← Back
Predominantly retail with other uses
8515 4 AVENUE
BROOKLYN · BIN 3153140
💬 Discuss this project
1921Year Built
3Stories
K4Building Class
C4-2AZoning
10,464 sfGross Floor Area
5Units
0 Open ViolationsFDNY Report ↗
Predominantly retail with other uses · Owner of record: WSW 8515-17 REALTY LLC · 4,232 sf lot · 2.47 FAR built · Flood zone X
Locations of Work
Mechanical
Cellar1p · 1 filing · 3 docs
4 jobs · most recent 02/27/2024
General Wiring
FiledStatusContractorScope
02/27/2024CompleteG-ELECTRIC INCGeneral Wiring
02/06/2024CancelledG-ELECTRIC INCGeneral Wiring
01/19/2024CancelledG-ELECTRIC INCGeneral Wiring
06/09/2021CompleteENTERPRISE ELEC'L SYSTEMSGeneral Wiring
Building Lifecycle
All (37)Filed (5)Permit Issued (4)Signed Off (3)Violation (8)Inspection (6)Objection (7)Special Inspection (4)
05/09/2025
Violation issued (ECB, closed)
Construction
11/08/2024
Violation issued (ECB, closed)
Construction
09/10/2024
Signed off — Alteration
Response to violation#071013CMTF02KP, 02, 11, 18KP. Work includes removal of showers, illuminated double faced sign and awning and discontinuance of illegal physical cultural establishment all at 2nd flr. No change to use, egress or occupancy.
B00902544-I1
09/10/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/09/2024
Permit issued — General Construction
B00902544-I1-GC
09/05/2024
Signed off — Alteration
Response to violation#071013CMTF02KP, 02, 11, 18KP. Work includes removal of showers, illuminated double faced sign and awning and discontinuance of illegal physical cultural establishment all at 2nd flr. No change to use, egress or occupancy.
B00902544-S1
08/05/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/05/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/26/2024
Permit issued — Plumbing
B00902544-S1-PL
05/07/2024
Permit issued — General Construction
B00902544-I1-GC
02/22/2024
Objection resolved — Resolved
02/22/2024
Objection resolved — Resolved
02/22/2024
Objection resolved — Resolved
02/14/2024
Objection raised — Other
02/14/2024
Objection raised — Other
02/14/2024
Objection raised — Other
02/14/2024
Objection raised — Other
02/12/2024
Filed — Alteration
NON-ADVERTISING ILLUMINATED ACCESSORY BUSINESS WALL SIGN WORDING : DIAMOND BRACES
B01000609-I1
09/29/2023
Filed — Alteration
Response to violation#071013CMTF02KP, 02, 11, 18KP. Work includes removal of showers, illuminated double faced sign and awning and discontinuance of illegal physical cultural establishment all at 2nd flr. No change to use, egress or occupancy.
B00902544-S1
09/28/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Smerina
09/12/2023
Filed — Alteration
Response to violation#071013CMTF02KP, 02, 11, 18KP. Work includes removal of showers, illuminated double faced sign and awning and discontinuance of illegal physical cultural establishment all at 2nd flr. No change to use, egress or occupancy.
B00902544-I1
08/09/2023
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Smerina
07/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Smerina
07/13/2023
Special inspection requirement — Final
Joseph Smerina
01/12/2023
Filed — Alteration
B00812312-I1
11/18/2021
Signed off — Alteration
B00437563-I1
08/11/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/11/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
08/11/2021
Inspection — Certified Water Pressure - WP - PL - Underground Test
Certified
View inspection ↗
07/23/2021
Permit issued — Plumbing
B00437563-I1-PL
12/07/2020
Filed — Alteration
B00437563-I1
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/10/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/10/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/10/2013
Violation issued (DOB, closed)
VW*-VIOLATION - WORK W/O PERMIT DISMISSED
07/10/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/11/2010
Violation issued (ECB, closed)
Boilers
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WSW 8515-17 REALTY1407/08/2026
CO-WSW REALTY103/21/2026
DIAMOND BRACES203/21/2026
CITI BANK103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CSMR DESIGNS103/21/2026
NEW YORK DESIGN ARCHITECT LLP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOHN EVAN CONTRACTING CORGeneral Contractor603/21/2026
G-ELECTRIC INCElectrical203/22/2026
DREAMPIPE INCPlumbing107/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AKS ARCHITECTURAL & ENGIN1957209/29/2023
EUGENE KHANANOV ARCHITECT2816112/07/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJOHN EVAN CONTRACTING COR09/09/2024
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR07/26/2024
DOB NOWGeneral ConstructionSigned-offJOHN EVAN CONTRACTING COR05/07/2024
DOB NOWPlumbingSigned-offDREAMPIPE INC07/23/2021
BISOTISSUEDSEVENTH FLOOR SERVICES IN07/16/2021
BISOTISSUEDSMVP MGMT INC02/27/2019
BISOTISSUEDBARTER SIGNS INC06/22/2001
BISPLISSUEDAMOK INC02/08/2001
BISMHISSUEDHUMIDITY CONTROL SERVICE CORP.03/20/1996
BISOTISSUEDJANTON INDUSTRIES09/21/1995
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/10/2024Pass-Final General Construction Non-Directive 14PassView ↗
08/05/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/11/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/11/2021Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
08/11/2021Certified Water Pressure - WP - PL - Underground TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
09/28/2023Tenant Protection Plan ComplianceJoseph Smerinaspecial
08/09/2023Tenant Protection Plan ComplianceJoseph Smerinaspecial
07/13/2023Fire-Resistant Penetrations and JointsJoseph Smerinaspecial
07/13/2023FinalJoseph Smerinaprogress
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
08/27/2026B00812312-I1Request digital key ↗
08/26/2026B00902544-I1Request digital key ↗
08/26/2026B00902544-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00437563-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION5
11/20/2021340794509Open ↗
11/17/2021340794509Open ↗
12/07/2020340794509Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION2
07/16/2021340794509Open ↗
02/28/2019321850760Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/02/2026B00437563-I1Open ↗
08/26/2026B00902544-I1Open ↗
08/26/2026B00902544-S1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
07/22/2019321850760Open ↗
02/13/2019321850760Open ↗
02/22/2017321527987Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/07/2020340794509Open ↗
02/13/2019321850760Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026B00902544-I1Open ↗
09/01/2026B00902544-S1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/07/2020340794509Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/07/2020340794509Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/13/2019321850760Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/02/2026B00902544-I1Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/22/2017321527987Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
02/13/2019321850760Open ↗
02/22/2017321527987Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/02/2026B00437563-I1Open ↗
08/26/2026B00902544-I1Open ↗
08/26/2026B00902544-S1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
12/07/2020340794509Open ↗
02/13/2019321850760Open ↗
02/22/2017321527987Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/20/2021340794509Open ↗
12/29/2020340794509Open ↗
12/07/2020340794509Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
07/22/2019321850760Open ↗
02/13/2019321850760Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/22/2019321850760Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/07/2020340794509Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/20/2021340794509Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00437563-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/20/2021340794509Open ↗
12/29/2020340794509Open ↗
12/07/2020340794509Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/23/2021340794509Open ↗
07/22/2019321850760Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
12/07/2020340794509Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
02/22/2017321527987Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
12/07/2020340794509Open ↗
07/22/2019321850760Open ↗
02/13/2019321850760Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/20/2021340794509Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET2
02/12/2019321850760Open ↗
02/22/2017321527987Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/07/2020340794509Open ↗
▸BISADDITIONAL INFORMATION1
11/20/2021340794509Open ↗
▸BISBOROUGH INTAKE FORM1
07/22/2019321850760Open ↗