← Back
Two stories - detached, small or mid-size
1080 EAST 4 STREET
BROOKLYN · BIN 3170724
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R3-1Zoning
—Gross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 1.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Roof2p · 1 filing · 18 docs
Floor 21p · 1 filing · 18 docs
Floor 14p · 1 filing · 18 docs
Cellar3p · 1 filing · 18 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MZ ARCHITECTURE PLLC404/23/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEONID ARLYUKElectrical103/21/2026
Building Lifecycle
All (31)Filed (4)Violation (2)Special Inspection (25)
05/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
04/23/2026
Filed — Alteration
B01379901-S1
04/23/2026
Filed — Alteration
B01379901-S2
04/23/2026
Filed — Alteration
B01379901-S3
04/23/2026
Filed — Alteration
B01379901-I1
04/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/23/2026
Special inspection requirement — Maintenance information
04/23/2026
Special inspection requirement — Duct leakage testing, insulation and design
04/23/2026
Special inspection requirement — Concrete - Cast-In-Place
04/23/2026
Special inspection requirement — Subgrade Inspections
04/23/2026
Special inspection requirement — Interior lighting power
04/23/2026
Special inspection requirement — Maintenance information
04/23/2026
Special inspection requirement — Permanent certificate
04/23/2026
Special inspection requirement — Insulation placement and R values
04/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
04/23/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
04/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/23/2026
Special inspection requirement — Energy Code Compliance Inspections
04/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
04/23/2026
Special inspection requirement — Exterior lighting power
04/23/2026
Special inspection requirement — Air barrier — testing
04/23/2026
Special inspection requirement — Fenestration air leakage
04/23/2026
Special inspection requirement — Air barrier - visual inspection
04/23/2026
Special inspection requirement — Fenestration areas
03/29/2026
Special inspection requirement — Final
03/29/2026
Special inspection requirement — Mechanical Systems
03/29/2026
Special inspection requirement — Final
03/29/2026
Special inspection requirement — Footing and Foundation
01/16/2015
Violation issued (ECB, closed)
Unknown
12/04/2014
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDC.R.U. MECHAN & HEAT INC10/26/2001
BIS—ISSUEDPANORAMA INTERNATIONAL CO01/02/2001
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
05/12/2026Structural Stability – Alterations of existing buildings—special
04/23/2026Fire-Resistant Penetrations and Joints—special
04/23/2026HVAC-R and service water piping design and insulation—energy_progress
04/23/2026Maintenance information—energy_progress
04/23/2026Duct leakage testing, insulation and design—energy_progress
04/23/2026Concrete - Cast-In-Place—special
04/23/2026Subgrade Inspections—special
04/23/2026Interior lighting power—energy_progress
04/23/2026Maintenance information—energy_progress
04/23/2026Permanent certificate—energy_progress
04/23/2026Insulation placement and R values—energy_progress
04/23/2026Fenestration and door U-factor and product ratings—energy_progress
04/23/2026Subsurface Investigations (Borings/Test Pits)—special
04/23/2026Fire-Resistant Penetrations and Joints—special
04/23/2026Energy Code Compliance Inspections—progress
04/23/2026Fire-Resistance Rated Construction—progress
04/23/2026Exterior lighting power—energy_progress
04/23/2026Air barrier — testing —energy_progress
04/23/2026Fenestration air leakage—energy_progress
04/23/2026Air barrier - visual inspection—energy_progress
04/23/2026Fenestration areas—energy_progress
03/29/2026Final—progress
03/29/2026Mechanical Systems—special
03/29/2026Final—progress
03/29/2026Footing and Foundation—progress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/17/2026B01379901-S3Request digital key ↗
08/17/2026B01379901-S2Request digital key ↗
08/17/2026B01379901-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026B01379901-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/17/2026B01379901-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/17/2026B01379901-S3Open ↗
08/17/2026B01379901-S2Open ↗
08/17/2026B01379901-S1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026B01379901-S2Open ↗
08/17/2026B01379901-S1Open ↗
08/17/2026B01379901-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/17/2026B01379901-I1Open ↗
▸DOB NOWSOIL REPORT1
08/17/2026B01379901-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/17/2026B01379901-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026B01379901-I1Open ↗
▸DOB NOWPlot Diagram1
08/17/2026B01379901-I1Open ↗