← Back
Miscellaneous one family
342 93 STREET
BROOKLYN · BIN 3155251
💬 Discuss this project
1915Year Built
2Stories
A9Building Class
R4-1Zoning
1,488 sfGross Floor Area
1Units
Miscellaneous one family · 3,375 sf lot · 0.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbing
Roof3p · 1 filing · 18 docs
Cellar2p · 1 filing · 18 docs
1 job · most recent 06/09/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/09/2026——Heating and Air Conditioning Systems
Heat / Cool
Daikin RXTA36AAVJU 36,000 BTU · Vrf Outdoor ×2
Thermo 2000 COMBO MAX ULTRA-50 15,364 BTU · Water Heater ×1
1 job · most recent 06/09/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/09/2026——Storm, Water/Sanitary
1 job · most recent 04/20/2026
General Wiring
FiledStatusContractorScope
04/20/2026Permit IssuedSHELBY ELECTRICAL CORPGeneral Wiring
1 job · most recent 06/09/2026
Masonry Wood
FiledStatusContractorScope
06/09/2026——Masonry, Wood
1 job · most recent 05/01/2026
Fence
FiledStatusContractorScope
05/01/2026Permit IssuedSAPOL CONSTRUCTION LLCFence
Building Lifecycle
All (52)Filed (3)Permit Issued (1)Objection (18)Special Inspection (30)
08/04/2026
Objection resolved — Resolved
07/21/2026
Objection resolved — Resolved
07/21/2026
Objection resolved — Resolved
07/16/2026
Objection resolved — Open
07/16/2026
Objection resolved — Addressed
06/29/2026
Objection raised — Cost
06/29/2026
Objection raised — Scope
06/29/2026
Objection raised — Scope
06/29/2026
Objection resolved — Open
06/29/2026
Objection resolved — Addressed
06/23/2026
Objection resolved — Addressed
06/10/2026
Objection raised — Cost
06/10/2026
Objection raised — Scope
06/10/2026
Objection raised — Scope
06/10/2026
Objection raised — Scope
06/10/2026
Objection raised — Scope
06/09/2026
Filed — Alteration CO
Application to convert an existing two-story, single-family residential building into a two-family residence, including horizontal enlargement at the first and second floors.
B01395157-S3
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
06/09/2026
Special inspection requirement — Maintenance information
06/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/09/2026
Special inspection requirement — Permanent certificate
06/04/2026
Filed — Alteration CO
Application to convert an existing two-story, single-family residential building into a two-family residence, including horizontal enlargement at the first and second floors.
B01395157-I1
05/26/2026
Special inspection requirement — Insulation placement and R values
05/26/2026
Special inspection requirement — Air barrier — testing
05/26/2026
Special inspection requirement — Interior lighting power
05/26/2026
Special inspection requirement — Fenestration areas
05/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
05/26/2026
Special inspection requirement — Air barrier - visual inspection
05/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/26/2026
Special inspection requirement — Fenestration air leakage
05/26/2026
Special inspection requirement — Maintenance information
05/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/26/2026
Special inspection requirement — Permanent certificate
05/26/2026
Special inspection requirement — Metering
05/26/2026
Special inspection requirement — Protection of exposed foundation insulation
05/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
05/25/2026
Special inspection requirement — Concrete - Cast-In-Place
05/25/2026
Special inspection requirement — Structural Steel - Details
05/25/2026
Special inspection requirement — Structural Steel - Welding
05/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/25/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/25/2026
Special inspection requirement — Energy Code Compliance Inspections
05/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/25/2026
Special inspection requirement — Masonry
05/25/2026
Special inspection requirement — Structural Wood Frame
05/20/2026
Permit issued — Construction Fence
B01395748-I1-FN
05/12/2026
Objection resolved — Addressed
05/11/2026
Objection raised — Other
05/01/2026
Filed — Alteration
INSTALL CONSTRUCTION FENCE AS PER PLANS.
B01395748-I1
04/29/2026
Special inspection requirement — Mechanical Systems
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WOJDA107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MZ ARCHITECTURE PLLC206/09/2026
TWIN OAKS CONSULTING LLC106/04/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAPOL CONSTRUCTION LLCGeneral Contractor107/08/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedSAPOL CONSTRUCTION LLC05/20/2026
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
06/09/2026Fire-Resistant Penetrations and Joints—special
06/09/2026HVAC-R and service water heating equipment—energy_progress
06/09/2026HVAC-R and service water piping design and insulation—energy_progress
06/09/2026Maintenance information—energy_progress
06/09/2026HVAC-R and service water heating system controls—energy_progress
06/09/2026Permanent certificate—energy_progress
05/26/2026Insulation placement and R values—energy_progress
05/26/2026Air barrier — testing —energy_progress
05/26/2026Interior lighting power—energy_progress
05/26/2026Fenestration areas—energy_progress
05/26/2026HVAC-R and service water heating system controls—energy_progress
05/26/2026Air barrier - visual inspection—energy_progress
05/26/2026HVAC-R and service water heating equipment—energy_progress
05/26/2026Fenestration air leakage—energy_progress
05/26/2026Maintenance information—energy_progress
05/26/2026HVAC-R and service water piping design and insulation—energy_progress
05/26/2026Permanent certificate—energy_progress
05/26/2026Metering—energy_progress
05/26/2026Protection of exposed foundation insulation—energy_progress
05/26/2026Fenestration and door U-factor and product ratings—energy_progress
05/25/2026Concrete - Cast-In-Place—special
05/25/2026Structural Steel - Details—special
05/25/2026Structural Steel - Welding—special
05/25/2026Structural Stability – Alterations of existing buildings—special
05/25/2026Subsurface Investigations (Borings/Test Pits)—special
Latest 25 of 32.
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/14/2026B01395157-I1Request digital key ↗
08/14/2026B01395748-I1Request digital key ↗
08/14/2026B01395157-S3Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026B01395157-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026B01395157-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/14/2026B01395157-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/17/2026B01395748-I1Open ↗
08/16/2026B01395157-I1Open ↗
08/16/2026B01395157-S3Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/14/2026B01395157-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/14/2026B01395157-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/14/2026B01395157-I1Open ↗
08/14/2026B01395157-S3Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT1
08/14/2026B01395157-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/14/2026B01395157-I1Open ↗
▸Other Documents5
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026B01395157-I1Open ↗
▸DOB NOWPlot Diagram1
08/14/2026B01395157-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026B01395157-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026B01395157-I1Open ↗
▸DOB NOWFinal Survey1
08/14/2026B01395157-I1Open ↗