← Back
Primarily 2 family with 1 store or office
9003 5 AVENUE
BROOKLYN · Bay Ridge · BIN 3154781
💬 Discuss this project
1928Year Built
3Stories
S2Building Class
R6BZoning
3,120 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 9003 5TH AVE LLC · 1,538 sf lot · 2.03 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Cellar15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
9003 5TH AVE LLC203/22/2026
PRO BUILDERS203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/10/2021$1.7M—Private party → 9003 5TH AVE LLC$537/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
FRANK BUENO EXPEDITING2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRO BUILDERS INCGeneral Contractor707/08/2026
DNR ELECTRIC INCORPORATEElectrical103/22/2026
BYPASS MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519512/27/2022
Building Lifecycle
All (66)Filed (11)Permit Issued (4)Signed Off (3)Violation (6)Inspection (4)Objection (8)Special Inspection (30)
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/2023
Signed off — Alteration
INSTERIOR RENOVATION OF EXISTING CELLAR AND FIRST FLOOR OF EXISTING COMMERCIAL SAPCE, NO CHANGE IN USE, OCCUPANCY OR EGRESS
B00654951-I1
03/15/2023
Signed off — Alteration
INSTALLATION OF ONE SINK IN CELLAR AND2 PCSBATHROOM IN FIRST FLOOR
B00655047-I1
03/12/2023
Special inspection requirement — Energy Code Compliance Inspections
Michael Mazzella
03/09/2023
Filed — Alteration
INSTALLATION OF ONE SINK IN CELLAR AND2 PCSBATHROOM IN FIRST FLOOR
B00655047-P4
03/06/2023
Signed off — Alteration
WOOD CONSTRUCTION FENCE TO BE INSTALLED IN CONJUNCTION WITH SOE APPLICATION. NO CHANGE IN USE OCCUPANCY OR EGRESS TO BE PERFORMED UNDER THIS APPLICATION
B00801790-I1
03/06/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/06/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/02/2023
Filed — Alteration
INSTALLATION OF ONE SINK IN CELLAR AND2 PCSBATHROOM IN FIRST FLOOR
B00655047-P3
03/02/2023
Special inspection requirement — Energy Code Compliance Inspections
Michael Mazzella
01/04/2023
Violation issued (ECB, closed)
Construction
01/02/2023
Permit issued — Construction Fence
B00801790-I1-FN
12/27/2022
Filed — Alteration
INSTERIOR RENOVATION OF EXISTING CELLAR AND FIRST FLOOR OF EXISTING COMMERCIAL SAPCE, NO CHANGE IN USE, OCCUPANCY OR EGRESS
B00654951-P3
12/27/2022
Objection resolved — Addressed
12/27/2022
Objection resolved — Addressed
12/27/2022
Objection resolved — Addressed
12/27/2022
Special inspection requirement — Exterior lighting power
Michael Mazzella
12/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
12/27/2022
Special inspection requirement — Lighting controls
Michael Mazzella
12/27/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
12/27/2022
Special inspection requirement — Final
NAVEEN KUMAR
12/27/2022
Special inspection requirement — Insulation placement and R values
Michael Mazzella
12/27/2022
Special inspection requirement — Fire-Resistance Rated Construction
Michael Mazzella
12/27/2022
Special inspection requirement — Mechanical Systems
Younes Abouyaala
12/27/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
12/27/2022
Special inspection requirement — HVAC-R and service water heating equipment
Michael Mazzella
12/27/2022
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
12/27/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Mazzella
12/27/2022
Special inspection requirement — HVAC-R and service water heating system controls
Michael Mazzella
12/27/2022
Special inspection requirement — Energy Code Compliance Inspections
Michael Mazzella
12/27/2022
Special inspection requirement — Electrical motors and elevators
Michael Mazzella
12/27/2022
Special inspection requirement — Fenestration air leakage
Michael Mazzella
12/27/2022
Special inspection requirement — Protection of exposed foundation insulation
Michael Mazzella
12/27/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Michael Mazzella
12/27/2022
Special inspection requirement — Interior lighting power
Michael Mazzella
12/27/2022
Special inspection requirement — Air barrier - visual inspection
Michael Mazzella
12/23/2022
Objection raised — Mechanical
12/23/2022
Objection raised — Structural
12/23/2022
Objection raised — Scope
12/20/2022
Filed — Alteration
WOOD CONSTRUCTION FENCE TO BE INSTALLED IN CONJUNCTION WITH SOE APPLICATION. NO CHANGE IN USE OCCUPANCY OR EGRESS TO BE PERFORMED UNDER THIS APPLICATION
B00801790-I1
12/16/2022
Permit issued — Support of Excavation
B00654951-S2-SE
11/30/2022
Objection resolved — Addressed
11/21/2022
Objection raised — Other
11/10/2022
Filed — Alteration
INSTERIOR RENOVATION OF EXISTING CELLAR AND FIRST FLOOR OF EXISTING COMMERCIAL SAPCE, NO CHANGE IN USE, OCCUPANCY OR EGRESS
B00654951-S2
11/10/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
11/10/2022
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
11/10/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
11/10/2022
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Younes Abouyaala
10/19/2022
Filed — Alteration
INSTERIOR RENOVATION OF EXISTING CELLAR AND FIRST FLOOR OF EXISTING COMMERCIAL SAPCE, NO CHANGE IN USE, OCCUPANCY OR EGRESS
B00654951-P2
10/19/2022
Filed — Alteration
INSTALLATION OF ONE SINK IN CELLAR AND2 PCSBATHROOM IN FIRST FLOOR
B00655047-P2
10/18/2022
Special inspection requirement — Mechanical Systems
Younes Abouyaala
10/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
10/18/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
10/18/2022
Special inspection requirement — Energy Code Compliance Inspections
Michael Mazzella
10/11/2022
Violation issued (ECB, closed)
Site Safety
09/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/16/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/09/2022
Filed — Alteration
INSTALLATION OF ONE SINK IN CELLAR AND2 PCSBATHROOM IN FIRST FLOOR
B00655047-P1
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offPRO BUILDERS INC01/02/2023
DOB NOWSupport of ExcavationPermit IssuedPRO BUILDERS INC12/16/2022
DOB NOWPlumbingSigned-offBYPASS MECHANICAL CORP04/26/2022
DOB NOWMechanical SystemsSigned-offPRO BUILDERS INC03/25/2022
1 project · most recent 12/27/2022
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/27/2022Permit IssuedPRO BUILDERS INCAir Conditioning Systems
Cooling
Fujitsu 18RLXFZ 36,000 BTU · Heat Pump Outdoor ×8
1 project · most recent 05/11/2022
General Wiring
FiledStatusContractorScope
05/11/2022Permit IssuedDNR ELECTRIC INCORPORATEGeneral Wiring
1 project · most recent 12/27/2022
FiledStatusContractorScope
12/27/2022Permit IssuedPRO BUILDERS INC1 scope_items
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/16/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
03/12/2023Energy Code Compliance InspectionsMichael Mazzellaprogress
03/02/2023Energy Code Compliance InspectionsMichael Mazzellaprogress
12/27/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
12/27/2022Mechanical SystemsYounes Abouyaalaspecial
12/27/2022Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
12/27/2022Subgrade InspectionsYounes Abouyaalaspecial
12/27/2022Energy Code Compliance InspectionsMichael Mazzellaprogress
12/27/2022FinalNAVEEN KUMARprogress
12/27/2022Fire-Resistance Rated ConstructionMichael Mazzellaprogress
12/27/2022Air barrier - visual inspectionMichael Mazzellaenergy_progress
12/27/2022Exterior lighting powerMichael Mazzellaenergy_progress
12/27/2022Lighting controlsMichael Mazzellaenergy_progress
12/27/2022HVAC-R and service water heating equipmentMichael Mazzellaenergy_progress
12/27/2022HVAC-R and service water piping design and insulationMichael Mazzellaenergy_progress
12/27/2022HVAC-R and service water heating system controlsMichael Mazzellaenergy_progress
12/27/2022Insulation placement and R valuesMichael Mazzellaenergy_progress
12/27/2022Electrical motors and elevatorsMichael Mazzellaenergy_progress
12/27/2022Fenestration air leakageMichael Mazzellaenergy_progress
12/27/2022Protection of exposed foundation insulationMichael Mazzellaenergy_progress
12/27/2022Fenestration and door U-factor and product ratingsMichael Mazzellaenergy_progress
12/27/2022Interior lighting powerMichael Mazzellaenergy_progress
12/27/2022Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
11/10/2022Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
11/10/2022Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
11/10/2022Construction Operations Influencing Adjacent StructuresYounes Abouyaalaspecial
Latest 25 of 68.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/31/2026B00655047-I1Request digital key ↗
08/31/2026B00655047-P4Request digital key ↗
08/31/2026B00655047-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications67
▸DOB NOWProgress Inspector Seal & Signature49
09/19/2026B00655047-I1Open ↗
08/29/2026B00654951-P1Open ↗
08/29/2026B00654951-P1Open ↗
Showing 3 of 49 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/31/2026B00655047-P1Open ↗
08/31/2026B00655047-P2Open ↗
08/31/2026B00655047-P3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/29/2026B00654951-P1Open ↗
08/29/2026B00654951-P1Open ↗
08/28/2026B00654951-P3Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/31/2026B00655047-I1Open ↗
08/31/2026B00655047-P1Open ↗
08/31/2026B00655047-P2Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00654951-I1Open ↗
▸Other Documents2
▸DOB NOWPlot Diagram1
08/13/2026B00654951-S2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00654951-S2Open ↗