← Back
Primarily 3 family with 1 store or office
7803 13 AVENUE
BROOKLYN · BIN 3161891
💬 Discuss this project
1931Year Built
2Stories
S3Building Class
R5BZoning
2,600 sfGross Floor Area
4Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 3 family with 1 store or office · 2,000 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingCivil
Permit Issued — active, not yet Signed-off
Floor 2Under Construction7p · 2 filings · 19 docs
Floor 1Under Construction6p · 2 filings · 19 docs
CellarUnder Construction9p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LUCKY 1 CONVENIENCE INC503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BUILDING CONSULTING ENGINEERING106/17/2026
HPL ENGINEERING P.C.304/22/2026
JOSE L. PENA,P.E.103/18/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOUIS STRIAR203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor106/28/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/16/2026
L S SIGNScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613204/22/2026
Building Lifecycle
All (67)Filed (5)Permit Issued (3)Signed Off (1)Violation (38)Objection (10)Special Inspection (10)
07/15/2026
Permit issued — Plumbing
B01381701-S1-PL
06/22/2026
Permit issued — General Construction
B01418519-I1-GC
06/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
06/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
06/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
06/17/2026
Filed — Alteration
RENOVATE CELLAR, 1ST & 2ND FLOOR FOR AN EXISTING 2 STORY, 3 DWELLING UNIT. NEW PARTITION, DOOR, FLOORING & COSMETIC WORK AS PER PLAN SUBMITTED. PL AND BL WORK TO BE FILED SUB-SEQUENCE. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01418519-I1
04/28/2026
Objection raised — Mechanical
04/28/2026
Objection raised — Inspections
04/28/2026
Objection raised — Mechanical
04/28/2026
Objection raised — Scope
04/28/2026
Objection raised — Admin
04/28/2026
Objection raised — Scope
04/28/2026
Objection raised — Cost
04/28/2026
Objection raised — Cost
04/28/2026
Objection raised — Admin
04/28/2026
Objection raised — Fire_Protection
04/22/2026
Filed — Alteration
SUBSEQUENCE BOILER WORK IN-CONJUNCTION WITH DOBNow GC JOB#: B01381701-I1. CAP & REMOVE EXISTING BOILER & INSTALL NEW BOILER AS PER PLAN SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01381701-S2
04/22/2026
Filed — Alteration
SUBSEQUENCE BOILER WORK IN-CONJUNCTION WITH DOBNow GC JOB#: B01381701-I1. CAP & REMOVE EXISTING BOILER & INSTALL NEW BOILER AS PER PLAN SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01381701-I1
04/22/2026
Filed — Alteration
SUBSEQUENCE BOILER WORK IN-CONJUNCTION WITH DOBNow GC JOB#: B01381701-I1. CAP & REMOVE EXISTING BOILER & INSTALL NEW BOILER AS PER PLAN SUBMITTED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01381701-S1
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
04/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
04/22/2026
Special inspection requirement — Fenestration air leakage
Fran Huang
04/22/2026
Special inspection requirement — Fenestration areas
Fran Huang
04/22/2026
Special inspection requirement — Interior lighting power
Fran Huang
04/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
04/22/2026
Special inspection requirement — Air barrier - visual inspection
Fran Huang
04/03/2024
Violation issued (HPD, closed)
A
10/14/2023
Violation issued (HPD, closed)
B
10/14/2023
Violation issued (HPD, closed)
C
08/27/2023
Violation issued (HPD, closed)
A
08/27/2023
Violation issued (HPD, closed)
B
08/27/2023
Violation issued (HPD, closed)
C
08/27/2023
Violation issued (HPD, closed)
B
08/27/2023
Violation issued (HPD, closed)
A
08/27/2023
Violation issued (HPD, closed)
A
08/27/2023
Violation issued (HPD, closed)
A
08/27/2023
Violation issued (HPD, closed)
A
08/27/2023
Violation issued (HPD, closed)
B
08/27/2023
Violation issued (HPD, closed)
A
08/27/2023
Violation issued (HPD, closed)
C
08/27/2023
Violation issued (HPD, closed)
C
08/27/2023
Violation issued (HPD, closed)
A
08/27/2023
Violation issued (HPD, closed)
B
08/27/2023
Violation issued (HPD, closed)
B
08/27/2023
Violation issued (HPD, closed)
B
08/27/2023
Violation issued (HPD, closed)
A
08/27/2023
Violation issued (HPD, closed)
B
03/20/2023
Violation issued (HPD, closed)
A
02/18/2022
Violation issued (HPD, closed)
A
02/18/2022
Violation issued (HPD, closed)
I
04/06/2021
Violation issued (HPD, closed)
A
04/06/2021
Violation issued (HPD, closed)
I
01/08/2021
Signed off — Alteration
B00321806-I1
03/19/2020
Permit issued — Sign
B00321806-I1-SG
03/18/2020
Filed — Alteration
B00321806-I1
10/12/2018
Violation issued (HPD, closed)
I
08/24/2018
Violation issued (ECB, closed)
Construction
08/24/2018
Violation issued (ECB, closed)
Zoning
08/24/2018
Violation issued (ECB, closed)
Construction
11/15/2017
Violation issued (HPD, closed)
I
Latest 60 of 67 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.07/15/2026
DOB NOWGeneral ConstructionPermit IssuedKALE CONSTRUCTION INC06/22/2026
DOB NOWSignSigned-offWEINFELD, ELLIOT03/19/2020
BIS—ISSUEDN/A06/19/2002
BISPLISSUEDLOVERDE PLBG & HTG CORP06/13/2002
BIS—ISSUEDN/A04/10/2002
1 job · most recent 04/22/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/22/2026Permit IssuedAMERICAN STANDARD P&H CORGas, Water/Sanitary
1 job · most recent 07/09/2026
General Wiring
FiledStatusContractorScope
07/09/2026Permit IssuedGALAXY ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/22/2026HVAC-R and service water heating equipmentFran Huangenergy_progress
06/22/2026HVAC-R and service water heating system controlsFran Huangenergy_progress
06/22/2026HVAC-R and service water piping design and insulationFran Huangenergy_progress
04/22/2026Fire-Resistant Penetrations and JointsFran Huangspecial
04/22/2026Energy Code Compliance InspectionsFran Huangprogress
04/22/2026Fenestration air leakageFran Huangenergy_progress
04/22/2026Fenestration areasFran Huangenergy_progress
04/22/2026Interior lighting powerFran Huangenergy_progress
04/22/2026Fenestration and door U-factor and product ratingsFran Huangenergy_progress
04/22/2026Air barrier - visual inspectionFran Huangenergy_progress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
08/17/2026B01381701-S1Request digital key ↗
08/17/2026B01381701-I1Request digital key ↗
08/17/2026B01381701-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sign1
09/02/2026B00321806-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
08/26/2026B01381701-I1Open ↗
08/26/2026B01381701-I1Open ↗
08/26/2026B01381701-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026B01381701-I1Open ↗
08/17/2026B01381701-S2Open ↗
08/17/2026B01381701-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B01381701-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/17/2026B01381701-I1Open ↗
08/17/2026B01381701-S2Open ↗
08/17/2026B01381701-S1Open ↗
Showing 3 of 5 on file for this type