← Back
Multi-story retail building (2+)
1929 86 STREET
BROOKLYN · BIN 3165820
💬 Discuss this project
1927Year Built
2Stories
K2Building Class
R5Zoning
3,120 sfGross Floor Area
1Units
Multi-story retail building (2+) · Owner of record: 1929 REALTY LLC · 1,950 sf lot · 1.6 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof3p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
97 FAVOR TASTE RESTAURANT INC1503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/31/2016$1.8M—— → —$577/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LU ENGINEERING SERVICE PC508/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MEGA GENERAL CONSTRUCTIONGeneral Contractor303/21/2026
GOODALL ELECTRIC CORPElectrical103/22/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LU ENGINEERING SERVICE PC6575508/20/2024
Building Lifecycle
All (56)Filed (5)Permit Issued (2)Signed Off (2)Inspection (5)Objection (12)Special Inspection (30)
01/14/2025
Signed off — Alteration
PROPOSED GAS AND PLUMBING WORK ON CELLAR AND 1ST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01016640-I1
01/14/2025
Signed off — Alteration
PROPOSED GAS AND PLUMBING WORK ON CELLAR AND 1ST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01016640-S1
11/26/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/23/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DONGSHENG LU
08/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
DONGSHENG LU
08/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
DONGSHENG LU
08/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
DONGSHENG LU
08/23/2024
Special inspection requirement — Energy Code Compliance Inspections
DONGSHENG LU
08/20/2024
Filed — Alteration
PROPOSED GAS AND PLUMBING WORK ON CELLAR AND 1ST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01016640-P3
08/19/2024
Special inspection requirement — Energy Code Compliance Inspections
DONGSHENG LU
08/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
DONGSHENG LU
08/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
DONGSHENG LU
08/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
DONGSHENG LU
08/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DONGSHENG LU
06/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/07/2024
Special inspection requirement — Energy Code Compliance Inspections
DONGSHENG LU
06/07/2024
Special inspection requirement — Shutoff dampers
DONGSHENG LU
06/07/2024
Special inspection requirement — Maintenance information
DONGSHENG LU
06/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
DONGSHENG LU
06/07/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
DONGSHENG LU
06/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
DONGSHENG LU
06/07/2024
Special inspection requirement — Interior lighting power
DONGSHENG LU
06/07/2024
Special inspection requirement — Fenestration air leakage
DONGSHENG LU
06/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
DONGSHENG LU
06/07/2024
Special inspection requirement — Mechanical Systems
DONGSHENG LU
06/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DONGSHENG LU
06/07/2024
Special inspection requirement — Post-installed Anchors
DONGSHENG LU
06/07/2024
Special inspection requirement — Heating Systems
DONGSHENG LU
06/07/2024
Special inspection requirement — Final
Fran Huang
06/06/2024
Objection raised — Scope
06/06/2024
Objection resolved — Addressed
05/31/2024
Filed — Alteration
PROPOSED GAS AND PLUMBING WORK ON CELLAR AND 1ST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01016640-P2
05/30/2024
Filed — Alteration
PROPOSED GAS AND PLUMBING WORK ON CELLAR AND 1ST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01016640-P1
05/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
DONGSHENG LU
05/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
DONGSHENG LU
05/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
DONGSHENG LU
05/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DONGSHENG LU
05/29/2024
Special inspection requirement — Energy Code Compliance Inspections
DONGSHENG LU
05/23/2024
Special inspection requirement — Post-installed Anchors
DONGSHENG LU
05/15/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/29/2024
Permit issued — Plumbing
B01016640-S1-PL
04/12/2024
Permit issued — Mechanical Systems
B01016640-I1-GC-CX
04/04/2024
Objection resolved — Addressed
04/04/2024
Objection resolved — Addressed
04/04/2024
Objection resolved — Addressed
04/02/2024
Objection resolved — Addressed
03/26/2024
Objection resolved — Addressed
03/21/2024
Objection raised — Admin
03/21/2024
Objection raised — Scope
03/20/2024
Objection raised — Admin
03/20/2024
Objection raised — Scope
03/20/2024
Objection raised — Structural
03/13/2024
Filed — Alteration
PROPOSED GAS AND PLUMBING WORK ON CELLAR AND 1ST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01016640-I1
03/13/2024
Filed — Alteration
PROPOSED GAS AND PLUMBING WORK ON CELLAR AND 1ST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01016640-S1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.04/29/2024
DOB NOWMechanical SystemsSigned-offMEGA GENERAL CONSTRUCTION04/12/2024
2 projects · most recent 04/10/2026
General Wiring
FiledStatusContractorScope
04/10/2026Permit IssuedGOODALL ELECTRIC CORP3 meters, 2 new_meters
05/06/2024Permit IssuedGOODALL ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/26/2024Pass-Final General Construction Non-Directive 14PassView ↗
10/23/2024Fail-Final General Construction Non-Directive 14FailView ↗
06/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
08/23/2024Fire-Resistant Penetrations and JointsDONGSHENG LUspecial
08/23/2024HVAC-R and service water piping design and insulationDONGSHENG LUenergy_progress
08/23/2024HVAC-R and service water heating equipmentDONGSHENG LUenergy_progress
08/23/2024HVAC-R and service water heating system controlsDONGSHENG LUenergy_progress
08/23/2024Energy Code Compliance InspectionsDONGSHENG LUprogress
08/19/2024Energy Code Compliance InspectionsDONGSHENG LUprogress
08/19/2024HVAC-R and service water heating system controlsDONGSHENG LUenergy_progress
08/19/2024HVAC-R and service water heating equipmentDONGSHENG LUenergy_progress
08/19/2024HVAC-R and service water piping design and insulationDONGSHENG LUenergy_progress
08/19/2024Fire-Resistant Penetrations and JointsDONGSHENG LUspecial
06/07/2024Energy Code Compliance InspectionsDONGSHENG LUprogress
06/07/2024Shutoff dampersDONGSHENG LUenergy_progress
06/07/2024Maintenance informationDONGSHENG LUenergy_progress
06/07/2024HVAC-R and service water heating equipmentDONGSHENG LUenergy_progress
06/07/2024Fenestration and door U-factor and product ratingsDONGSHENG LUenergy_progress
06/07/2024HVAC-R and service water heating system controlsDONGSHENG LUenergy_progress
06/07/2024Interior lighting powerDONGSHENG LUenergy_progress
06/07/2024Fenestration air leakageDONGSHENG LUenergy_progress
06/07/2024HVAC-R and service water piping design and insulationDONGSHENG LUenergy_progress
06/07/2024Mechanical SystemsDONGSHENG LUspecial
06/07/2024Fire-Resistant Penetrations and JointsDONGSHENG LUspecial
06/07/2024Post-installed AnchorsDONGSHENG LUspecial
06/07/2024Heating SystemsDONGSHENG LUspecial
06/07/2024FinalFran Huangprogress
05/29/2024HVAC-R and service water piping design and insulationDONGSHENG LUenergy_progress
Latest 25 of 43.
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026B01016640-S1Request digital key ↗
08/25/2026B01016640-I1Request digital key ↗
08/25/2026B01016640-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications48
▸DOB NOWProgress Inspector Seal & Signature32
09/29/2026B01016640-P2Open ↗
09/29/2026B01016640-P2Open ↗
09/29/2026B01016640-P2Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/29/2026B01016640-P2Open ↗
09/23/2026B01016640-I1Open ↗
09/23/2026B01016640-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/25/2026B01016640-I1Open ↗
08/25/2026B01016640-P3Open ↗
08/25/2026B01016640-P2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/25/2026B01016640-I1Open ↗
08/25/2026B01016640-P3Open ↗
08/25/2026B01016640-P2Open ↗
Showing 3 of 5 on file for this type