← Back
Three families
2221 84 STREET
BROOKLYN · BIN 3165304
💬 Discuss this project
1970Year Built
3Stories
C0Building Class
R5Zoning
3,430 sfGross Floor Area
3Units
7 Open Violations ▸FDNY Report ↗
Three families · 3,000 sf lot · 1.14 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
Floor 3Under Construction2p · 2 filings · 11 docs
Floor 2Under Construction3p · 2 filings · 11 docs
Floor 1Under Construction1p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JIAN ENGINEERING PLLC212/10/2025
FACTORY ENGINEERING WORKS PLLC107/10/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KON HO LEE CONSULTING ENGINEER PLL203/21/2026
SD DESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACER CONSTRUCTION INCGeneral Contractor104/09/2026
NEW FINEST BUILDERS INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JIAN ENGINEERING PLLC7397212/10/2025
FACTORY ENGINEERING WORKS8855107/10/2025
Building Lifecycle
All (14)Filed (3)Permit Issued (2)Violation (7)Special Inspection (2)
09/16/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/03/2026
Violation issued (ECB, open)
Construction
06/24/2026
Violation issued (ECB, open)
Construction
03/31/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/10/2025
Filed — Alteration
THE DRAWINGS HEREIN ARE RELATED TO AN ADDITION TO EXISTING BRICK BUILDINGFRONT BALCONY AT SECOND AND THIRD FLOOR. REMEDY CURE DOB VIOLATION #: 051925CPI31101SB;081225CPI31101ZT
B01291969-P1
12/01/2025
Violation issued (ECB, open)
Construction
10/15/2025
Permit issued — General Construction
B01291969-I1-GC-CX
10/02/2025
Filed — Alteration
THE DRAWINGS HEREIN ARE RELATED TO AN ADDITION TO EXISTING BRICK BUILDINGFRONT BALCONY AT SECOND AND THIRD FLOOR. REMEDY CURE DOB VIOLATION #: 051925CPI31101SB;081225CPI31101ZT
B01291969-I1
08/29/2025
Permit issued — General Construction
B01251325-I1-GC
08/12/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/10/2025
Filed — Alteration
Replacement of balcony and canopy as per plan. To remedy DOB violation #P131101SB. No change in use occupancy or egress.
B01251325-I1
07/09/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kui He
07/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Kui He
05/19/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedACER CONSTRUCTION INC10/15/2025
DOB NOWGeneral ConstructionPermit IssuedNEW FINEST BUILDERS INC08/29/2025
1 project · most recent 12/10/2025
Steel Concrete
FiledStatusContractorScope
12/10/2025Permit IssuedACER CONSTRUCTION INCSteel, Concrete
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
07/09/2025Structural Stability – Alterations of existing buildingsKui Hespecial
07/09/2025Energy Code Compliance InspectionsKui Heprogress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026B01251325-I1Request digital key ↗
08/19/2026B01291969-I1Request digital key ↗
08/19/2026B01291969-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026B01251325-I1Open ↗
08/13/2026B01291969-P1Open ↗
08/13/2026B01291969-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B01251325-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026B01251325-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026B01251325-I1Open ↗
08/13/2026B01291969-P1Open ↗
08/13/2026B01291969-I1Open ↗