← Back
Four families
1472 76 STREET
BROOKLYN · BIN 3160681
💬 Discuss this project
1931Year Built
2Stories
C3Building Class
R4Zoning
3,225 sfGross Floor Area
4Units
Rent Stabilized10 Open Violations ▸FDNY Report ↗
Four families · 2,500 sf lot · 1.29 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingCivilGeneral
Permit Issued — active, not yet Signed-off
Floor 2Under Construction10p · 2 filings · 20 docs
Floor 1Under Construction9p · 2 filings · 20 docs
CellarUnder Construction8p · 1 filing · 12 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/31/2022$1.7M—— → —$515/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Alan Yang Architecture DPC704/17/2026
CHRISTOPHER COMPTON105/02/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor303/21/2026
XH&RC PLBG AND HTG INCPlumbing207/08/2026
HT BUILDS LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN YANG ARCHITECTURE9490704/17/2026
NEW AIR SOLUTION INC8418104/17/2026
ENVIRONMENTAL CODE CONSUL5516105/02/2023
Building Lifecycle
All (78)Filed (8)Permit Issued (4)Violation (24)Inspection (12)Special Inspection (30)
09/04/2026
Violation issued (HPD, open)
A
09/04/2026
Violation issued (HPD, open)
A
09/04/2026
Violation issued (HPD, open)
A
09/04/2026
Violation issued (HPD, open)
A
09/04/2026
Violation issued (HPD, open)
A
09/04/2026
Violation issued (HPD, open)
C
09/04/2026
Violation issued (HPD, open)
B
09/04/2026
Violation issued (HPD, open)
A
08/05/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/01/2026
Violation issued (HPD, closed)
A
04/20/2026
Permit issued — Mechanical Systems
B01165078-I1-GC-CX
04/17/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING FOUR FAMILY WITH GENERAL CONSTRUCTION & MECHANICAL WORK AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B01165078-P3
04/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Alan Yang
04/17/2026
Special inspection requirement — Air barrier - visual inspection
Alan Yang
04/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
Alan Yang
04/17/2026
Special inspection requirement — Final
Alan Yang
04/17/2026
Special inspection requirement — Insulation placement and R values
Alan Yang
04/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
Alan Yang
04/17/2026
Special inspection requirement — Mechanical Systems
Alan Yang
04/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
Alan Yang
04/17/2026
Special inspection requirement — Mechanical Systems
Alan Yang
04/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Alan Yang
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alan Yang
04/17/2026
Special inspection requirement — Interior lighting power
Alan Yang
04/17/2026
Special inspection requirement — Fenestration air leakage
Alan Yang
04/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Alan Yang
04/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
Alan Yang
04/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Alan Yang
04/17/2026
Special inspection requirement — Fenestration air leakage
Alan Yang
04/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alan Yang
04/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Alan Yang
04/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
Alan Yang
04/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
Alan Yang
04/17/2026
Special inspection requirement — Chimneys and vents
Tianchen Hu
04/17/2026
Special inspection requirement — Interior lighting power
Alan Yang
04/17/2026
Special inspection requirement — Air barrier - visual inspection
Alan Yang
04/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Alan Yang
04/17/2026
Special inspection requirement — Fenestration areas
Alan Yang
04/17/2026
Special inspection requirement — Fenestration areas
Alan Yang
04/17/2026
Special inspection requirement — Final
Alan Yang
04/17/2026
Special inspection requirement — Insulation placement and R values
Alan Yang
04/15/2026
Permit issued — Plumbing
B01186379-I1-PL
04/10/2026
Filed — Alteration
INTERIOR RENOVATION OF EXISTING FOUR FAMILY WITH GENERAL CONSTRUCTION & MECHANICAL WORK AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B01165078-P2
03/06/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alan Yang
01/26/2026
Filed — Alteration
TO PROPOSE PLUMBING WORK FOR EXISTING 4-FAMILY HOUSE IN CONJUNCTION WITH ALT-2 JOB B01165078 AS PER PLAN FILLED HEREWITH, NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B01186379-P2
01/19/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/25/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING FOUR FAMILY WITH GENERAL CONSTRUCTION & MECHANICAL WORK AS PER PLAN FILED HEREWITH. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B01165078-P1
08/25/2025
Filed — Alteration
TO PROPOSE PLUMBING WORK FOR EXISTING 4-FAMILY HOUSE IN CONJUNCTION WITH ALT-2 JOB B01165078 AS PER PLAN FILLED HEREWITH, NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B01186379-P1
06/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/09/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/06/2025
Violation issued (HPD, closed)
A
05/21/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
05/21/2025
Inspection — Certified Sprinkler (PL) - SP - Roughing
Certified
View inspection ↗
04/29/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/06/2025
Permit issued — Plumbing
B01186379-I1-PL
03/03/2025
Permit issued — Mechanical Systems
B01165078-I1-GC-CX
Latest 60 of 78 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offHT BUILDS LLC04/20/2026
DOB NOWPlumbingPermit IssuedXH&RC PLBG AND HTG INC04/15/2026
DOB NOWPlumbingPermit IssuedXH&RC PLBG AND HTG INC03/06/2025
DOB NOWMechanical SystemsSigned-offKALE CONSTRUCTION INC03/03/2025
1 job · most recent 04/17/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/17/2026Signed-offHT BUILDS LLCAir Conditioning Systems
Cooling
Gree MULTI 12HP230VICO( OUTDOOR), MULTI 24HP230VICO( OUTDOOR), MULTI 18HP230VICO( OUTDOOR) VIR09HP230VIBH(INDOOR), VIR12HP230VIBH(INDOOR) 24,000 BTU · Split System ×72
1 job · most recent 01/26/2026
Gas Water/Sanitary
FiledStatusContractorScope
01/26/2026Permit IssuedXH&RC PLBG AND HTG INCGas, Water/Sanitary
3 jobs · most recent 05/02/2025
General Wiring
FiledStatusContractorScope
05/02/2025CompleteNY FOREVER ELECTRIC LLCGeneral Wiring
12/30/2022Permit IssuedALL WAYS ELECTRIC CORP.W—
03/07/2022CompleteGOODALL ELECTRIC CORP5 meters
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/05/2026Fail-Final General Construction Non-Directive 14FailView ↗
03/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/19/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/21/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
05/21/2025Certified Sprinkler (PL) - SP - RoughingCertifiedView ↗
04/29/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/20/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
04/17/2026Fire-Resistant Penetrations and JointsAlan Yangspecial
04/17/2026Mechanical SystemsAlan Yangspecial
04/17/2026FinalAlan Yangprogress
04/17/2026Energy Code Compliance InspectionsAlan Yangprogress
04/17/2026Fire-Resistance Rated ConstructionAlan Yangprogress
04/17/2026Air barrier - visual inspectionAlan Yangenergy_progress
04/17/2026Insulation placement and R valuesAlan Yangenergy_progress
04/17/2026HVAC-R and service water heating system controlsAlan Yangenergy_progress
04/17/2026Fenestration air leakageAlan Yangenergy_progress
04/17/2026Fenestration and door U-factor and product ratingsAlan Yangenergy_progress
04/17/2026HVAC-R and service water heating equipmentAlan Yangenergy_progress
04/17/2026Interior lighting powerAlan Yangenergy_progress
04/17/2026HVAC-R and service water piping design and insulationAlan Yangenergy_progress
04/17/2026Fenestration areasAlan Yangenergy_progress
04/17/2026Fire-Resistant Penetrations and JointsAlan Yangspecial
04/17/2026Air barrier - visual inspectionAlan Yangenergy_progress
04/17/2026Fenestration and door U-factor and product ratingsAlan Yangenergy_progress
04/17/2026HVAC-R and service water heating equipmentAlan Yangenergy_progress
04/17/2026HVAC-R and service water heating system controlsAlan Yangenergy_progress
04/17/2026HVAC-R and service water piping design and insulationAlan Yangenergy_progress
04/17/2026Fenestration air leakageAlan Yangenergy_progress
04/17/2026Insulation placement and R valuesAlan Yangenergy_progress
04/17/2026Interior lighting powerAlan Yangenergy_progress
04/17/2026Fenestration areasAlan Yangenergy_progress
04/17/2026Fire-Resistance Rated ConstructionAlan Yangprogress
Latest 25 of 67.
▾Documents — 81 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026B00842901-I1Request digital key ↗
08/18/2026B01186379-I1Request digital key ↗
08/18/2026B01186379-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications73
▸DOB NOWProgress Inspector Seal & Signature53
09/02/2026B01186379-P1Open ↗
09/02/2026B01186379-P1Open ↗
09/02/2026B01165078-P2Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026B01186379-P1Open ↗
09/02/2026B01165078-P2Open ↗
09/02/2026B01165078-P2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/18/2026B01186379-I1Open ↗
08/18/2026B01186379-P1Open ↗
08/17/2026B01165078-P1Open ↗
Showing 3 of 8 on file for this type