DOB09/27/2011WORK DOES NOT CONFORM TO APPROVED PLANS PROVIDED AT SITE REMEDY; MAKE SITE SAFE CONFORM TO APPROVED DOCUMENTS OR AMEND APPROVED PLANS
DOB09/25/2007FAILURE TO PROTECT ADJ. STRUCTURES DURING EXCAVATION OPERATIONS, WALKW AY BET. 225 85 ST. BLDG. AND CONSTR. SITE. 301929327 SAGGINH AND DISC FROM BLDG. REMEDY: AT AREA ADJ. TO THE 225 85 ST. EXCEPT TO PROVIDE PROTECTION
DOB10/25/2006V-DOB VIOLATION - ACTIVE
DOB09/15/2006V-DOB VIOLATION - ACTIVE
DOB09/15/2006WORK CONTRARY TO BUILDING DEPT APPROVED PLANT NOTED STEEL WHALERS & RA KERS DIFFER IN DIMENSIONS AS SHOWN IN APPROVED PLANS.STOP ALL WORK REMEDY: AMEND PLANS TO SHOW AS BUILT OR CONFORM TO APPROVED PLANS
DOB08/11/2006WORK DOES NOT CONFORM TO APPROVED PLANS #302196291 ISSUED 7/26/06 EXP 8/4/06 NOTED: H-PILES HAVE BEEN INSTALLED CONTRARY TO PLANS. EAST & WEST SIDE OF EXCAVATION, H-PILES HAVE BEEN INSTALLED AT VARIOUS REMEDY: STOP AL WORK. CONFORM TO OR AMEND PLANS FORTHWITH. CALL DEPT OF BLDGS PRIOR TO COMMENCEMENT OF WORK AT (71) 802-3707
DOB07/03/2006V-DOB VIOLATION - ACTIVE
ECB06/12/2006STORAGE & USE OF FLAMABLE, COMBUSTIBLE MIXTURES. UPON INSP. ACYTELENE & OXYGEN W/ TORCH ON SITE. NO FIRE DEPT PERMITS STEEL I BEAMS OUT FOR PILES. REMEDY:STOP ALL USE OF FLAMABLE MIXTURES OBTAIN FIRE DEPT PERMINothing owed — awaiting certificate of correction