 job · most recent 11/10/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/10/2025——Air Conditioning Systems
Cooling
Tosot TM42D6MO/ TWH09AT19D6DI 42,000 BTU · Split System ×2
Building Lifecycle
All (63)Filed (2)Violation (12)Objection (44)Special Inspection (5)
05/01/2026
Violation issued (HPD, open)
A
05/01/2026
Objection resolved — Addressed
05/01/2026
Objection resolved — Addressed
05/01/2026
Objection resolved — Addressed
04/06/2026
Objection raised — Scope
04/06/2026
Objection raised — Scope
04/06/2026
Objection resolved — Resolved
04/06/2026
Objection resolved — Open
04/06/2026
Objection resolved — Open
01/28/2026
Objection resolved — Resolved
01/28/2026
Objection resolved — Resolved
01/28/2026
Objection resolved — Resolved
01/27/2026
Objection resolved — Resolved
01/23/2026
Objection resolved — Resolved
01/23/2026
Objection resolved — Resolved
01/06/2026
Objection resolved — Addressed
12/06/2025
Objection resolved — Addressed
12/05/2025
Objection raised — Fire_Protection
11/21/2025
Objection raised — Scope
11/21/2025
Objection raised — Scope
11/21/2025
Objection raised — Scope
11/21/2025
Objection raised — Mechanical
11/21/2025
Objection raised — Mechanical
11/21/2025
Objection raised — Cost
11/21/2025
Objection raised — Fire_Protection
11/21/2025
Objection raised — Zoning
11/21/2025
Objection raised — Scope
11/21/2025
Objection raised — Admin
11/21/2025
Objection raised — Zoning
11/21/2025
Objection raised — Structural
11/21/2025
Objection raised — Scope
11/20/2025
Violation issued (HPD, open)
I
11/10/2025
Filed — Alteration CO
CONVERT EXISTING FOUR FAMILY TO TWO FAMILY WITH INTERIOR WORK AT SECOND AND THIRD FLOORS. FILING TO OBTAIN A NEW CERTIFICATE OF OCCUPANCY.
B01306560-I1
11/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
11/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
11/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
10/21/2025
Objection resolved — Addressed
10/21/2025
Special inspection requirement — Mechanical Systems
10/21/2025
Special inspection requirement — Final
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/22/2025
Objection resolved — Addressed
09/17/2025
Objection raised — Scope
09/17/2025
Objection raised — Admin
09/16/2025
Objection raised — Scope
09/16/2025
Objection raised — Structural
09/16/2025
Objection raised — Scope
09/16/2025
Objection raised — Inspections
09/16/2025
Objection raised — Structural
09/16/2025
Objection raised — Scope
09/16/2025
Objection raised — Structural
09/16/2025
Objection raised — Structural
08/22/2025
Filed — Alteration
FILING TO INSTALL EXTERIOR STAIR AT SIDE YARD. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B01274119-I1
06/06/2025
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, closed)
I
04/08/2024
Violation issued (HPD, open)
A
11/22/2023
Violation issued (HPD, closed)
I
03/21/2023
Violation issued (HPD, open)
A
11/10/2022
Violation issued (HPD, closed)
I
02/22/2022
Violation issued (HPD, open)
A
Latest 60 of 63 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J SCANIO MANAGEMENT403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SELF EMPLOYED111/10/2025
AA BLDG & INSP SVC LLC108/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MARIA203/21/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/03/2025HVAC-R and service water heating system controls—energy_progress
11/03/2025HVAC-R and service water piping design and insulation—energy_progress
11/03/2025HVAC-R and service water heating equipment—energy_progress
10/21/2025Mechanical Systems—special
10/21/2025Final—progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026B01274119-I1Request digital key ↗
08/15/2026B01306560-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026B01306560-I1Open ↗
08/13/2026B01274119-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01306560-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/15/2026B01306560-I1Open ↗
08/13/2026B01274119-I1Open ↗