← Back
Three families
1376 70 STREET
BROOKLYN · BIN 3157079
💬 Discuss this project
1925Year Built
2.5Stories
C0Building Class
R5BZoning
2,760 sfGross Floor Area
3Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 1376 70TH ST LLC · 3,380 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 31p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 1
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1376 70TH ST LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/02/2022$1.3M—— → —$464/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.505/26/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MEGA GENERAL CONSTRUCTIONGeneral Contractor603/21/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
SAFEPIPE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613405/26/2026
Building Lifecycle
All (86)Filed (5)Permit Issued (4)Signed Off (3)Violation (9)Inspection (5)Objection (30)Special Inspection (30)
08/31/2026
Signed off — Alteration
PROPOSED INTERIOR WORK ON CEL, 1ST, 2ND & 3RD FL, REPAIRING PARTITION, FLOORING, CEILING. EXTERIOR WORK WITH REPLACING WALL SURFACE. MS WORK FOR INSTALL SPLIT AC UNIT ON CEL & 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01192209-I1
08/24/2026
Signed off — Alteration
PROPOSED INTERIOR WORK ON CEL, 1ST, 2ND & 3RD FL, REPAIRING PARTITION, FLOORING, CEILING. EXTERIOR WORK WITH REPLACING WALL SURFACE. MS WORK FOR INSTALL SPLIT AC UNIT ON CEL & 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01192209-S1
08/21/2026
Signed off — Alteration
PROPOSED TEMPORARY CONSTRUCTION FENCE WORK AT OSP. ALIGNED WITH THE FRONT AND SIDE PROPERTY LINE. AND INSIDE THE REAR PROPERTY LINE.
B01187705-I1
07/21/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
07/06/2026
Special inspection requirement — Fenestration areas
Fran Huang
07/06/2026
Special inspection requirement — Air barrier - visual inspection
Fran Huang
07/06/2026
Special inspection requirement — Fenestration air leakage
Fran Huang
07/06/2026
Special inspection requirement — Interior lighting power
Fran Huang
07/06/2026
Special inspection requirement — Mechanical Systems
Fran Huang
07/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
07/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
07/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
07/06/2026
Special inspection requirement — Final
Fran Huang
07/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
07/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
07/06/2026
Special inspection requirement — Insulation placement and R values
Fran Huang
07/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
06/16/2026
Objection resolved — Addressed
06/15/2026
Permit issued — Plumbing
B01192209-S1-PL
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
06/12/2026
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
06/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
06/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
06/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
06/09/2026
Objection raised — Zoning
05/26/2026
Filed — Alteration
PROPOSED INTERIOR WORK ON CEL, 1ST, 2ND & 3RD FL, REPAIRING PARTITION, FLOORING, CEILING. EXTERIOR WORK WITH REPLACING WALL SURFACE. MS WORK FOR INSTALL SPLIT AC UNIT ON CEL & 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01192209-P3
05/26/2026
Filed — Alteration
PROPOSED INTERIOR WORK ON CEL, 1ST, 2ND & 3RD FL, REPAIRING PARTITION, FLOORING, CEILING. EXTERIOR WORK WITH REPLACING WALL SURFACE. MS WORK FOR INSTALL SPLIT AC UNIT ON CEL & 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01192209-P1
12/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
11/11/2025
Special inspection requirement — Mechanical Systems
Fran Huang
11/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
11/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
11/11/2025
Special inspection requirement — Final
Fran Huang
11/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
11/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
11/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
11/11/2025
Special inspection requirement — Air barrier - visual inspection
Fran Huang
11/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
11/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/02/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/17/2025
Permit issued — Plumbing
B01192209-S1-PL
04/10/2025
Permit issued — Mechanical Systems
B01192209-I1-GC-CX
04/09/2025
Objection resolved — Addressed
04/01/2025
Objection resolved — Addressed
04/01/2025
Objection resolved — Addressed
04/01/2025
Objection resolved — Addressed
04/01/2025
Objection resolved — Addressed
03/21/2025
Objection resolved — Addressed
03/21/2025
Objection resolved — Addressed
03/21/2025
Objection resolved — Addressed
03/21/2025
Objection resolved — Addressed
03/21/2025
Objection resolved — Addressed
03/21/2025
Objection resolved — Addressed
03/21/2025
Objection resolved — Addressed
03/21/2025
Objection resolved — Addressed
03/21/2025
Objection resolved — Addressed
03/19/2025
Objection raised — Structural
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSAFEPIPE PLUMBING INC06/15/2026
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP04/17/2025
DOB NOWMechanical SystemsSigned-offMEGA GENERAL CONSTRUCTION04/10/2025
DOB NOWConstruction FenceSigned-offMEGA GENERAL CONSTRUCTION03/06/2025
1 project · most recent 05/26/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/26/2026Signed-offMEGA GENERAL CONSTRUCTIONHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-2C20NA4 22,000 BTU · Heat Pump Outdoor ×2
MUZ-GS12NA 14,400 BTU · Heat Pump Outdoor ×1
1 project · most recent 05/26/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/26/2026Signed-offSAFEPIPE PLUMBING INCGas, Water/Sanitary
1 project · most recent 05/08/2026
General Wiring
FiledStatusContractorScope
05/08/2026Permit IssuedRIGHTWAY ELECTRICAL INCGeneral Wiring
1 project · most recent 03/03/2025
Fence
FiledStatusContractorScope
03/03/2025Signed-offMEGA GENERAL CONSTRUCTIONFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/21/2026Fail-Final General Construction Non-Directive 14FailView ↗
12/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
07/06/2026HVAC-R and service water heating equipmentFran Huangenergy_progress
07/06/2026Fenestration areasFran Huangenergy_progress
07/06/2026Air barrier - visual inspectionFran Huangenergy_progress
07/06/2026Fenestration air leakageFran Huangenergy_progress
07/06/2026Interior lighting powerFran Huangenergy_progress
07/06/2026Mechanical SystemsFran Huangspecial
07/06/2026Structural Stability – Alterations of existing buildingsFran Huangspecial
07/06/2026Fire-Resistant Penetrations and JointsFran Huangspecial
07/06/2026Fire-Resistance Rated ConstructionFran Huangprogress
07/06/2026Energy Code Compliance InspectionsFran Huangprogress
07/06/2026FinalFran Huangprogress
07/06/2026Fenestration and door U-factor and product ratingsFran Huangenergy_progress
07/06/2026HVAC-R and service water heating system controlsFran Huangenergy_progress
07/06/2026Insulation placement and R valuesFran Huangenergy_progress
07/06/2026HVAC-R and service water piping design and insulationFran Huangenergy_progress
06/12/2026Fire-Resistant Penetrations and JointsFran Huangspecial
06/12/2026Energy Code Compliance InspectionsFran Huangprogress
06/12/2026HVAC-R and service water piping design and insulationFran Huangenergy_progress
06/12/2026HVAC-R and service water heating system controlsFran Huangenergy_progress
06/12/2026HVAC-R and service water heating equipmentFran Huangenergy_progress
11/11/2025Fire-Resistant Penetrations and JointsFran Huangspecial
11/11/2025Mechanical SystemsFran Huangspecial
11/11/2025Structural Stability – Alterations of existing buildingsFran Huangspecial
11/11/2025Energy Code Compliance InspectionsFran Huangprogress
11/11/2025FinalFran Huangprogress
Latest 25 of 35.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/22/2026B01187705-I1Request digital key ↗
08/16/2026B01192209-S1Request digital key ↗
08/16/2026B01192209-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications42
▸DOB NOWProgress Inspector Seal & Signature28
08/27/2026B01192209-I1Open ↗
08/27/2026B01192209-I1Open ↗
08/27/2026B01192209-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/16/2026B01192209-S1Open ↗
08/16/2026B01192209-P1Open ↗
08/16/2026B01192209-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/27/2026B01192209-I1Open ↗
08/27/2026B01192209-I1Open ↗
08/27/2026B01192209-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/16/2026B01192209-I1Open ↗
08/16/2026B01192209-P3Open ↗
08/13/2026B01192209-P1Open ↗
Showing 3 of 4 on file for this type