Two stories - detached, small or mid-size
412 AVENUE I
BROOKLYN · BIN 3170766
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3-1Zoning
1,504 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,500 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
Floor 2Under Construction9p · 1 filing · 14 docs
Floor 1Under Construction9p · 1 filing · 14 docs
CellarUnder Construction10p · 1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2027 LLC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SHAHRISH SHUVO ENGINEERING P.C.208/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NAPHTALI DEUTSCH ARCHITECTURE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H BUILDING MANAGEMENT INCGeneral Contractor309/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524108/08/2025
Building Lifecycle
All (58)Filed (2)Permit Issued (3)Violation (2)Objection (35)Special Inspection (16)
09/08/2026
Permit issued — Structural
B01263469-I1-GC-CX
08/17/2026
Permit issued — Construction Fence
B01263469-S1-FN
08/03/2026
Permit issued — General Construction
B01263469-I1-GC-CX
01/09/2026
Objection resolved — Addressed
12/30/2025
Objection resolved — Addressed
12/02/2025
Objection resolved — Addressed
12/02/2025
Objection resolved — Addressed
12/02/2025
Objection resolved — Addressed
10/23/2025
Objection raised — Structural
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/21/2025
Objection resolved — Addressed
10/06/2025
Objection raised — Scope
10/06/2025
Objection raised — Scope
10/06/2025
Objection raised — Scope
10/06/2025
Objection raised — Structural
09/25/2025
Objection resolved — Addressed
09/25/2025
Objection resolved — Addressed
09/25/2025
Objection resolved — Addressed
09/25/2025
Objection resolved — Addressed
09/08/2025
Objection resolved — Addressed
09/08/2025
Objection resolved — Addressed
09/08/2025
Objection resolved — Addressed
09/08/2025
Objection resolved — Addressed
08/19/2025
Objection raised — Scope
08/19/2025
Objection raised — Energy
08/19/2025
Objection raised — Scope
08/19/2025
Objection raised — Scope
08/19/2025
Objection raised — Cost
08/19/2025
Objection raised — Scope
08/19/2025
Objection raised — Zoning
08/19/2025
Objection raised — Zoning
08/19/2025
Objection raised — Admin
08/19/2025
Objection raised — Scope
08/19/2025
Objection raised — Scope
08/19/2025
Objection raised — Mechanical
08/19/2025
Objection raised — Zoning
08/08/2025
Filed — Alteration
Installation of temporary 8'-0" wood fence to be removed only after all work is completed.
B01263469-I1
08/08/2025
Filed — Alteration
Installation of temporary 8'-0" wood fence to be removed only after all work is completed.
B01263469-S1
08/05/2025
Special inspection requirement — Maintenance information
Shahrish Shuvo
08/05/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Shahrish Shuvo
08/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
08/05/2025
Special inspection requirement — Wood – High-Load Diaphragms
Shahrish Shuvo
08/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
08/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
08/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
08/05/2025
Special inspection requirement — Structural Wood Frame
Shahrish Shuvo
08/05/2025
Special inspection requirement — Air barrier - visual inspection
Shahrish Shuvo
08/05/2025
Special inspection requirement — Permanent certificate
Shahrish Shuvo
08/05/2025
Special inspection requirement — Fenestration air leakage
Shahrish Shuvo
08/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
08/05/2025
Special inspection requirement — Fenestration areas
Shahrish Shuvo
08/05/2025
Special inspection requirement — Insulation placement and R values
Shahrish Shuvo
08/05/2025
Special inspection requirement — Interior lighting power
Shahrish Shuvo
07/31/2025
Violation issued (ECB, open)
Construction
07/29/2025
Special inspection requirement — Final
Shahrish Shuvo
07/09/2025
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedH BUILDING MANAGEMENT INC09/08/2026
DOB NOWConstruction FencePermit IssuedH BUILDING MANAGEMENT INC08/17/2026
DOB NOWGeneral ConstructionPermit IssuedH BUILDING MANAGEMENT INC08/03/2026
1 project · most recent 08/08/2025
Gas Water/Sanitary
FiledStatusContractorScope
08/08/2025——Gas, Water/Sanitary
1 project · most recent 03/30/2026
General Wiring
FiledStatusContractorScope
03/30/2026Permit IssuedACCURATE ELEC'L CORP.General Wiring
1 project · most recent 08/08/2025
Wood
FiledStatusContractorScope
08/08/2025Permit IssuedH BUILDING MANAGEMENT INCWood
1 project · most recent 08/08/2025
Fence
FiledStatusContractorScope
08/08/2025Permit IssuedH BUILDING MANAGEMENT INCFence
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
08/05/2025Maintenance informationShahrish Shuvoenergy_progress
08/05/2025Exterior Insulation and Finish Systems (EIFS)Shahrish Shuvospecial
08/05/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
08/05/2025Wood – High-Load DiaphragmsShahrish Shuvospecial
08/05/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
08/05/2025Energy Code Compliance InspectionsShahrish Shuvoprogress
08/05/2025Fire-Resistance Rated ConstructionShahrish Shuvoprogress
08/05/2025Structural Wood FrameShahrish Shuvoprogress
08/05/2025Air barrier - visual inspectionShahrish Shuvoenergy_progress
08/05/2025Permanent certificateShahrish Shuvoenergy_progress
08/05/2025Fenestration air leakageShahrish Shuvoenergy_progress
08/05/2025Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
08/05/2025Fenestration areasShahrish Shuvoenergy_progress
08/05/2025Insulation placement and R valuesShahrish Shuvoenergy_progress
08/05/2025Interior lighting powerShahrish Shuvoenergy_progress
07/29/2025FinalShahrish Shuvoprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026B01263469-I1Request digital key ↗
08/21/2026B01263469-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/21/2026B01263469-I1Open ↗
08/13/2026B01263469-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B01263469-I1Open ↗
08/25/2026B01263469-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026B01263469-I1Open ↗
08/21/2026B01263469-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026B01263469-I1Open ↗
08/25/2026B01263469-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/21/2026B01263469-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026B01263469-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01263469-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01263469-I1Open ↗