← Back
Two stories - detached, small or mid-size
1114 EAST 4 STREET
BROOKLYN · BIN 3170732
💬 Discuss this project
1935Year Built
2.75Stories
A1Building Class
R3-1Zoning
3,441 sfGross Floor Area
1Units
4 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof1p · 1 filing · 11 docs
Floor 21p · 1 filing · 11 docs
Floor 13p · 1 filing · 11 docs
Cellar1p · 1 filing · 11 docs
1 job · most recent 04/22/2025
Steel Wood
FiledStatusContractorScope
04/22/2025——Steel, Wood
Building Lifecycle
All (73)Filed (1)Violation (4)Objection (44)Special Inspection (24)
04/17/2026
Violation issued (ECB, open)
Construction
04/17/2026
Violation issued (ECB, open)
Unknown
04/17/2026
Violation issued (ECB, open)
Construction
08/01/2025
Objection resolved — Addressed
07/31/2025
Objection raised — Admin
07/25/2025
Objection resolved — Addressed
07/25/2025
Objection resolved — Addressed
07/15/2025
Objection resolved — Addressed
07/15/2025
Objection resolved — Addressed
07/15/2025
Objection resolved — Addressed
07/15/2025
Objection resolved — Addressed
07/08/2025
Objection resolved — Addressed
07/08/2025
Objection resolved — Addressed
07/08/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
06/09/2025
Objection resolved — Addressed
06/09/2025
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
06/09/2025
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
06/09/2025
Special inspection requirement — Fireplaces
Younes Abouyaala
06/09/2025
Special inspection requirement — Chimneys and vents
Younes Abouyaala
06/09/2025
Special inspection requirement — Structural Steel - Welding
Younes Abouyaala
06/09/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Younes Abouyaala
06/01/2025
Objection resolved — Addressed
06/01/2025
Objection resolved — Addressed
06/01/2025
Objection resolved — Addressed
06/01/2025
Objection resolved — Addressed
06/01/2025
Objection resolved — Addressed
06/01/2025
Objection resolved — Addressed
06/01/2025
Objection resolved — Addressed
06/01/2025
Objection resolved — Addressed
05/22/2025
Objection resolved — Addressed
05/05/2025
Objection raised — Other
05/05/2025
Objection raised — Scope
05/05/2025
Objection raised — Inspections
05/05/2025
Objection raised — Structural
05/05/2025
Objection raised — Zoning
05/05/2025
Objection raised — Code
05/05/2025
Objection raised — Zoning
05/05/2025
Objection raised — Zoning
05/05/2025
Objection raised — Code
05/05/2025
Objection raised — Zoning
05/05/2025
Objection raised — Structural
05/05/2025
Objection raised — Structural
05/05/2025
Objection raised — Admin
05/05/2025
Objection raised — Zoning
05/05/2025
Objection raised — Zoning
05/05/2025
Objection raised — Zoning
05/05/2025
Objection raised — Zoning
05/05/2025
Objection raised — Scope
05/05/2025
Objection raised — Cost
05/05/2025
Objection raised — Other
05/05/2025
Objection raised — Scope
04/22/2025
Filed — Alteration
HORIZONTAL ENLARGEMRNT TO AN EXISTING RESIDENTIAL BUILDING
B01213869-I1
04/22/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Younes Abouyaala
04/22/2025
Special inspection requirement — Final
NAVEEN KUMAR
04/22/2025
Special inspection requirement — Footing and Foundation
Younes Abouyaala
04/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
04/22/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
Latest 60 of 73 events.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRICOLAGE DESIGNS104/22/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519104/22/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDARIEL SERVICES INC07/23/2002
BISEQISSUEDMJM QUALITY CONSTRUCTION INC.05/28/2002
BISOTISSUEDSARCONA_MASONORY CONTRACTING05/22/1997
BISOTISSUEDSARCONA09/09/1996
BISOTISSUEDN/A12/20/1995
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
06/09/2025Structural Wood FrameYounes Abouyaalaprogress
06/09/2025Air barrier - visual inspectionYounes Abouyaalaenergy_progress
06/09/2025FireplacesYounes Abouyaalaenergy_progress
06/09/2025Chimneys and ventsYounes Abouyaalaspecial
06/09/2025Structural Steel - WeldingYounes Abouyaalaspecial
06/09/2025Excavations - Sheeting, Shoring, and BracingYounes Abouyaalaspecial
04/22/2025Structural Steel - High Strength BoltingYounes Abouyaalaspecial
04/22/2025FinalNAVEEN KUMARprogress
04/22/2025Footing and FoundationYounes Abouyaalaprogress
04/22/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
04/22/2025Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
04/22/2025Fenestration air leakageYounes Abouyaalaenergy_progress
04/22/2025Fenestration areasYounes Abouyaalaenergy_progress
04/22/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
04/22/2025Interior lighting powerYounes Abouyaalaenergy_progress
04/22/2025Insulation placement and R valuesYounes Abouyaalaenergy_progress
04/22/2025Maintenance informationYounes Abouyaalaenergy_progress
04/22/2025Permanent certificateYounes Abouyaalaenergy_progress
04/22/2025Protection of exposed foundation insulationYounes Abouyaalaenergy_progress
04/22/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
04/22/2025Structural Cold-Formed SteelYounes Abouyaalaspecial
04/22/2025Structural Steel - DetailsYounes Abouyaalaspecial
04/22/2025Concrete - Cast-In-PlaceYounes Abouyaalaspecial
04/22/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026B01213869-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01213869-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026B01213869-I1Open ↗
08/23/2026B01213869-I1Open ↗
08/23/2026B01213869-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B01213869-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01213869-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01213869-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01213869-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01213869-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01213869-I1Open ↗