Over six families without stores
8678 BAY PARKWAY
BROOKLYN · BIN 3167050
💬 Discuss this project
1915Year Built
4Stories
C1Building Class
R6Zoning
30,960 sfGross Floor Area
29Units
LL97 CoveredRent Stabilized77 Open Violations 75 unresolved · 2 paperwork only ▸FDNY Report ↗
Over six families without stores · Owner of record: BAYVILLE ARMS, LLC · 9,667 sf lot · 3.2 FAR built · Flood zone X
Locations of Work
Architecture
Floor 43p · 1 filing · 19 docs
Floor 3
Floor 2
Floor 1
1 job · most recent 02/05/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/05/2026Signed-offORBIT PLBG & HTG INCGas, Water/Sanitary
3 jobs · most recent 09/09/2025
General Wiring
FiledStatusContractorScope
09/09/2025CompleteKWONG MING ELECTRIC INC1 meters, 1 new_meters
08/30/2024CompleteKWONG MING ELECTRIC INCGeneral Wiring
09/02/2020CompletePOS ELECTRICAL CONTRS INC31 meters, 1 new_meters
Building Lifecycle
All (95)Filed (4)Permit Issued (5)Violation (60)Inspection (6)Objection (16)Special Inspection (4)
05/06/2026
Violation issued (HPD, closed)
C
05/06/2026
Violation issued (HPD, closed)
B
05/06/2026
Violation issued (HPD, closed)
C
02/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
02/26/2026
Objection resolved — Addressed
02/19/2026
Objection raised — Other
02/13/2026
Objection resolved — Addressed
02/12/2026
Objection raised — Other
02/05/2026
Filed — Alteration
DEMOLITION OF EXISTING KITCHEN & BATHROOM PLUMBING FIXTURES, CONSTRUCTION OF NEW BATHROOM & KITCHEN FIXTURES, RECONNECTION OF NEW FIXTURES TO EXISTING SANITARY, DOMESTIC WATER, & GAS LINE.
B00984092-P1
02/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
INDARDEO PARBHUNATH
01/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/31/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/08/2025
Permit issued — Plumbing
B00984092-S1-PL
08/08/2025
Violation issued (HPD, closed)
A
08/08/2025
Violation issued (HPD, closed)
A
06/24/2025
Violation issued (ECB, open)
Construction
06/24/2025
Violation issued (ECB, open)
Construction
05/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/12/2025
Violation issued (HPD, open)
B
05/12/2025
Violation issued (HPD, open)
B
05/12/2025
Violation issued (HPD, open)
B
05/12/2025
Violation issued (HPD, open)
C
05/12/2025
Violation issued (HPD, open)
C
05/12/2025
Violation issued (HPD, open)
C
05/12/2025
Violation issued (HPD, open)
C
05/12/2025
Violation issued (HPD, open)
C
05/12/2025
Violation issued (HPD, open)
B
05/12/2025
Violation issued (HPD, open)
B
05/12/2025
Violation issued (HPD, open)
B
05/12/2025
Violation issued (HPD, closed)
C
05/12/2025
Violation issued (HPD, open)
B
05/12/2025
Violation issued (HPD, open)
C
04/07/2025
Violation issued (HPD, open)
B
04/07/2025
Violation issued (HPD, open)
B
04/07/2025
Violation issued (HPD, closed)
C
03/19/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/06/2025
Permit issued — General Construction
B00984092-S3-GC
02/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/04/2025
Violation issued (ECB, closed)
Unknown
10/28/2024
Violation issued (HPD, closed)
B
10/28/2024
Violation issued (HPD, closed)
B
10/28/2024
Violation issued (HPD, closed)
B
10/28/2024
Violation issued (HPD, closed)
B
10/28/2024
Violation issued (HPD, closed)
C
10/28/2024
Violation issued (HPD, closed)
B
10/28/2024
Violation issued (HPD, closed)
B
10/28/2024
Violation issued (HPD, closed)
B
10/28/2024
Violation issued (HPD, closed)
B
10/28/2024
Violation issued (HPD, closed)
C
10/28/2024
Violation issued (HPD, closed)
C
10/28/2024
Violation issued (HPD, closed)
B
10/28/2024
Violation issued (HPD, closed)
B
10/03/2024
Permit issued — Plumbing
B00984092-S1-PL
09/27/2024
Permit issued — General Construction
B00984092-S3-GC
09/11/2024
Objection resolved — Addressed
09/05/2024
Filed — Alteration
DEMOLITION OF EXISTING KITCHEN & BATHROOM PLUMBING FIXTURES, CONSTRUCTION OF NEW BATHROOM & KITCHEN FIXTURES, RECONNECTION OF NEW FIXTURES TO EXISTING SANITARY, DOMESTIC WATER, & GAS LINE.
B00984092-S1
09/04/2024
Objection raised — Accessibility
09/04/2024
Objection resolved — Addressed
09/04/2024
Objection raised — Accessibility
Latest 60 of 95 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NAAD REALTY607/08/2026
BAYVILLE ARMS, LLC903/22/2026
O A CONSTRUCTION103/22/2026
MERIDIAN MANAGEMENT, LLC203/21/2026
MVN REALTY203/21/2026
8674-78 BAY PARKWAY OWNERS203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/12/2019$7.2M—MVN REALTY LLC → BAYVILLE ARMS, LLC$233/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEE ENGINEERING & CONSULTING LLC402/05/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEE ENGINEERING CONSULTING603/21/2026
G PLAN DESIGN CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
O. A. CONSTRUCTION INCGeneral Contractor507/08/2026
CHRISTOPHER STABILEElectrical203/21/2026
STABILE CHRISTOPHERElectrical203/21/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252202/05/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC10/08/2025
DOB NOWGeneral ConstructionPermit IssuedO. A. CONSTRUCTION INC03/06/2025
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC10/03/2024
DOB NOWGeneral ConstructionPermit IssuedO. A. CONSTRUCTION INC09/27/2024
DOB NOWGeneral ConstructionPermit IssuedO. A. CONSTRUCTION INC07/10/2024
BISFBISSUEDWASOFF PLBG. & UTL.CO INC06/16/2015
BISPLISSUEDMARATHON MECHANICAL LLC06/16/2015
BISBLISSUEDJACK PICCINI, INC02/24/2006
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/31/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
02/27/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
02/03/2026Fire-Resistant Penetrations and JointsINDARDEO PARBHUNATHspecial
01/03/2024Energy Code Compliance InspectionsGreg Leeprogress
01/03/2024FinalGreg Leeprogress
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/18/2026B00984092-S1Contact architect ↗
08/18/2026B00984092-I1Contact architect ↗
08/14/2026B00984092-S3Contact architect ↗
Showing 3 of 4 on file for this type
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION2
06/15/2015340271093Open ↗
06/15/2015340271093Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
06/15/2015340271093Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/18/2026B00984092-S1Open ↗
08/18/2026B00984092-P1Open ↗
08/18/2026B00984092-S3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/26/2026B00984092-S1Open ↗
08/24/2026B00984092-P1Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/15/2015340271093Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/15/2015340271093Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/15/2015340271093Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/23/2015340271093Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026B00984092-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
06/15/2015340271093Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
06/15/2015340271093Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/18/2026B00984092-S1Open ↗
08/18/2026B00984092-I1Open ↗
08/14/2026B00984092-S3Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/15/2015340271093Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/15/2015340271093Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/23/2015340271093Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/15/2015340271093Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/23/2015340271093Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/15/2015340271093Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/23/2015340271093Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/23/2015340271093Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
11/23/2015340271093Open ↗
06/15/2015340271093Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
06/15/2015340271093Open ↗
▸Other Documents4
▸DOB NOWDHCR Document4
08/18/2026B00984092-S1Open ↗
08/13/2026B00984092-P1Open ↗
08/13/2026B00984092-I1Open ↗
Showing 3 of 4 on file for this type