← Back
Three families
1527 73 STREET
BROOKLYN · BIN 3158379
💬 Discuss this project
1910Year Built
2.5Stories
C0Building Class
R5Zoning
2,533 sfGross Floor Area
3Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Three families · 4,000 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/31/2013$932K—Private party → Private party$368/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
H & O ENGINEERING, DPC102/16/2026
RICHARD JIMENEZ ARCHITECTURE211/07/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LSI GENERAL CONTRACTING CGeneral Contractor104/09/2026
AGI SEWER & DRAINS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE L. PENA, P.E5969211/07/2023
Building Lifecycle
All (4)Filed (3)Signed Off (1)
02/16/2026
Filed — Alteration
B01321187-I1
12/19/2023
Signed off — Alteration
Propose 3 new HWHs / 3 new boilers at the existing boiler room, cellar floor level. Install 3 new gas line piping at cellar floor level from 3 existing gas meters to new boilers/HWHs. No change of use, egress, or occupancy.
B00808213-I1
11/07/2023
Filed — Alteration
Propose 3 new HWHs / 3 new boilers at the existing boiler room, cellar floor level. Install 3 new gas line piping at cellar floor level from 3 existing gas meters to new boilers/HWHs. No change of use, egress, or occupancy.
B00808213-P3
01/11/2023
Filed — Alteration
Propose 3 new HWHs / 3 new boilers at the existing boiler room, cellar floor level. Install 3 new gas line piping at cellar floor level from 3 existing gas meters to new boilers/HWHs. No change of use, egress, or occupancy.
B00808213-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedLSI GENERAL CONTRACTING C03/12/2026
DOB NOWPlumbingSigned-offAGI SEWER & DRAINS, INC01/23/2023
2 projects · most recent 11/29/2023
General Wiring
FiledStatusContractorScope
11/29/2023CancelledMAC ELECT'L CONTR. INC.General Wiring
11/16/2023CompleteMAC ELECT'L CONTR. INC.4 meters, 4 new_meters
Nothing on file for this building.
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/28/2026B00808213-P3Request digital key ↗
08/28/2026B00808213-I1Request digital key ↗
08/18/2026B01321187-I1Request digital key ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature5
08/31/2026B00808213-P3Open ↗
08/31/2026B00808213-P3Open ↗
08/28/2026B01321187-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026B00808213-P3Open ↗
08/28/2026B00808213-I1Open ↗
08/18/2026B01321187-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026B00808213-P3Open ↗
08/24/2026B00808213-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/28/2026B00808213-P3Open ↗
08/28/2026B00808213-I1Open ↗
08/18/2026B01321187-I1Open ↗