← Back
Three families
1206 BAY RIDGE PARKWAY
BROOKLYN · BIN 3159933
💬 Discuss this project
1910Year Built
2Stories
C0Building Class
R4-1Zoning
2,060 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · 1,900 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
Architecture
Permit Issued — active, not yet Signed-off
Sub-BasementUnder Construction4p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CASA GROUP1107/08/2026
COLONNA IRENE 1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CPENGINEERING PC102/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CASA GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A & E GENERAL PAINTING INGeneral Contractor1107/08/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (5)Violation (1)Special Inspection (1)
06/16/2026
Permit issued — General Construction
B01179367-I1-GC
07/25/2025
Permit issued — General Construction
B01179367-I1-GC
05/29/2025
Permit issued — General Construction
B01179367-I1-GC
05/21/2025
Permit issued — General Construction
B01179367-I1-GC
02/28/2025
Permit issued — General Construction
B01179367-I1-GC
02/17/2025
Filed — Alteration
Removal and replacement of moldy sheetrock on existing framing.
B01179367-I1
02/11/2025
Special inspection requirement — Final
Craig Puerta
09/16/2024
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedA & E GENERAL PAINTING IN06/16/2026
DOB NOWGeneral ConstructionPermit IssuedA & E GENERAL PAINTING IN07/25/2025
DOB NOWGeneral ConstructionPermit IssuedA & E GENERAL PAINTING IN05/29/2025
DOB NOWGeneral ConstructionPermit IssuedA & E GENERAL PAINTING IN05/21/2025
DOB NOWGeneral ConstructionPermit IssuedA & E GENERAL PAINTING IN02/28/2025
1 project · most recent 11/27/2024
General Wiring
FiledStatusContractorScope
11/27/2024Permit IssuedFIVE BOROUGH ELECTRIC INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
02/11/2025FinalCraig Puertaprogress
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/22/2026B01179367-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01179367-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026B01179367-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01179367-I1Open ↗