← Back
Two family brick
8101 11 AVENUE
BROOKLYN · BIN 3163506
💬 Discuss this project
1935Year Built
2Stories
B1Building Class
R4-1Zoning
—Gross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · 0.76 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 21p · 1 filing · 4 docs
Floor 12p · 2 filings · 10 docs
Basement5p · 2 filings · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BILLAH ENGINEERING PLLC511/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAJO, CARLOSElectrical103/21/2026
HI-RITE ELECTRIC CORPElectrical103/22/2026
WALTERS, JAMESElectrical103/21/2026
SPLEN CONSTRUCTION INCGeneral Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
Building Lifecycle
All (20)Filed (5)Permit Issued (2)Signed Off (2)Violation (7)Inspection (4)
01/20/2022
Signed off — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK AS PER PLAN : REPLACE KITCHEN AND BATHROOM FIXTURES; (1) NEW COMBI BOILER ON SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00557752-I1
01/20/2022
Signed off — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERA LCONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00557742-I1
01/18/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/13/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/14/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/10/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/06/2021
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK AS PER PLAN : REPLACE KITCHEN AND BATHROOM FIXTURES; (1) NEW COMBI BOILER ON SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00557752-P2
11/06/2021
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERA LCONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00557742-P1
09/14/2021
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK AS PER PLAN : REPLACE KITCHEN AND BATHROOM FIXTURES; (1) NEW COMBI BOILER ON SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00557752-P1
07/28/2021
Permit issued — Plumbing
B00557752-I1-PL
07/22/2021
Permit issued — General Construction
B00557742-I1-GC
07/20/2021
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH PLUMBING WORK AS PER PLAN : REPLACE KITCHEN AND BATHROOM FIXTURES; (1) NEW COMBI BOILER ON SECOND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00557752-I1
07/20/2021
Filed — Alteration
RENOVATION OF EXISTING BASEMENT, FIRST AND SECOND FLOOR WITH GENERA LCONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00557742-I1
12/13/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/15/2017
Violation issued (ECB, closed)
Unknown
09/15/2017
Violation issued (ECB, closed)
Construction
09/15/2017
Violation issued (ECB, closed)
Construction
07/10/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC07/28/2021
DOB NOWGeneral ConstructionSigned-offSPLEN CONSTRUCTION INC07/22/2021
BISPLISSUEDK.H. WERBER PLBG CO INC07/30/2019
BISPLISSUEDTRI STATE PLBG & HTG INC01/19/2018
BISOTISSUEDNEWLAND CONSTRUCTION INC01/10/2018
1 project · most recent 01/24/2018
General Wiring
FiledStatusContractorScope
01/24/2018Permit IssuedHI-RITE ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/18/2022Pass-Final General Construction Non-Directive 14PassView ↗
01/13/2022Fail-Final General Construction Non-Directive 14FailView ↗
12/14/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/10/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Documents — 34 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/31/2026B00557752-P2Request digital key ↗
08/31/2026B00557752-I1Request digital key ↗
08/31/2026B00557752-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION2
07/31/2019321677538Open ↗
01/11/2018321677538Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
03/21/2019321677538Open ↗
01/11/2018321677538Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
03/05/2019321677538Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026B00557752-I1Open ↗
08/13/2026B00557752-P1Open ↗
08/13/2026B00557742-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/11/2018321677538Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/11/2018321677538Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/11/2018321677538Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/21/2019321677538Open ↗
01/11/2018321677538Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/11/2018321677538Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/11/2018321677538Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/28/2020321677538Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/30/2020321677538Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/28/2020321677538Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/05/2021321677538Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/28/2020321677538Open ↗
01/11/2018321677538Open ↗
▸Filing & Intake Forms4
▸BISADDITIONAL INFORMATION3
11/19/2020321677538Open ↗
12/04/2019321677538Open ↗
03/21/2019321677538Open ↗
▸BISEFILING COVER SHEET1
01/10/2018321677538Open ↗
▸Other Documents2
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
01/05/2021321677538Open ↗
12/28/2020321677538Open ↗