| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/04/2022 | — | — | Steel, Concrete, Masonry |
| Firm | Filings | Most Recent |
|---|---|---|
| BGM ENGINEERING | 2 | 11/04/2022 |
| J.L.RAMIREZ ARCHITECTS PC | 1 | 11/02/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| BMB BUILDING CONSULTING | 6 | 03/21/2026 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 11/03/2022 | Footing and Foundation | — | progress |
| 11/03/2022 | Masonry | — | special |
| 11/03/2022 | Post-installed Anchors | — | special |
| 11/03/2022 | Structural Cold-Formed Steel | — | special |
| 11/03/2022 | Structural Steel - Details | — | special |
| 11/03/2022 | Structural Steel - High Strength Bolting | — | special |
| 11/03/2022 | Structural Steel - Welding | — | special |
| 11/03/2022 | Wall Panels, Curtain Walls, and Veneers | — | special |
| 11/03/2022 | Final | — | progress |
| 11/03/2022 | Concrete - Cast-In-Place | — | special |
| 11/03/2022 | Structural Stability – Alterations of existing buildings | — | special |
| 11/03/2022 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 11/03/2022 | Final | — | progress |
| 09/25/2022 | Protection of exposed foundation insulation | — | energy_progress |
| 09/25/2022 | Interior lighting power | — | energy_progress |
| 09/25/2022 | Permanent certificate | — | energy_progress |
| 09/25/2022 | Metering | — | energy_progress |
| 09/25/2022 | Fenestration air leakage | — | energy_progress |
| 09/25/2022 | Air barrier — testing | — | energy_progress |
| 09/25/2022 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 09/25/2022 | Fenestration areas | — | energy_progress |
| 09/25/2022 | Air barrier - visual inspection | — | energy_progress |
| 09/25/2022 | Insulation placement and R values | — | energy_progress |
| 05/04/2022 | Energy Code Compliance Inspections | — | progress |
| 05/04/2022 | Fire-Resistance Rated Construction | — | progress |