← Back
Primarily 5-6 family with 1 store or office
9218 3 AVENUE
BROOKLYN · BIN 3155073
💬 Discuss this project
1926Year Built
3Stories
S5Building Class
R6BZoning
4,674 sfGross Floor Area
6Units
Rent Stabilized38 Open Violations ▸FDNY Report ↗
Primarily 5-6 family with 1 store or office · Owner of record: 9218 3RD AVENUE LLC · 1,900 sf lot · 2.46 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
9218 3RD AVENUE LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GEE2000 ARCHITECT P.C.202/08/2024
NEW YORK ENGINEERING ASSOC., P.C.212/20/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARCO PLBG AND HTG INCPlumbing307/08/2026
MAVRICI CONSTRUCTION INCGeneral Contractor107/08/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEE2000 ARCHITECT P.C.691202/08/2024
NEW YORK ENGINEERING ASSO851212/20/2021
Building Lifecycle
All (66)Filed (4)Permit Issued (5)Signed Off (4)Violation (41)Inspection (6)Special Inspection (6)
04/30/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/05/2025
Violation issued (HPD, open)
A
11/26/2024
Violation issued (HPD, open)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/23/2024
Signed off — Alteration
RENOVATION OF APT. 1R ON 1ST FLOOR. PARTITION WORK AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EXIT.
B01000791-S1
05/23/2024
Signed off — Alteration
RENOVATION OF APT. 1R ON 1ST FLOOR. PARTITION WORK AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EXIT.
B01000791-I1
05/06/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/18/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/03/2024
Violation issued (HPD, open)
A
03/13/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/11/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/01/2024
Permit issued — Plumbing
B01000791-S1-PL
02/23/2024
Violation issued (HPD, open)
C
02/23/2024
Violation issued (HPD, closed)
C
02/23/2024
Violation issued (HPD, open)
C
02/23/2024
Violation issued (HPD, open)
A
02/23/2024
Violation issued (HPD, open)
A
02/23/2024
Violation issued (HPD, open)
B
02/23/2024
Violation issued (HPD, open)
A
02/23/2024
Violation issued (HPD, open)
A
02/23/2024
Violation issued (HPD, open)
A
02/23/2024
Violation issued (HPD, open)
A
02/13/2024
Permit issued — General Construction
B01000791-I1-GC
02/08/2024
Filed — Alteration
RENOVATION OF APT. 1R ON 1ST FLOOR. PARTITION WORK AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EXIT.
B01000791-S1
02/07/2024
Filed — Alteration
RENOVATION OF APT. 1R ON 1ST FLOOR. PARTITION WORK AS PER PLAN. NO CHANGE IN USE, OCCUPANCY OR EXIT.
B01000791-I1
11/17/2023
Violation issued (HPD, open)
I
03/17/2023
Violation issued (HPD, open)
A
02/01/2023
Signed off — Alteration
REPLACE GAS PIPING FOR REPLACEMENT BOILER AND REGISTER GAS HOT WATER HEATER.
B00643762-I1
01/23/2023
Signed off — Alteration
B00643711-I1
01/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/03/2023
Permit issued — Plumbing
B00643762-I1-PL
11/07/2022
Violation issued (HPD, open)
I
08/31/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
02/18/2022
Violation issued (HPD, open)
A
02/18/2022
Violation issued (HPD, open)
I
12/29/2021
Permit issued — Boiler Equipment
B00643711-I1-BE
12/29/2021
Permit issued — Plumbing
B00643762-I1-PL
12/20/2021
Filed — Alteration
REPLACE GAS PIPING FOR REPLACEMENT BOILER AND REGISTER GAS HOT WATER HEATER.
B00643762-I1
12/20/2021
Filed — Alteration
B00643711-I1
12/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
12/20/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
12/20/2021
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
12/20/2021
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
12/20/2021
Special inspection requirement — Maintenance information
LOUIS ARENA
12/08/2021
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
04/05/2021
Violation issued (HPD, open)
I
04/05/2021
Violation issued (HPD, open)
A
10/28/2019
Violation issued (HPD, open)
I
10/12/2018
Violation issued (HPD, open)
I
11/15/2017
Violation issued (HPD, open)
I
11/01/2016
Violation issued (HPD, closed)
I
05/16/2016
Violation issued (HPD, open)
B
05/16/2016
Violation issued (HPD, open)
A
05/16/2016
Violation issued (HPD, open)
A
02/05/2015
Violation issued (HPD, closed)
I
09/20/2009
Violation issued (HPD, open)
B
06/27/2002
Violation issued (HPD, open)
B
06/24/1981
Violation issued (HPD, open)
B
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPLBG P & H INC03/01/2024
DOB NOWGeneral ConstructionSigned-offMAVRICI CONSTRUCTION INC02/13/2024
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC01/03/2023
DOB NOWBoiler EquipmentSigned-offARCO PLBG AND HTG INC12/29/2021
DOB NOWPlumbingSigned-offARCO PLBG AND HTG INC12/29/2021
1 project · most recent 03/08/2024
FiledStatusContractorScope
03/08/2024CompleteVERTEX ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/06/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/31/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/20/2021Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
12/20/2021HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
12/20/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
12/20/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
12/20/2021Maintenance informationLOUIS ARENAenergy_progress
12/08/2021Energy Code Compliance InspectionsLOUIS ARENAprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/31/2026B00643762-I1Request digital key ↗
08/31/2026B00643711-I1Request digital key ↗
08/26/2026B01000791-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/31/2026B00643711-I1Open ↗
08/26/2026B01000791-I1Open ↗
08/26/2026B01000791-S1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/31/2026B00643711-I1Open ↗
08/26/2026B01000791-S1Open ↗
08/26/2026B01000791-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026B00643711-I1Open ↗
08/13/2026B00643762-I1Open ↗