← Back
One story retail building
1230 CONEY ISLAND AVENUE
BROOKLYN · BIN 3170583
💬 Discuss this project
1931Year Built
1Stories
K1Building Class
C8-2Zoning
4,170 sfGross Floor Area
1Units
11 Open Violations 3 unresolved · 8 paperwork only ▸FDNY Report ↗
One story retail building · Owner of record: 1234 CONEY ISLAND AVENUE LLC · 14,000 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Permit Issued — active, not yet Signed-off
Roof2p · 1 filing · 12 docs
Floor 1Under Construction7p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TESTA ELECTRIC CO., INC203/22/2026
1234 CONEY ISLAND AVE1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SHAWN STILES210/23/2025
GRID DRAFTING AND CONSULTING LLC110/21/2025
ANZ CONSULTING ENGINEERING, PLLC109/18/2025
FIDATO ENGINEERS101/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SIERRA SAFETY CORP203/21/2026
BOYD CONSULTING203/21/2026
MMSR CONSULTING GROUP LLC203/21/2026
NEXUS CONSULTING NYC, INC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MILLWRIGHT LOCAL 740Electrical103/21/2026
SPADARO, STEPHENElectrical103/21/2026
MKSSKR CONSULTING SERVICEGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369210/23/2025
ANZ CONSULTING ENGINEERIN3946109/18/2025
Building Lifecycle
All (51)Filed (5)Permit Issued (1)Violation (17)Objection (15)Special Inspection (13)
04/27/2026
Permit issued — General Construction
B01286577-I1-GC
04/08/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/25/2026
Objection resolved — Addressed
03/19/2026
Objection raised — Fire_Protection
03/19/2026
Objection raised — Fire_Protection
03/19/2026
Objection raised — Fire_Protection
03/19/2026
Objection raised — Fire_Protection
03/09/2026
Objection resolved — Addressed
10/31/2025
Violation issued (ECB, open)
Construction
10/31/2025
Violation issued (ECB, open)
Construction
10/23/2025
Filed — Alteration CO
B01286577-I1
10/21/2025
Filed — Alteration
B01304135-I1
09/18/2025
Filed — Alteration
INSTALLATION OF NEW MECHANICAL HVAC SYSTEM. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B01284990-I1
09/18/2025
Special inspection requirement — Shutoff dampers
ALBERT ZIRINO
09/18/2025
Special inspection requirement — Energy Code Compliance Inspections
ALBERT ZIRINO
09/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALBERT ZIRINO
09/18/2025
Special inspection requirement — Duct leakage testing, insulation and design
ALBERT ZIRINO
09/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALBERT ZIRINO
09/18/2025
Special inspection requirement — Maintenance information
ALBERT ZIRINO
09/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALBERT ZIRINO
09/10/2025
Special inspection requirement — Mechanical Systems
ALBERT ZIRINO
09/10/2025
Special inspection requirement — Final
ALBERT ZIRINO
05/21/2025
Objection resolved — Addressed
05/21/2025
Objection resolved — Addressed
05/12/2025
Objection raised — Scope
05/12/2025
Objection raised — Cost
05/12/2025
Objection raised — Scope
05/05/2025
Filed — Alteration
Interior renovation to 1st floor commercial store as per plans. No change on use, occupancy or egress.
B01218744-I1
05/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
Luis Pichardo
04/30/2025
Special inspection requirement — Final
04/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
04/23/2025
Violation issued (ECB, open)
Construction
04/23/2025
Violation issued (ECB, open)
Construction
02/03/2025
Objection raised — Scope
02/03/2025
Objection resolved — Addressed
01/28/2025
Filed — Alteration
FILING TO LEGALIZE THE NON ILLUMINATED AWNING AND RETRACTABLE AWNING. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B01154344-I1
12/11/2024
Special inspection requirement — Final
08/29/2024
Violation issued (ECB, open)
Construction
08/29/2024
Violation issued (ECB, open)
Construction
03/23/2022
Violation issued (ECB, closed)
Construction
02/03/2022
Violation issued (ECB, closed)
Construction
12/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/15/2021
Violation issued (ECB, closed)
Construction
10/25/2021
Violation issued (ECB, closed)
Construction
09/07/2021
Violation issued (ECB, open)
Unknown
06/07/2021
Violation issued (FDNY_NOV, closed)
07/02/2020
Violation issued (ECB, open)
Construction
12/03/2013
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/31/2008
Violation issued (ECB, open)
Construction
07/31/2008
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMKSSKR CONSULTING SERVICE04/27/2026
BIS—ISSUEDNORTH SHORE NEON SIGN CO05/15/1991
BISOTISSUEDLEE & LIANG CONST. INC12/20/1990
1 project · most recent 09/18/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/18/2025——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Tosot TWH36AT19D6DO 36,000 BTU · Condensing Unit ×5
Ventilation
Greenheck ERV-20-15H 1,680 CFM · Erv ×1
6 projects · most recent 06/23/2026
General Wiring
FiledStatusContractorScope
06/23/2026Permit IssuedJP & SON ELECTRIC CORPGeneral Wiring
11/04/2023Permit IssuedTESTA ELECTRIC CO., INCGeneral Wiring
11/04/2023Permit IssuedTESTA ELECTRIC CO., INCGeneral Wiring
11/04/2023Permit IssuedTESTA ELECTRIC CO., INCGeneral Wiring
11/04/2023Permit IssuedTESTA ELECTRIC CO., INCGeneral Wiring
01/05/2023Permit IssuedTESTA ELECTRIC CO., INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
09/18/2025Shutoff dampersALBERT ZIRINOenergy_progress
09/18/2025Energy Code Compliance InspectionsALBERT ZIRINOprogress
09/18/2025HVAC-R and service water heating system controlsALBERT ZIRINOenergy_progress
09/18/2025Duct leakage testing, insulation and designALBERT ZIRINOenergy_progress
09/18/2025HVAC-R and service water piping design and insulationALBERT ZIRINOenergy_progress
09/18/2025Maintenance informationALBERT ZIRINOenergy_progress
09/18/2025HVAC-R and service water heating equipmentALBERT ZIRINOenergy_progress
09/10/2025Mechanical SystemsALBERT ZIRINOspecial
09/10/2025FinalALBERT ZIRINOprogress
05/05/2025Fire-Resistance Rated ConstructionLuis Pichardoprogress
04/30/2025Final—progress
04/30/2025Fire-Resistant Penetrations and JointsLuis Pichardospecial
12/11/2024Final—progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Mr. Karun Bhardwaj Apna BazaarRetailFloor 1
Project B01284990 Alteration · Approved · 09/18/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026B01218744-I1Request digital key ↗
08/20/2026B01284990-I1Request digital key ↗
08/20/2026B01304135-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
08/13/2009320061142Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING EXHIBIT III- DESC & OWNERSHIP STMNT1
12/30/2011320061142Open ↗
▸BISZONING EXHIBIT I- CERTIFICATION1
01/09/2012320061142Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01286577-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature8
08/26/2026B01284990-I1Open ↗
08/26/2026B01284990-I1Open ↗
08/26/2026B01284990-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026B01218744-I1Open ↗
08/20/2026B01304135-I1Open ↗
08/20/2026B01286577-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
01/25/2012320061142Open ↗
01/25/2012320061142Open ↗
08/13/2009320061142Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B01284990-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
08/13/2009320061142Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
03/22/2011320061142Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
08/13/2009320061142Open ↗
▸DOB NOWStreet Tree Checklist1
08/20/2026B01286577-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/21/2026B01218744-I1Open ↗
08/20/2026B01286577-I1Open ↗
08/13/2026B01284990-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/26/2012320061142Open ↗
▸Approvals, Objections & Sign-offs2
▸BISSCHEDULE A - OCCUPANCY / USE1
08/13/2009320061142Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/13/2009320061142Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
08/13/2009320061142Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
08/13/2009320061142Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM1
08/13/2009320061142Open ↗
▸DOB NOWProperty Ownership Certification1
08/20/2026B01286577-I1Open ↗