← Back
Three families
1217 70 STREET
BROOKLYN · BIN 3156483
💬 Discuss this project
1925Year Built
2Stories
C0Building Class
R5BZoning
3,529 sfGross Floor Area
3Units
38 Open Violations ▸FDNY Report ↗
Three families · 1,600 sf lot · 2.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingGeneral
Roof3p · 2 filings · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 2
Floor 13p · 2 filings · 20 docs
Cellar6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1217 70TH ST LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BILLAH ENGINEERING PLLC711/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BILLAH ENGINEERING5838411/30/2021
Building Lifecycle
All (71)Filed (7)Permit Issued (2)Signed Off (2)Violation (45)Inspection (3)Special Inspection (12)
05/01/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/06/2025
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
I
04/08/2024
Violation issued (HPD, open)
A
11/21/2023
Violation issued (HPD, open)
I
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/21/2023
Violation issued (HPD, open)
A
11/10/2022
Violation issued (HPD, open)
I
02/22/2022
Violation issued (HPD, open)
I
02/22/2022
Violation issued (HPD, open)
A
12/09/2021
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND, AND THIRD FLOOR WITHGENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETICWORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00519414-I1
12/07/2021
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/03/2021
Signed off — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITHPLUMBING WORK AS PER PLAN : RELOCATE KITCHEN AND BATHROOM FIXTURES;NEW BOILERS AND HOT WATER HEATERS ON CELLAR. NO CHANGE IN USE, EGRESSOR OCCUPANCY UNDER THIS APPLICATION
B00519415-I1
12/03/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD BILLAH
12/03/2021
Special inspection requirement — Energy Code Compliance Inspections
MOHAMMAD BILLAH
12/03/2021
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMMAD BILLAH
11/30/2021
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND, AND THIRD FLOOR WITHGENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETICWORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00519414-P3
11/29/2021
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMMAD BILLAH
11/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD BILLAH
11/29/2021
Special inspection requirement — Energy Code Compliance Inspections
MOHAMMAD BILLAH
11/07/2021
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMMAD BILLAH
11/07/2021
Special inspection requirement — Energy Code Compliance Inspections
MOHAMMAD BILLAH
11/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD BILLAH
11/06/2021
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITHPLUMBING WORK AS PER PLAN : RELOCATE KITCHEN AND BATHROOM FIXTURES;NEW BOILERS AND HOT WATER HEATERS ON CELLAR. NO CHANGE IN USE, EGRESSOR OCCUPANCY UNDER THIS APPLICATION
B00519415-P2
11/06/2021
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND, AND THIRD FLOOR WITHGENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETICWORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00519414-P2
09/22/2021
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITHPLUMBING WORK AS PER PLAN : RELOCATE KITCHEN AND BATHROOM FIXTURES;NEW BOILERS AND HOT WATER HEATERS ON CELLAR. NO CHANGE IN USE, EGRESSOR OCCUPANCY UNDER THIS APPLICATION
B00519415-P1
09/08/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/08/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/30/2021
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND, AND THIRD FLOOR WITHGENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETICWORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00519414-P1
07/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD BILLAH
07/30/2021
Special inspection requirement — Energy Code Compliance Inspections
MOHAMMAD BILLAH
07/30/2021
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMMAD BILLAH
05/24/2021
Permit issued — Plumbing
B00519415-I1-PL
05/20/2021
Permit issued — General Construction
B00519414-I1-GC
05/13/2021
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND, AND THIRD FLOOR WITHGENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETICWORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00519414-I1
05/13/2021
Filed — Alteration
RENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITHPLUMBING WORK AS PER PLAN : RELOCATE KITCHEN AND BATHROOM FIXTURES;NEW BOILERS AND HOT WATER HEATERS ON CELLAR. NO CHANGE IN USE, EGRESSOR OCCUPANCY UNDER THIS APPLICATION
B00519415-I1
04/06/2021
Violation issued (HPD, open)
I
04/06/2021
Violation issued (HPD, open)
A
12/11/2018
Violation issued (HPD, open)
A
12/11/2018
Violation issued (HPD, open)
A
12/11/2018
Violation issued (HPD, open)
A
12/11/2018
Violation issued (HPD, open)
B
12/11/2018
Violation issued (HPD, open)
B
12/11/2018
Violation issued (HPD, open)
A
12/11/2018
Violation issued (HPD, open)
A
12/11/2018
Violation issued (HPD, open)
A
12/11/2018
Violation issued (HPD, open)
A
12/11/2018
Violation issued (HPD, open)
C
12/11/2018
Violation issued (HPD, open)
C
12/11/2018
Violation issued (HPD, open)
C
12/11/2018
Violation issued (HPD, open)
B
11/02/2016
Violation issued (HPD, closed)
I
02/14/2016
Violation issued (HPD, open)
A
02/14/2016
Violation issued (HPD, open)
C
02/14/2016
Violation issued (HPD, open)
A
02/14/2016
Violation issued (HPD, open)
A
02/14/2016
Violation issued (HPD, open)
A
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC05/24/2021
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC05/20/2021
BISOTISSUEDPAPPALARDI CONSTRUCTION LLC10/21/2010
BISBLISSUEDGEORGE BASSOLINO INC12/09/1996
BISPLISSUEDGEORGE BASSOLINO INC12/09/1996
1 project · most recent 12/14/2021
General Wiring
FiledStatusContractorScope
12/14/2021CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/07/2021Pass-Final General Construction Non-Directive 14PassView ↗
09/08/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/08/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
12/03/2021Fire-Resistant Penetrations and JointsMOHAMMAD BILLAHspecial
12/03/2021Energy Code Compliance InspectionsMOHAMMAD BILLAHprogress
12/03/2021Fire-Resistance Rated ConstructionMOHAMMAD BILLAHprogress
11/29/2021Fire-Resistance Rated ConstructionMOHAMMAD BILLAHprogress
11/29/2021Fire-Resistant Penetrations and JointsMOHAMMAD BILLAHspecial
11/29/2021Energy Code Compliance InspectionsMOHAMMAD BILLAHprogress
11/07/2021Fire-Resistance Rated ConstructionMOHAMMAD BILLAHprogress
11/07/2021Energy Code Compliance InspectionsMOHAMMAD BILLAHprogress
11/07/2021Fire-Resistant Penetrations and JointsMOHAMMAD BILLAHspecial
07/30/2021Fire-Resistant Penetrations and JointsMOHAMMAD BILLAHspecial
07/30/2021Energy Code Compliance InspectionsMOHAMMAD BILLAHprogress
07/30/2021Fire-Resistance Rated ConstructionMOHAMMAD BILLAHprogress
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/31/2026B00519414-P2Request digital key ↗
08/31/2026B00519414-P1Request digital key ↗
08/31/2026B00519414-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
10/27/2010320227946Open ↗
10/22/2010320228525Open ↗
▸BISWORK PERMIT APPLICATION1
10/25/2010320228525Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026B00519414-P2Open ↗
08/31/2026B00519414-P2Open ↗
08/28/2026B00519414-P3Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/13/2026B00519414-P3Open ↗
08/13/2026B00519414-P2Open ↗
08/13/2026B00519415-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026B00519414-P2Open ↗
08/28/2026B00519414-P3Open ↗
08/26/2026B00519414-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
04/12/2011320228525Open ↗
10/22/2010320228525Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/22/2010320228525Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/12/2011320228525Open ↗
03/23/2011320228525Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
10/22/2010320228525Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
03/23/2011320228525Open ↗
10/22/2010320228525Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
10/22/2010320228525Open ↗